BPS - 2025 Pavement Program - Pembroke ES - Bid Tab Worksheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Pavement Replacement Pembroke
Solicitation number
RFP-BPS-250000000150-3
Issued by
Berrien County, Blissfield Village, Michigan

About this file

This document is a bid tabulation worksheet for the Bid Package Specs (BPS) 2025 Pavement Program - Pembroke Elementary School (PES) project in Birmingham, Michigan. The project includes milling and full-depth pavement removal, excavation and subbase removal, installation of new aggregate base and asphalt pavement, curb and gutter work, sidewalk replacement, signage, and site restoration work at the PES campus. The bid tabulation provides a detailed list of 60 line items with estimated quantities, unit prices, and extended pricing for the base bid and three alternate bids covering additional work scopes. The bid due date is November 12, 2024, and the project includes a $30,000 contingency allowance.

The bid tabulation shows a base bid total of $30,000.00 and provides pricing alternatives for cement stabilization in Areas P-1 and P-2, hot applied rubberized asphalt sealant and asphalt seal coating in Area P-4.1, and additional pavement work in Area P-5. The worksheet indicates the project will utilize recycled asphalt pavement (RAP) credits. No other pricing terms, set asides, incumbents, funding sources, or contract renewal details are provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Bid Tab Form

T24044 BPS PEMBROKE ES - BIRMINGHAM, MI- BID TABULATION
PROJECT:BID DUE DATE:
2020 BOND, 2025 PAVEMENT REPLACEMENT PROGRAM
- PEMBROKE ELEMENTARY SCHOOL (PES)11/12/24CONTRACTOR NAME
BASE BID: P-1, P-2, P-3, & P-4
ITEMDESCRIPTIONUNITQUANTITYUNIT PRICEEXTENDED PRICE
1.0General Conditions & MobilizationLS1$ - 0
2.0Performance & Payment BondsLS1$ - 0
3.0Contingency AllowanceLS1$ 30,000.00
4.0Provide Necessary Survey for Site Layout & StakingLS1$ - 0
5.0Soil Erosion Control MeasuresLS1$ - 0
6.0Milling 5” +/- Full Depth to Remove All Existing Pavement at Areas P-1SF5,250$ - 0
7.0Milling 4” +/- Full Depth to Remove Existing Pavement at Areas P-2, P-3 & P-4SF64,305$ - 0
8.0Excavate/ Remove 10" of Existing Subbase Material at Area P-1SF5,250$ - 0
9.0Excavate/ Remove 8" of Existing Subbase Material at Area P-2 & P-3SF53,715$ - 0
10.0Allowance for Undercutting Insufficient Sub-Base 12” at Areas P-1, P-2, P-3 & P-4SF3,215$ - 0
11.0Provide MI-DOT 21AA Dense Graded Limestone Aggregate Base C.I.P at Area P-4 as NeededTON95$ - 0
12.0Furnish & Install 6" Underdrain as Shown on PlansLF780$ - 0
13.0Furnish & Install Geotextile Stablization Fabric at Area P-1, P-2 & P-3SY6,552$ - 0
14.0Provide 8" of 21AA Dense Graded Limestone Aggregate Base C.I.P at Area P-2 & P-3SF53,715$ - 0
15.0Provide 10" of 21AA Dense Graded Limestone Aggregate Base C.I.P at Area P-1SF5,250$ - 0
16.0Finish Grade & Compact to Ensure Positive Drainage & Density at Areas P-1, P-2, P-3 & P-4SF69,555$ - 0
17.0Provide 3" HMA MI-DOT 3C (PG 64-22) Base Course at Area P-1SF5,250$ - 0
18.0Provide 2.5" HMA MI-DOT 3C (PG 64-22) Base Course at Area P-2, P-3 & P-4SF64,305$ - 0
19.0Provide 2" HMA MI-DOT 4C (PG 64-22) Surface Course at Areas P-1SF5,250$ - 0
20.0Provide 1.5" HMA MI-DOT 4C (PG 64-22) Surface Course at Areas P-2, P-3 & P-4SF64,305$ - 0
21.0Remove Existing Concrete Curb and Gutter at Areas P-1 & P-2LF462$ - 0
22.0Vertical Reconstruct on Existing Storm Structures Campus Wide per Detail D-3VF3$ - 0
23.0Provide Rolled Concrete Curb at Area P-2 per Detail D-4LF117$ - 0
24.0Provide Concrete Curb and Gutter at Areas P-1 & P-2 per Detail D-5LF345$ - 0
25.0Provide 4' x 4' Concrete Collar per Detail D-6EA1$ - 0
26.0Provide 4' x 8' Concrete Collar per Detail D-6EA1$ - 0
27.0Remove & Replace Existing Concrete Approach Areas P-1.1, P-5.1 & P-5.2 per Detial D-7SF4,410$ - 0
27.1Remove & Replace Existing Concrete Flush Curb & Gutter per Detial D-7LF145$ - 0
28.0Concrete Pavement Full Depth Repair at Approach Area P-2.1SF25$ - 0
29.0Remove & Replace 8" Concrete Pavement at Area P-3 per Detail D-8SF160$ - 0
30.0Remove & Replace 6" Concrete Sidewalk per Detail D-9 & as Shown on the PlansSF1,030$ - 0
31.0Remove & Replace 6" Concrete Sidewalk Ramp per Detail D-10 in Area P-2 & as Shown on the PlansSF100$ - 0
32.0Remove & Replace Concrete Sidewalk with Integral Curb In Kind per Detail D-11 in Area P-2 & as Shown on the PlansSF435$ - 0
33.0Remove & Replace Concrete Sidewalk Ramp in Area P-2 & as Shown on the Plans per Detail D-10SF250$ - 0
34.0Provide Additional 6" Concrete Sidwalk Flares at Areas P-3 & P-4SF100$ - 0
35.0Remove Concrete Sidewalk with Integral Curb & Replace with Sidewalk Ramp in Area P-2SF175$ - 0
36.0Restoration of Existing Concrete Light Pole Base at Area P-2 per Detail D-16EA4$ - 0
37.0Remove Existing Signage, Furnish & Install 6" Bollards, Sleeve, Post & Dual ADA Signage Assembly at Area P-2 per Detail D-12EA2$ - 0
38.0Remove Existing Signage, Furnish & Install 6" Bollards, Sleeve, Post & ADA Signage Assembly at Area P-2 per Detail D-12EA2$ - 0
39.0Remove Existing Signage, Furnish & Install 6" Bollards, Sleeve, Post & Dual Visitor Parking Signage Assembly at Area P-2 per Detail D-12EA1$ - 0
40.0Furnish & Install ADA Post & Signage per Detail D-13 at Area P-3EA1$ - 0
41.0Remove & Replace Existing Signage "In Kind" Campus WideEA2$ - 0
42.0Furnish & Install Limestone Rip Rap (1" x 3") at Area P-4SF150$ - 0
43.0Remove & Legally Dispose of Existing Gooseneck Playground Basketball Hoop, Backboard, and Pole Assembly at Area P-4EA2$ - 0
44.0Furnish & Install New Heavy Duty Gooseneck Playground Basketball Hoop, Backboard, and Pole Assembly at Area P-4EA4$ - 0
45.0Restoration Campus Wide of Areas Effected by ConstructionLS1$ - 0
46.0Paint Striping Campus Wide Per Proposed Striping PlanLS1$ - 0
47.0Recycled Asphalt Pavement “RAP” CreditTON1,740$ - 0
BASE BID TOTAL:$ 30,000.00
ALTERNATE BID 1: P-1, & P-2 Cement Stabilization
8.1Excavate/ Remove 10" of Existing Subbase Material at Area P-1SF-5,250$ - 0
9.1Excavate/ Remove 8" of Existing Subbase Material at Area P-2SF-44,645$ - 0
13.1Furnish & Install Stablization Fabric at Area P-1, P-2SY-5,540$ - 0
14.1Provide 8" of MI-DOT 21AA Dense Graded Limestone Aggregate Base C.I.P at Area P-2SF44,645$ - 0
15.1Provide 10" of MI-DOT 21AA Dense Graded Limestone Aggregate Base C.I.P at Area P-1SF-5,250$ - 0
48.0Provide Cement Stablization in Areas P-1 & P-2SF49,895$ - 0
ALTERNATE BID 1 TOTAL:$ - 0
ALTERNATE BID 2: P-4.1
49.0Furnish & Place Hot Applied Rubberized Asphalt Pavement Selant at Area P-4.1LF800$ - 0
50.0Furnish & Apply Asphalt Seal Coat at Area P-4.1SF6,000$ - 0
51.0Perform Asphalt Full Depth Repairs at Area P-4.1SF300$ - 0
ALTERNATE BID 2 TOTAL:$ - 0
ALTERNATE BID 3: P-5
52.0Milling 4” +/- Full Depth to Remove All Existing Pavement at Area P-5SF7,225$ - 0
53.0Excavate/ Remove 8" of Existing Subbase Material at Area P-5SF7,225$ - 0
54.0Provide 8" of Graded Limestone Aggregate Base C.I.P at Area P-5SF7,225$ - 0
56.0Furnish & Intall Stablization Fabric at Area P-5SY805$ - 0
57.0Finish Grade & Compact to Ensure Positive Drainage & Density at Area P-5SF7,225$ - 0
58.0Provide 2.5" HMA MI-DOT 3C (PG 64-22) Base Course at Area P-5SF7,225$ - 0
59.0Provide 1.5" HMA MI-DOT 4C (PG 64-22) Surface Course at Area P-5SF7,225$ - 0
60.0Recycled Asphalt Pavement “RAP” CreditTON250$ - 0
ALTERNATE BID 3 TOTAL:$ - 0
GRAND TOTAL (BASE + ALTERNATES):$ 30,000.00