Boyd Lake Furnace Replacement_Pre-Bid Agenda & Sign In_2026-09-24.pdf
PDF 415 KB Posted
- Solicitation number
- DQ1 PMAA 2027000103 2
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Pre-Bid Conference Agenda document for Colorado Parks & Wildlife's Northeast Region outlining procedures and requirements for the Boyd Lake State Park Furnace Replacement project (S26PNE-7531). The project entails replacing five furnaces across four bathroom facilities: two furnaces in the AB Bathroom, one each in the CD Bathroom, EF Bathroom, and Marina Bathroom. Prior to equipment procurement and furnace removal, the contractor must perform building heat load calculations and equipment sizing verifications, followed by testing and balancing after installation. The pre-bid conference was held on September 24, 2026, with a question deadline of 10:00 AM on September 29, 2026. Bids are due by 10:00 AM on October 6, 2026, via email to Project Manager Dmitry Tepo, by fax, or hand delivery to the Northeast Regional Office. The contractor will have 30 calendar days to complete the project following issuance of the Notice to Proceed, with specific operational constraints: all bathrooms must remain open to the public until October 31, 2026, with only one bathroom closable at a time for a maximum of four consecutive days (Monday through Thursday); beginning November 1, 2026, the EF Bathroom closes entirely for construction, while the AB, CD, and Marina bathrooms remain subject to the same single-closure restrictions.
Bidders must submit their proposal with a signed bid schedule acknowledging any addenda, a Contractor's Qualifications and References Statement, a completed W-9 form (failure to submit may delay award), and SDVOSB certification through the U.S. Department of Veterans Affairs if applicable. All addenda and project amendments will be posted to the Colorado State Vendor Self Serve (VSS) website at www.colorado.gov/VSS, and it is the bidder's responsibility to check for and acknowledge any addenda in their bid submission. Bid tabulation results will be sent to bidders and posted to VSS following the bid opening, with the lowest responsible bidder to be contacted for award. Upon award, Purchase Orders typically require one to two weeks to process once all required documentation is received, followed by a pre-construction meeting and issuance of the Notice to Proceed. All questions regarding the project should be directed via email to Dmitry Tepo at dmitry.tepo@state.co.us or by phone at (720) 765-2568.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Boyd Lake Furnace Replacement Bid Documents 2026-09-15.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Conference Agenda Page 1 of 2 S26PNE-7531
Pre-Bid Conference Agenda
Boyd Lake State Park - Furnace Replacement
September 24, 2026
DQ1: 2027*242
Colorado Parks & Wildlife Northeast Region Dmitry Tepo – Project Manager Cell Phone: (720) 765-2568 E-mail: dmitry.tepo@state.co.us
1. General:
a. All questions shall be sent via email to Dmitry Tepo, Project Manager.
b. Any Addendum will be posted on the State VSS website www.colorado.gov/VSS
c. If issued, all addenda must be acknowledged on the bid proposal. It is the bidder’s responsibility to check for addenda. Failure to acknowledge may result in rejection of bid.
d. Amendments are part of the VSS posting system. Anything posted to VSS including Pre- Bid sign-in sheet, addenda, and Q&A will have an accompanying amendment. These do not need to be acknowledged. However, additional amendments may have addendum associated with them that will require acknowledgement.
e. Pre-bid attendance list, agenda, and Q&A will also be posted on the State Vendor Self Serve website (www.colorado.gov/VSS).
2. Proposed Project Timing:
a. Question Deadline - 10:00 AM on September 29, 2026. Questions sent after the deadline will not be addressed. A Q&A document will be posted to the State VSS website with answers to submitted questions.
b. Bids Due – Bids will be received via email to Dmitry Tepo (preferred), fax, or hand delivered to the Northeast Regional Office at 6060 Broadway Denver, CO 80216 by 10:00 AM on October 6, 2026.
c. Inclusions – Please include with your bid the following:
• Bid Schedule – signed and acknowledging addenda (if any)
• Contractor’s Qualifications and References Statement
• W9 – failure to submit may result in delay of award
• SDVOSB certification through the U.S. Department of Veterans Affairs (if applicable)
d. Bid Tabulation - will be sent to bidders and posted to VSS as quickly as possible following the bid opening. The lowest responsible bidder will be contacted.
mailto:dmitry.tepo@state.co.us http://www.colorado.gov/VSS http://www.colorado.gov/VSS
Pre-Bid Conference Agenda Boyd Lake State Park - Furnace Replacement
Pre-Bid Conference Agenda Page 2 of 2 S26PNE-7531
e. Notice to Proceed – Purchase Orders can take 1-2 weeks to process once all required documents (insurance certificate, W-9, etc.) are received from the awarded contractor.
A pre-construction meeting will be scheduled promptly after the Purchase Order is issued. The Notice to Proceed will be given after the pre-construction meeting.
f. Project Schedule – the contractor shall have 30 calendar days to complete the project, once the Notice to Proceed is given, unless otherwise provided for in the General Conditions for Capital Construction.
• All bathrooms are open to the public unit October 31, 2026. One bathroom at a time can be closed for a maximum of 4 days, Monday through Thursday. The contractor must complete site work requiring building closure, during the 4-day window. All bathrooms must be operational on October 31, 2026, due to an event at the Park.
• Starting November 1, 2026, the EF Bathroom is closed to the public and work there can take place Monday through Friday. For AB and CD Bathrooms, only one can be closed at a time, for a maximum of 4 days, Monday through Thursday.
The Marina Bathroom can be closed for a maximum of 4 days, Monday through Thursday. The contractor must complete site work requiring building closure, during the 4-day window.
3. Project Information:
a. The project includes replacing two furnaces in the AB Bathroom, one in the CD Bathroom, one in the EF Bathroom, and one in the Marina Bathroom.
b. The Contractor must perform building heat load calculations and equipment sizing verifications prior to ordering replacement equipment and removing existing furnaces.
c. The contractor must perform testing and balancing after new furnace installation.
d. Carefully review all project specifications, bid items, descriptions, terms and conditions prior to submitting your bids.
Questions?
| Boyd Lake Furnace Replacement_Pre-Bid Meeting Agenda_2026-09-24 |
| Boyd Lake Furnace Replacement_Pre-Bid Sign In_2026-09-24 |