This is a price form for an Invitation for Bids (IFB) issued by the State of Maryland Department of Public Safety and Correctional Services for the removal and replacement of a damaged Sallyport Vehicle Gate at Maryland Correctional Institution - Hagerstown (MCI-H). The project requires bidders to provide comprehensive pricing for materials and labor associated with installing a new Tymetal PLUSS Vehicle Gate System and related security infrastructure. The scope of work includes ten line items encompassing the slide gate system with overhead beam and locking column, access control station, concrete grade beam replacement, galvanized steel posts and mesh, razor tape installation, swing gate and fence components, rails, and all associated field welding, gate removal and installation labor, and electrical installation labor. Bidders must complete the form with unit prices and total costs for all direct and indirect expenses including overhead, administrative costs, and profit, with all pricing to be consolidated into a Not-to-Exceed Firm Fixed Price for the entire project.
The price form requires bidders to submit complete pricing information in the specified format without amendments, alterations, or blank items, with failure to comply potentially resulting in the bid being deemed non-responsive. All ten line items on the form are currently listed at $0.00, indicating this is a blank template awaiting bidder submissions. The form requires submission of bidder information including company name, address, telephone, email, service location, FEIN, eMMA number, and SDAT registration status. An authorized signature and printed name and title of the submitting official are required for bid validity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BPM057973 Price Form
| State of Maryland |
| Department of Public Safety and Correctional Services |
| Sallyport Security Gate Repairs at the Marland Correctional Institution - Hagerstown |
| Instructions: The Bid Form shall contain all price information in the format specified on these pages. Complete the Bid Form only as provided in the Bid Instructions. Do not amend, alter or leave blank any items on the Bid Form. Failure to adhere to any of these instructions may result in the Bid being determined not responsive. |
Unit Prices on the Bid Form must include all direct and indirect costs to perform the services identified in the IFB. Examples of direct and indirect costs include, but are not limited to, overhead, administrative expenses, and profit. The Not-to-Exceed (NTE) Firm Fixed Price for this contract shall be based upon the calcualted total price for all items and services associated with the Sallyport Security Gate Repairs at the Marland Correctional Institution - Hagerstown as listed below and in accordance with the Scope of Work.
| BPM057973 - Appendix - 2 - Price Form | ||||||
| Item No. | Item | Description | Item Total Price | |||
| 1 | Slide Gate | Tymetal PLUSS Vehicle Gate System- Includes CB overhead beam, W4 locking column, chain tube; PLUSS VSC Operator, 2-3/8" PLUSS Gate frame, hardware kit, galvanized finish | $0.00 | |||
| 2 | Access Control | Interior 3 button station with wiring into Guard Tower Slide gate footer- 3,000 PSI concrete grade beam full depth replacement Slide gate posts- 4" OD SS40 galvanized pipe | $0.00 | |||
| 3 | Galvanized Mesh | Mesh above slide gate- 2"x9gax36" galvanized | $0.00 | |||
| 4 | Razor Tape | Razor tape above slide gate and on fence- 30" single coil super maze stainless steel | $0.00 | |||
| 5 | Swing Gate | Swing gate - Chain link pedestrian swing gate galvanized finish, match existing opening size Fence posts- 3" OD SS40 galvanized pipe | $0.00 | |||
| 6 | Fence Mesh | Mesh on fence- 2"x 9gax120" galvanized overlapping fabric Ties- preformed steel 9ga galvanized | $0.00 | |||
| 7 | Rails | Rails- 1-5/8" OD SS40 galvanized Coil wire- 7ga galvanized | $0.00 | |||
| 8 | Field Welding Labor | Total labor cost for all field welding Labor Cost as required onsite | $0.00 | |||
| 9 | Gate Removal and | |||||
| Gate Installation Labor | Total Gate Removal and Gate Installation labor Cost | $0.00 | ||||
| 10 | Electrician Labor | Electrical Installation and Integration total labor Cost | $0.00 | |||
| Total Bid Price: | $0.00 | |||||
| Submitted By: | ||||||
| Authorized Signature: | ||||||
| Printed Name and Title: | ||||||
| Bidder Contact Information: | ||||||
| Bidder Name: | ||||||
| Bidder Address: | ||||||
| Telephone: | ||||||
| Email: | ||||||
| Location(s) from which services will be performed (City/State): | ||||||
| FEIN: | ||||||
| eMMA #: | ||||||
| SDAT #: | SDAT Status Current Y/N: |