BPM005004.M22-0048_Solicitation_SOW__Plans__Specifications_Gutters__Heat_Tape_and_Roof_Edge_Repair_Bldg_241.pdf

PDF 141 KB Posted

Attached to
DEMA - Gutters, Heat Tape and Roof Edge Repair Bldg 241 (M22-0048) Single
Solicitation number
BPM005004
Issued by
Gila County, Bellemont CDP, Arizona

About this file

This Scope of Work document, issued by the State of Arizona Department of Emergency and Military Affairs (DEMA), solicitation M22-0048, outlines a repair project for Building 241 located at Camp Navajo Military Reservation in Bellemont, Arizona. The project scope includes installation of new seamless gutters above three roll-up doors with one existing gutter extension, installation of three new downspouts and repair of one existing downspout, installation of heat tape in four locations with individual controllers, roof edge repair with new metal drip edge and modified SBS granulated cap sheet, replacement of 2X4 wood nailers, and tie-in to nearby power for the heat tape system. The contractor is also responsible for site cleanup and debris removal. The solicitation was posted on November 4, 2022, with a proposal due date of January 19, 2023, providing approximately 2.5 months for bid preparation. All questions regarding the solicitation, scope of work, and specifications must be submitted in writing through the Discussion Forum tab in the procurement system, with direct communication to procurement officers or project managers prohibited.

The solicitation requires contractors to complete an items grid with pricing information embedded directly into the bid submission rather than as a separate pricing proposal. Mandatory bid documents include the Offer and Acceptance form, Trade Secrets and Proprietary Information documentation, Subcontractors and Materials Supply List (Attachment A), and Certificate of Corporate Authority (Attachment B). The contract includes a warranty provision guaranteeing roofing workmanship against leaks for two years from completion; the warranty period for heat tape and electrical work was not specified in the scope. No specific budget range or contract award value was disclosed in the documentation. The solicitation requires contractors to address participation in boycotts of Israel, which may impact vendor eligibility. No specific set-aside designations or incumbent contractor information was provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BPM005004/M22-0048

Scope of Work State of Arizona

Department of Emergency and Military Affairs Facilities Management Office

PROJECT

Gutters, Heat Tape and Roof Edge Repair Bldg 241.

LOCATION

Camp Navajo Military Reservation, 1 Hughes Avenue, GSA Bldg 241, Bellemont, Arizona, 86015

BPM005004/M22-0048

GENERAL REQUIREMENTS:

1. PROJECT DESCRIPTION:

Request a contractor to provide a firm fixed price to Install Perimeter edge repair and gutter installation with heat tape to building 241. The Project is located at Camp Navajo Military Reservation, 1 Hughes Avenue, GSA Bldg 241, Bellemont, Arizona, 86015

2. SUMMARY OF WORK:

2.1 Contractor shall sweep/ spud gravel covering back along the edge above new roll-up doors where new gutters are installed. (Appx.70’)

2.2 Contractor shall Cut back the existing membrane at existing drip edge and remove, install new metal drip edge incorporate into repair.

2.3 Contractor shall Replace the 2X4 wood nailers at areas where new gutters are to be installed.

2.4 Contractor shall fully adhere a new modified SBS granulated cap sheet to strip in at the new drop edge, use asphalt primer as required. Sweep loose gravel back into place.

2.5 Contractor shall install new seamless gutters above 3 roll-up doors, extend 1 existing gutter.

2.6 Contractor shall install 3 new downspouts, re-use 1 (one) existing downspout (repair existing elbow).

2.7 Contractor shall install heat tape in four locations including downspouts to ground. Each gutter to be controlled by heat tape controller.

2.8 Contractor shall tie-into nearby power.

2.9 Contractor shall properly clean up, removed from premises, and disposed of all related debris.

3. WARRANTY/GUARANTEE:

3.1 All roofing workmanship warranted against leaking for a period of 2 years from completion.

3.2 Heat tape and electrical by _____________________.

END OF SCOPE OF WORK