BOR Contract Forms.pdf
PDF 987 KB Posted
- Attached to
- Russell Hall Chiller and Boiler replacement 2026
- Solicitation number
- PE-57600-RFQ-2026-000000013
- Issued by
- Johnson County, Georgia
About this file
This is a Board of Regents of the University System of Georgia contract forms document containing standardized templates for construction projects undertaken by or on behalf of the University System of Georgia and its institutions. The document provides comprehensive form templates required for construction contracts, including Performance Bonds, Payment Bonds, Georgia Security and Immigration Compliance Act Affidavits, Non-Influence Affidavits, Statutory Affidavits, Five-Year Bonds on Roofs and Walls, Certificates of Manufacturer, Certificates of Insurance, Bonds to Discharge Claims, Change Order Forms, Applications for Payment, and Final Certifications of Costs. These forms are designed to be completed with project-specific information including project numbers, descriptions, institution names, cities, states, contractor and surety details, bond amounts, and contract dates. The related contract opportunity involves Gordon State College seeking qualified contractors for the Chiller and Boiler replacement at Russell Hall on the GSC campus, with a mandatory pre-bid meeting scheduled for Wednesday, April 1, 2026, at 10:00 a.m. in the Facilities conference room at 419 College Drive, Barnessville, Georgia. All contractors interested in submitting bids must have a representative present at this meeting, with the conference room located in building number 5 on the campus map.
The forms establish detailed requirements for performance and payment bonding, contractor and subcontractor compliance with federal work authorization programs (E-Verify), non-influence certifications, and comprehensive documentation of project costs and completion. Performance and payment bonds must be executed by contractors and sureties, with the surety agreeing to remedy defaults and perform contract obligations within twenty-five days of receiving notice of default. Payment bonds protect all claimants including subcontractors and materialmen, with a ninety-day claims period following the last labor or material supplied. Change orders are documented through detailed formats with cost breakdowns verified by contract compliance specialists and design professionals, while applications for payment require certification from contractors, contract compliance specialists, and design professionals. The forms mandate compliance with Georgia statutes including O.C.G.A. 13-10-1 through 13-10-91 and require proper notarization and execution by authorized representatives. Final certifications of costs must segregate expenses into Building and Building Improvements, Infrastructure, and Furnishings and Equipment for capital asset accounting purposes under GASB 34 standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Russell Hall Chiller Boiler Replac_Invitation.pdf | ||
| Russell Hall Chiller Boiler Replace_Project M.pdf | ||
| Campus Map_Facilities.jpg | JPG image | |
| Russell_CHR_BLR_100_CD_NBP.pdf | ||
| Notice of Intent to Award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forms 1
SECTION 7 – FORMS
FORMS INDEX:
Performance Bond Payment Bond Georgia Security and Immigration Compliance Act Affidavit(s) Non-Influence Affidavit Statutory Affidavit Five Year Bond on Roofs and Walls Specimen Certificate of Manufacturer Certificate of Insurance Bond to Discharge Claim Change Order Forms Application for Payment Form Subcontractor Retainage Release Certificate Final Certification of Costs
Forms 2
PERFORMANCE BOND
Bond No.
Project No. Project Number
KNOW ALL MEN BY THESE PRESENTS:
That ___________________________________________________________ as principal (hereinafter referred to (Legal Name and Address of the Contractor) as "Contractor"), and ________________________________________________ as surety (hereinafter referred to
(Legal Title and Address of Surety) as "Surety"), are held and firmly bound unto the Board of Regents of the University System of Georgia as Obligee (hereinafter referred to as "Owner") in the amount of and No/100 Dollars ($ .00), to which payment Contractor and Surety bind Themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the above bounden Principal has entered into a contract with the Owner bearing date of Month, Day, Year for: Project Number and Description, Institution Name, City, State in accordance with drawings and specifications prepared by: LEGAL DP Firm Name which said contract is incorporated herein by reference and made a part hereof, and is hereinafter referred to as the Contract.
NOW THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if the Contractor shall promptly and faithfully perform and comply with the terms and conditions of said contract; and shall indemnify and save harmless the Owner against and from all cost, expenses, damages, injury or loss to which said Owner may be subjected by reason of any wrongdoing, including patent infringement, misconduct, want of care or skill, default or failure of performance on the part of said Principal, his agents, subcontractors or employees, in the execution or performance of said contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect.
(1) The said Surety to this bond, for value received, hereby stipulates and agrees that no change or changes, extension of time or extensions of time, alteration or alterations or addition or additions to the terms of the contract, or to the work to be performed thereunder, or the specifications or drawings accompanying same, or the exercise of the Owner’s right to do work pursuant to Articles 1.3.7, 1.7.8, or 5.3.5, or Paragraphs 3.4.1.4 or 5.3.2.3, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change or changes, extension of time or extensions of time, alteration or alterations or addition or additions to the terms of the contract or to the Work or to the specifications or drawings. In addition, the Surety to this bond, for value received, hereby agrees to the provisions of Article 1.5.1, including Paragraph 1.5.1.3 for increases in the penal amount of this bond, and waives notice from the Owner of any such changes.
(2) If pursuant to the Contract Documents the Contractor shall be declared in default by the Owner under the aforesaid Contract and the Owner has terminated the Contractor’s right to complete the Contract, the Surety shall promptly perform this bond agreement in accordance with its terms and conditions. If Surety chooses to investigate, Owner shall cooperate with the Surety in its investigation and shall make all public project records available for inspection by Surety at no cost to Owner. It shall be the duty of the Surety to give an unequivocal notice in writing to the Owner, within twenty-five (25) days after receipt of such a declaration of default, of the Surety's election to either remedy the default or defaults promptly or to perform the Contract promptly, time being of the essence. In said notice of election, the Surety shall indicate the date on which the remedy or performance will commence, and it shall then be the duty of the Surety to give prompt notice in writing to the Owner immediately upon completion of (a) the remedy and/or correction of each default, (b) the remedy and/or correction or each item of condemned work, (c) the furnishing of each omitted item of work, and (d) the performance of the contract. The Surety shall not assert its Principal as justification for its failure to give notice of election or for its failure to promptly remedy the default or defaults or perform the Contract.
(3) It is expressly agreed by the Principal and the Surety that the Owner, if he desires to do so, is at liberty to make inquiries at any time of subcontractors, laborers, materialmen, or other parties concerning the status of payments for labor, materials, or services furnished in the prosecution of the work.
(4) No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the legal successors of the Owner.
Forms 3
(5) For the purposes of this bond, the name and address of the responsible official of the Surety’s claims department, to whom correspondence and telecommunications may be addressed and/or with whom business concerning this bond may be conducted will be as follows:
NAME
TITLE __________________________________________________________________
ADDRESS
CITY STATE ZIP CODE
TELEPHONE
(6) Further, this bond shall be the Performance Bond furnished under O.C.G.A. §§ 13-10-2, 13-10-20 and shall be subject to increase in the penal amount of the bond pursuant to such statutes and Article 1.5.1 of the Contract.
(7) No action can be instituted on this bond after one year from the date of Final Completion as determined pursuant to Article 6.2.2.
SIGNED AND SEALED THIS ___________ DAY OF __________________________, 20_____.
ATTEST: (NAME OF Contractor)
By Secretary(*) President
(SURETY) (*)(*)
(TITLE)
(*) Please apply seal of Corporation over Secretary’s Signature.
(*)(*) Please apply seal of Surety and arrange for countersignature by a “Georgia Licensed Agent” of Surety pursuant to O.C.G.A. §33-23-5. Kindly show title of the aforesaid agent as “Georgia Licensed Agent.”
(*) Attach Power of Attorney
Forms 4
PAYMENT BOND
Bond No.
Project No. Project Number
That____________________________________________________________ as Principal (hereinafter referred to as the (Legal Title and Address of the Contractor)
"Principal") and ____________________________________________________________ as Surety (hereinafter referred ( Legal Name and Address of the Surety) to as "Surety"), are held and firmly bound unto the BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA as Obligee (hereinafter referred to as "Owner") for the use and benefit of claimants defined, hereinafter in the amount of Dollars ($ )to which payment Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns jointly and severally, firmly by these presents.
WHEREAS, the above bounden Principal has entered into a contract with Owner dated Month, Day, Yearfor Project Number and Description, Institution Name, City, State in accordance with the drawings and specifications prepared by: LEGAL DP Firm Name which contract is incorporated herein by reference and made a part hereof, and is hereinafter referred to as the Contract.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if the Principal shall promptly make payment to all claimants as hereinafter defined, for all labor and materials supplied in the prosecution of the work provided for in said Contract, then this obligation shall be void, otherwise it shall remain in full force and effect subject, however, to the following conditions:
(1) The said Surety to this bond, for value received, hereby stipulates and agrees that no change or changes, extension of time or extensions of time, alteration or alterations or addition or additions to the terms of the contract or to the work to be performed thereunder, or the specifications or drawings accompanying same, or the exercise of the Owner’s right to do work pursuant to Articles 1.3.7,1.7.8 or 5.3.5 or Paragraphs 3.4.1.4 or 5.3.2.3, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change or changes, extension of time or extensions of time, alteration or alterations or addition or additions to the terms of the contract or to the Work or to the specifications or drawings. In addition, the Surety to this bond, for value received, hereby agrees to the provisions of Article 1.5.1, including Paragraph 1.5.1.3, for increases in the penal amount of this bond and waives notice from the Owner of any such changes.
(2) A claimant is defined as any subcontractor and any person supplying labor, materials, machinery, or equipment in the prosecution of the work provided for in said contract.
(3) Every person entitled to the protection hereunder and who has not been paid in full for labor or materials furnished in the prosecution of the work referred to in said bond before the expiration of a period of ninety (90) days after the day on which the last of the labor was done or performed by him, or materials or equipment or machinery was furnished or supplied by him for which claim is made, shall have the right to sue on such payment bond for the amount, or the balance thereof, unpaid at the time of the commencement of such action and to prosecute such action to final execution and judgment for the sum or sums due him, provided, however, that any person having direct contractual relationship with a subcontractor, but no contractual relationship express or implied with the Contractor furnishing said payment bond shall have (a) given written notice to said Contractor within ninety (90) days from the day on which such person did or performed the last of the labor, or furnished the last of the materials or machinery or equipment for which such claim is made stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished or supplied or for whom the labor was performed or done; and (b) if the Contractor has filed a Notice of Commencement in accordance with the requirements of O.C.G.A. §13-10-62 and Articles 4.3.2 of the contract, given to said contractor a written Notice to Contractor within 30 days from the filing of the Notice of Commencement or 30 days following the first delivery of labor, materials, machinery or equipment, whichever is later, setting forth:
A) The name, address, and telephone number of the person providing labor, material, machinery, or equipment;
B) The name and address of each person at whose instance the labor, material, machinery or equipment is being furnished;
C) The name and the location of the public work; and
D) A description of the labor, material, machinery, or equipment being provided and, if known, the contract price or anticipated value of the labor, material, machinery, or equipment to be provided or the amount claimed to be due, if any.
It is provided further that nothing contained herein shall limit the right of action to said 90-day period. Notice may be served by the depositing of a notice, certified mail, postage paid, duly addressed to the Contractor at any place he maintains an office or conducts his business, or his residence, in any post office or branch post office or any letter box under the control of the Post Office Department or notice may be served by statutory mail pursuant to O.C.G.A. §9-10-12 or in any manner in which the sheriffs of Georgia are authorized by law to serve summons or process. Every suit instituted under this section shall be brought in the name of the claimant without Owner being made a party thereof. The official who has custody of said bond is authorized and directed to furnish, to any person making application thereof who submits an affidavit that he has supplied labor or materials for such work and payment therefore has not been made, or that he is being sued on any such bond, a copy of such bond and the contract for which it was given, certified, by the official who has custody of said bond and contract shall be admitted in evidence without further proof. Applicants shall pay for such certified statements and such fees as the official fixes to cover the cost of preparation thereof, but in no case shall the fixed fee exceed the fees that the clerks of the superior courts are permitted to charge for similar copies.
Forms 5
(4) It is expressly agreed by the Principal and the Surety that the Owner, if he desires to do so, is at liberty to make inquiries at any time of subcontractors, laborers, materialmen, or other parties concerning the status of payments for labor, materials, or services furnished in the prosecution of the work.
(5) For the purposes of this bond, the name and address of the responsible official of the Surety’s claims department, to whom correspondence and telecommunications may be addressed and/or with whom business concerning this bond may be conducted will be as follows:
TITLE __________________________________________________________________
ADDRESS
CITY STATE ZIP CODE
TELEPHONE
(6) Further, this bond shall be the Payment Bond furnished under O.C.G.A. §§ 13-10-1, 13-10-60 et seq. and shall be subject to increase in the penal amount of the bond pursuant to such statutes and Article 1.5.1 of the Contract.
(7) No action can be instituted on this bond after one year from the date of Final Completion as determined pursuant to Article 6.2.2.
SIGNED AND SEALED THIS ___________ DAY OF __________________________, 20_____.
ATTEST: (NAME OF Contractor)
By Secretary(*) President
(SURETY) (*)(*)
(TITLE)
(*) Please apply seal of Corporation over Secretary’s Signature.
(*)(*) Please apply seal of Surety and arrange for countersignature by a “Georgia Licensed Agent” of Surety pursuant to O.C.G.A.
§33-23-5. Kindly show title of the aforesaid agent as “Georgia Licensed Agent.”
Forms 6
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT(S)
“Contractor” in the following Affidavits shall mean “General Contractor”/”Contractor” for the purpose of compliance with O.C.G.A. § 13-10-91, (b).
For the purpose of completing the attached Affidavits, please insert the following:
• “Name of Public Employer” shall mean “Board of Regents of the University System of Georgia, Owner, for the use and benefit of Institution Name, Using Agency”
• “Name of Project” shall mean “Project No. Project Number and Description”
Forms 7
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1)
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of Board of Regents of the University System of Georgia for the use and benefit of Institution Name, Using Agency (public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
Project Number and Description Name of Project
Board of Regents of the University System of Georgia For the use and benefit of Institution Name Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 20__ in _____(city), ______(state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,20__.
NOTARY PUBLIC
My Commission Expires:
Forms 8
Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (name of contractor) on behalf of Board of Regents of the University System of Georgia for the use and benefit of Institution Name, Using Agency (public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor. Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Subcontractor
Project Number and Description Name of Project
Board of Regents of the University System of Georgia For the use and benefit of Institution Name Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 20__ in _____(city), ______(state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,20__.
NOTARY PUBLIC
Forms 9
Sub-subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(4)
By executing this affidavit, the undersigned sub-subcontractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract for (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract) and (name of contractor) on behalf of Board of Regents of the University System of Georgia for the use and benefit of Institution Name, Using Agency (public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned sub-subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub-subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the sub-subcontractor with the information required by O.C.G.A. § 13-10-91(b). The undersigned sub-subcontractor shall submit, at the time of such contract, this affidavit to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract). Additionally, the undersigned sub-subcontractor will forward notice of the receipt of any affidavit from a sub-subcontractor to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract). Sub-subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Sub-subcontractor
Project Number and Description Name of Project
Board of Regents of the University System of Georgia For the use and benefit of Institution Name Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 20__ in _____(city), ______(state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,20__.
NOTARY PUBLIC
Forms 10
NON-INFLUENCE AFFIDAVIT
COUNTY OF ________________________________
STATE OF ________________________________
I do solemnly swear on my oath that as to the Contract dated_________________________, 20_____________, between _______________________________________________________________________________
(NAME OF CONTRACTOR)
and the Owner, I have no knowledge of the exertion of any influence or the attempted exertion of any influence on the firm on behalf of which this affidavit is made in any way, manner, or form in the purchase of materials, equipment, or other items involved in construction, manufacture, or employment of labor under the aforesaid Contract by any employee, officer, or agent of the Owner, or any person connected with the State Government of Georgia in any way whatsoever.
This ________ day of __________________________, 20_______.
______________________________________________(L.S.)
Signature
Title
Firm
COUNTY OF __________________________________
STATE OF ____________________________________
Personally before me, the undersigned authority, appeared____________________________________________
(NAME OF PERSON SIGNING THE AFFIDAVIT)
who is known to me to be an official of the firm of ___________________________________________________, (NAME OF CONTRACTOR) and who, after being duly sworn, stated on his oath that he had read the above statement and that the same is true and correct.
Notary Public
My Commission expires _____________________________
This______ day of __________________________, 20____.
Forms 11
STATUTORY AFFIDAVIT
COUNTY OF ______________________________ STATE OF ______________________________
FROM: ___________________________________
Contractor
TO: _____________________________________
Owner Re: Contract entered into the _____ day of ______________, 20____, between the above-mentioned parties for the construction of Project No. ______________________ located at ______________________________
1. The undersigned hereby certifies that all work required under the above Contract has been performed in accordance with the terms thereof, that all Subcontractors, Suppliers, Trade Contractors, mechanics, and laborers have been paid and satisfied in full, or will be paid and satisfied in full out of the proceeds of this payment as set forth in O.C.G.A. §13-10-80, and that there are no outstanding claims of any character [including disputed claims or any claims to which the Contractor has or will assert any defense] arising out of the performance of the Contract which have not been paid and satisfied in full except as listed herein below:
2. The undersigned further certifies that to the best of his knowledge and belief there are no unsatisfied claims for damages resulting from injury or death to any employees, Subcontractors, or the public at large arising out of the performance of the contract, or any suits or claims for any other damage of any kind, nature, or description which might constitute a lien upon the property of the
Owner.
3. The undersigned makes this affidavit for the purpose of receiving final payment in full settlement of all claims against the
Owner arising under or by virtue of the contract, and acceptance of such payment is acknowledged as a release of the Owner from any and all claims arising under or by virtue of the contract.
This ______ day of ____________________________, 20___________.
___________________________________(L.S.)
Signature Title Firm
COUNTY OF _______________________________ STATE OF ________________________________
Personally before me, the undersigned authority, appeared____________________________________________
(NAME OF PERSON SIGNING THE AFFIDAVIT)
who is known to me to be an official of the firm of ___________________________________________________, (NAME OF CONTRACTOR) and who, after being duly sworn, stated on his oath that he had read the above statement and that the same is true and correct.
Notary Public
My Commission expires __________________________
This______ day of __________________________, 20____.
Instructions to Contractor- ENTER THE WORD "NONE" OR LIST THE NAMES OF CLAIMANTS
Forms 12
FIVE YEAR BOND ON ROOFS AND WALLS
STATE OF GEORGIA
COUNTY OF ______________________________
Firmly Bound. Know all men by these presents, that we, ________________ (“Contractor”) as Principal, and (Name of Surety), as Surety, are held and firmly bound unto
(Insert Name of Owner) Owner, in the sum of____________ Dollars ($______________) for the payment of which well and truly to be made and done, we bind ourselves, our executors and administrators, our successors and assigns, jointly and severally, by these presents.
Condition of Obligation. The condition of the above obligation is such that WHEREAS Contractor has entered into a Contract with Owner dated_________________ (enter date of contract), for construction of Project No.________________.
Warranty. WHEREAS, the said Contractor warrants with respect to the said work that for a period of five years from the date of the execution of the final certificate of the Design Professional, the roofs of the building (or buildings) and roofs of passages, including but not limited to the roof envelope, including but not limited to the roof decking; deck sheathing; material used as a roof base or insulation over which roof is applied; roofing materials; promenade decks or any other work on the surface of the roof; flashing; base flashing; counter flashing; metal work, gravel stops; or roof expansion joints shall be absolutely watertight and free from all leaks. At no expense to the Owner, the Contractor will make repairs to any defects that may develop in the work including but not limited to: blisters, exposed felts, ridges, wrinkles, splits, warped insulation, and loose flashing, in a manner compatible to the system and acceptable under industry standards and in accordance with the construction specifications. The Contractor also warrants that for the same five-year period the walls of the building (or buildings) and building envelope, including but not limited to: vertical and/or horizontal expansion joints, below and/or above grade waterproofing, below and/or above grade damp-proofing, thru-wall flashing, damp course flashing and waterproofing of joints at openings in walls including but not limited to door perimeters, window perimeters, vents and pipe openings shall be absolutely watertight and free from all leaks, seepage or dampness, and that he shall, at no expense to the Owner, make repairs to any defects that may develop in the work in a manner compatible to the system and acceptable under industry standards and in accordance with the construction specifications, Provided, however: That the following are excluded from the warranty:
(a) Defects or failures resulting from abuse by the Owner, upon presentation of competent evidence of same by the Contractor.
(b) Defects in design that the said Contractor shall produce competent evidence of having had provided clear written notice in writing to the Owner prior to commencing installation of the Work, except, however, that the Contractor shall not be responsible, insofar as liability under this bond is concerned, for bringing to the attention of the Owner defects in design involving failure of only the following three structural elements:
(1) Structural Frame
(2) Load bearing walls
(3) Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.
(c) Damage caused by fire, tornado, hail, hurricane, acts of God, wars, riots, or civil commotion upon presentation of competent evidence of same by the Contractor..
(d) The Contractor is not an insurer nor is he a guarantor of the design. Any other provisions of this bond to the contrary notwithstanding, the Contractor shall not be required to remedy any errors or omissions of design.
Leaks or Defects. WHEREAS the said Contractor agrees that should any leaks or defects occur in the roof envelope or wall envelope of the said (Name and Number of Project) the said Contractor will promptly remedy the said leaks or defects and pay for any damage to other work of said Project resulting therefrom, except, however, that when this instrument is executed by a Trade Contractor this Contract, shall, insofar as the Trade Contractor is concerned, extend only to the work executed by said Trade Contractor.
Notice to Surety. If the Contractor shall have been given notice to remedy leaks or defects pursuant to the Contract Documents and has been declared in default by the Owner and the Owner has terminated the Contractor’s right to complete the remedy, the Surety shall be notified in writing and shall promptly perform this bond agreement in accordance with its terms and conditions. If Surety chooses to investigate, Owner shall cooperate with the Surety in its investigation and shall make all public project records available for inspection by Surety at no cost to Owner. It shall be the duty of the Surety to give an unequivocal notice in writing to the Owner, within twenty-five
(25) days after receipt of such notice, of the Surety's election to either remedy the leaks and defects promptly, time being of the essence.
In said notice of election, the Surety shall indicate the date on which the remedy or performance will commence, and it shall then be the
Forms 13 duty of the Surety to give prompt notice in writing to the Owner immediately upon completion of the remedy and/or correction of the leaks or defects. The Surety shall not assert its Principal as justification for its failure to give notice of election or for its failure to promptly remedy the leaks or defects.
Full Force and Effect. NOW, THEREFORE, the condition of this obligation is such that if the Contractor shall in all things promptly and faithfully perform and comply with the terms and conditions hereinbefore set forth, then this obligation shall be null and void; otherwise, it shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this instrument to be duly executed this ________ day of ____________, 20___.
________________________________ WITNESS
Principal
By:______________________________ _______________________
TITLE____________________________ _______________________
________________________________ WITNESS
Surety
By:______________________________ _______________________
TITLE____________________________ _______________________
Instructions for execution by Contractor
(a) If the firm is a partnership, all members of the partnership must execute.
(b) If the firm is a corporation, the president must sign, the secretary must attest, and the Seal of
Corporation must be affixed.
(c) If the firm operates as a sole proprietorship, the proprietor must execute.
Forms 14
SPECIMEN CERTIFICATE OF MANUFACTURER
INSTRUCTIONS FOR PREPARATION OF CERTIFICATE: To be acceptable, the certificate must be prepared in the form indicated by this specimen on the official letterhead of the manufacturer. No portions of the certificate may be omitted.
Attached is a copy of the Contract provision under which the certificate is required. The Authority needs only one copy of the certificate. If equipment of a manufacturer is not installed in strict compliance with the recommendations of the manufacturer or if in the design of the work the equipment is not applied in strict compliance with the recommendations of the manufacturer, a letter from the manufacturer should be forwarded to the Contractor [with copies to the Design Professional and the Owner] setting forth a list of the deviations from the recommendations of the manufacturer and stating what remains to be done in order to bring the work into strict compliance with the recommendations of the manufacturer.
Prior to calling upon the representative of the manufacturer for performance of the services necessary to enable him to execute a certificate in accordance with this specimen, it is the obligation of the Contractor to have installed the work in strict compliance with the recommendations of the manufacturer [See Article 2.2.4 of the Contract], and it is likewise the obligation of the Contractor to have put the equipment in good operating condition in absolute and final readiness for the "start-up,” "testing,” and "placing into operation" as defined herein below by the representative of the manufacturer.
Date:_______________________________
Re: Certificate of [JOHN DOE CORPORATION] that equipment or components furnished by it has [or have, as the case may be] been installed in strict compliance with its recommendations and is [or are, as the case may be] operating properly at PROJECT NO._________________
Gentlemen:
1. We certify through our duly authorized and acting agent that the following item [or items, as the case may be] furnished by us to the Project named in the caption was [or were, as the case may be] started up, tested, and placed in operation by our authorized field representative on [enter the date on which the field representative performed the start-up, test, and placing into operation] and is [or are, as the case may be] operating properly:
[List the item or items furnished to the job. Show catalogue number or numbers.]
2. We certify further that the aforesaid equipment was installed in strict compliance with our recommendations as published by us in the following document [or documents, as the case may be]:
[Insert the date, name, or other positive means of identifying the exact document or documents in which the recommendations for installation and use of the item or items are published.] (*)
3. A copy of the aforesaid document(s) is (are) attached hereto.
This __________________ day of________________, 20____
JOHN DOE CORPORATION
By:_________________________________ Authorized Representative
(*) The date must be shown [See Article 6.4.1.2.5
DEFINITIONS:
l. "Start-up" is defined as putting the equipment into action.
2. "Testing" is defined as performing such testing as is stipulated in the Contract Documents to be performed.
3. "Placing into operation" is defined as operating the equipment for a sufficient period of time for the determination to be made that it is performing properly.
Insert name and address of Owner
Forms 15
THIS FORM IS FOR OPTIONAL USE TO RELEASE TO THE CONTRACTOR FUNDS WITHHELD FROM A PAY APPLICATION IN THE EVENT A
SUBCONTRACTOR FILES A CLAIM AGAINST THE CONTRACT BALANCE HELD BY THE OWNER THAT REMAINS UNRESOLVED. THIS IS A SUBORDINATE
DOCUMENT TO THE PAYMENT BOND FOR THE PROJECT, AND IS CALCULATED AGAINST THE PENAL AMOUNT OF THAT PAYMENT BOND. THERE
ARE OTHER METHODS THAT MAY BE USED TO REMEDY SUCH SITUATIONS, HOWEVER, THIS FORM IS EFFECTIVE WHEN NONE OF THE PARTIES
ARE ABLE TO REACH AGREEMENT UPON THE CLAIM.
Forms 16
BOND TO DISCHARGE CLAIM
WHEREAS, _______________________________________________________ (hereinafter referred to as “Claimant” has filed a claim against ______________________________________________________________ (the “Contractor”, hereinafter referred to as “Principal”) on the following contract:
WHEREAS, the undersigned Principal and Surety have issued Payment Bond No. _____________________ (the “Primary Bond”) to the Owner, as Obligee, on the Contract dated ___________ for Project ______
WHEREAS, the undersigned Principal and Surety dispute the Claimant’s entitlement to all or part of the claim and expressly reserve all rights and defenses available at law in connection therewith;
WHEREAS, ___________________________________________________________ as Principal and __________________________________________________ as Surety, desire to continue to receiving payments from the Owner for work done on the above referenced project, NOW THEREFORE, in consideration of these premises, the undersigned Principal and Surety do hold themselves firmly bond unto __________________________________________________ as Claimant, in the total amount of _______________________________________ dollars ($_____________), representing double the amount of the claim.
The condition of this Bond to Discharge Claim is such that should the undersigned Principal or Surety pay to the Claimant the sum that may be found to be due to the Claimant upon the trial of any action that may be filed by said Claimant, or if Principal or Surety pay to the Claimant a sum agreeable to Claimant and Claimant accepts such payment, then this Bond shall be void; otherwise to remain in full force and effect.
The penal amount of the Primary Bond is conditionally reduced by the amount of this Bond to Discharge Claim, and upon payment of any sums to the Obligee under this Bond to Discharge Claim, the penal amount of the Primary Bond is reduced instanter by the amount of such payment.
No action can be instituted on this bond after one year from the date of Final Completion as determined pursuant to Article
6.2.2 of the Contract.
IN WITNESS WHEREOF, the said Principal and Surety have set their hands and seals this _____ day of ____________, 20___.
Principal by:_______________________________
Surety by:_______________________________ Attorney-in-Fact
Type Name Above
Forms 17
CHANGE ORDER FORMAT
(Lump Sum)
CHANGE ORDER No. _______
Project Name: ____________________________ Project Number: __________________________
Owner
1. Submission of this Change Order for consideration was authorized by letter from the Owner, dated , 20__, Incumbrance Record No. .
2. The changes hereinafter described are applicable to the Contract for the construction of the above-referenced Project and amend the Contract Documents.
3. Description of Change:
4. This Change Order is deemed necessary and originated with the (Design Professional) (Owner) (Contractor) (Using Agency). (Indicate applicable entity.)
5. This Change Order is necessary to:
6. The amount of the Change Order was determined by:
7. A memorandum is attached showing cost breakdown of labor and materials by unit and quantities as prepared by the Contractor and checked by the Contract Compliance Specialist and Program Manager (if any).
NOTE TO DESIGN PROFESSIONAL:
Please prepare each Change Order in the form and wording given below, deleting inapplicable wording and adding such explanations as may be necessary. The wording in Paragraph 11 may not be changed or altered in any way by either the Design Professional or the Contractor. Send four copies, signed by you and the Contractor, to the Owner. Do not forward a Change Order unless it is accompanied by a breakdown which has been certified by the Contract Compliance Specialist and Program Manager (if applicable).
Note to Design Professional:
Please leave the Change Order number blank. The Owner will assign a number.
Choose one:
a. Estimate and acceptance in lump sum.
b. Unit prices stated in contract or subsequently agreed upon.
c. Cost and percentage as described in general conditions.
Note to Design Professional:: No Change Order should be forwarded unless you have been furnished with a letter from the Owner authorizing same.
Note to Design Professional: Be sure to give a complete statement describing the changes in the work, including the specifications. If drawings are necessary, refer to them by date, etc., and state they are made a part of the Change Order. Copy of drawings should be attached to the Change Order.
Note to Design Professional: Give a complete description of conditions which necessitate the change.
Forms 18
8. We have verified the quantity and quality of all materials shown on the memorandum. We have verified that all prices are reasonable and do not exceed current costs for like services or materials, and we have verified that the quality of the materials meets the requirements of the Contract Documents.
9. The contractor shall be allowed additional calendar days for completion. The Material Completion and Occupancy Date is: __________________ .
10. The Contract Sum shall be (increased) (decreased) by $ _________________ on account of this change.
11. The payment and extension of time, if any, provided by this Change Order constitutes compensation in full to the Contractor and its Subcontractors, Suppliers, and Trade Contractors for all costs and markups, directly and indirectly attributable to the changes ordered herein, and for all delays or time related costs thereto and for any acceleration costs for performance of changes within the time stated and to be completed by the Material Completion and Occupancy Date and for any claims related thereto against the Owner and the Design Professional, and design consultants.
APPROVED AND AGREED BY CONTRACTOR: RECOMMENDED FOR OWNER'S ACCEPTANCE
LEGAL GC Firm Name DESIGN PROFESSIONAL: LEGAL DP Firm Name
By: By:
(Print Name/Title) (Print Name/Title)
Date approved by Contractor: Date approved by Design Professional:
APPROVED AND AGREED BY USING AGENCY: APPROVED AND AGREED BY OWNER:
INSTITUTION NAME BOARD OF REGENTS OF THE UNIVERSITY
Date approved by Using Agency: Date approved by Owner:
Note to Design Professional: Please insert the number of additional Days allowed and the new Material Completion and Occupancy Date, or, if no additional time is allowed, insert “0” for the Days and “No Change” for the date.
Note to Design Professional: Please observe that verification of quantities and prices means the Design Professional who signs the Change Order has personal knowledge that the quantities shown in the memorandum referred to under paragraph 7 above are correct, that he has personally satisfied himself that full credit has been extended for any work or materials deleted or omitted, and that he has conclusively established by such checking or inquire as may be necessary that the prices and allowances shown in the memorandum comparable with current costs for like services and materials.
Note to Design Professional: Please delete inapplicable language in parentheses and enter the dollar amount for this change. Insure that cost of the Work, percentage markup for profit, and the daily rate of general conditions costs is accurate and included in the amount of an additive change. If a deductive change, the amount is generally cost of the work only; however, consult with the owner in significant deductive
Change Orders to determine if time or profit should be included in the deducted amount.
Forms 19
CHANGE ORDER FORMAT
(Force Account or Indeterminate Units)
CHANGE ORDER No. _______
Project Name: ____________________________ Project Number: __________________________
Owner
1. Submission of this Change Order for consideration was authorized by letter from the Owner, dated , 20__, Incumbrance Record No. .
2. The changes hereinafter described are applicable to the Contract for the construction of the above-referenced Project and amend the Contract Documents..
3. Description of Change:
4. This Change Order is deemed necessary and originated with the (Design Professional) (Owner) (Contractor) (Using Agency). (Indicate applicable entity.)
5. This Change Order is necessary to:
6. The Maximum Allowable Cost of the Change Order was estimated by:
NOTE TO DESIGN PROFESSIONAL:
Please prepare each Change Order in the form and wording given below, deleting inapplicable wording and adding such explanations as may be necessary. The wording in Paragraph 8 may not be changed or altered in any way by either the Design Professional or the Contractor. The wording in Paragraph 5 of the Final Cost Amendment may not be changed or altered in any way by either the Design Professional or the Contractor. Send four copies, signed by you and the Contractor, to the Owner. Do not forward a Change Order unless it is accompanied by a breakdown which has been checked by the Contract Compliance Specialist and Program Manager (if applicable).
Note to Design Professional:
Please leave the Change Order number blank. The Owner will assign a number.
Choose one:
a. Estimate in lump sum.
b. Unit prices stated in contract or subsequently agreed upon, and an estimated number of units.
c. Cost and percentage as described in general conditions.
Note to Design Professional:: No Change Order should be forwarded unless you have been furnished with a letter from the Owner authorizing same.
Note to Design Professional: Be sure to give a complete statement describing the changes in the work, including the specifications. If drawings are necessary, refer to them by date, etc., and state they are made a part of the Change Order. Copy of drawings should be attached to the Change Order.
Note to Design Professional: Give a complete description of conditions which necessitate the change.
Forms 20
7. A memorandum is attached showing the estimated cost breakdown of labor and materials by unit and quantities as prepared by the Contractor and checked by the Contract Compliance Specialist and Program Manager (if any).
8. The Maximum Allowed Cost for this Change Order is $ __________________________, and is established as Incumbrance Record No. _______________ . This Maximum Allowed Cost may be amended by the Owner in the event the actual costs are expected to exceed the Maximum Allowed Cost, provided that Contractor shall give written notice of such fact prior to incurring actual costs in excess of ninety percent of the Maximum Allowable Cost. In no event shall actual costs be incurred in excess of the Maximum Allowed Cost, as it may be amended.
APPROVED AND AGREED BY CONTRACTOR: RECOMMENDED FOR OWNER'S ACCEPTANCE
Forms 21
FINAL COST AMENDMENT
TO
CHANGE ORDER NO. ___________
1. A memorandum is attached showing cost breakdown of labor and materials by unit and quantities as prepared by the Contractor and checked by the Contract Compliance Specialist and Program Manager (if any).
2. We have verified the quantity and quality of all materials shown on the memorandum. We have verified that all prices are reasonable and do not exceed current costs for like services or materials, and we have verified that the quality of the materials meets the requirements of the Contract Documents.
3. The contractor shall be allowed additional calendar days for completion. The Material Completion and Occupancy date is: __________________ .
4. The Contract Sum shall be (increased) (decreased) by $ _________________ on account of this change.
5. The payment and extension of time, if any, provided by this Change Order constitutes compensation in full to the Contractor and its Subcontractors, Suppliers, and Trade Contractors for all costs and markups, directly and indirectly attributable to the changes ordered herein, and for all delays or time related costs thereto and for any acceleration costs for performance of changes within the time stated and to be completed by the Material Completion and Occupancy Date and for any Claims related thereto against the Owner and the Design Professional, and design consultants.
APPROVED AND AGREED BY CONTRACTOR: RECOMMENDED FOR OWNER'S ACCEPTANCE
Note to Design Professional: Please insert the number of additional Days allowed and the new Material Completion and Occupancy Date, or, if no additional time is allowed, insert “0” for Days and “No Change” for the date.
Note to Design Professional: Please observe the fact that verification of quantities and prices means the Design Professional who signs the Change Order has personal knowledge that the quantities shown in the memorandum referred to under paragraph 7 above are correct, that he has personally satisfied himself that full credit has been extended for any work or materials deleted or omitted, and that he has conclusively established by such checking or inquire as may be necessary that the prices and allowances shown in the memorandum comparable with current costs for like services and materials.
Note to Design Professional: Please delete inapplicable language in parentheses and enter the dollar amount for this change. Insure that cost of the Work, percentage markup for profit, and the daily rate of general conditions costs is accurate and included in the amount of an additive change. If a deductive change, the amount is generally cost of the work only; however, consult with the owner in significant deductive Change Orders to determine if time or profit should be included in the deducted amount.
Forms 22
APPLICATION FOR PAYMENT
APPLICATION FOR PAYMENT NO. PROJECT NO.
CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE
To the best of my knowledge and belief, I certify that all items, units, quantities, and prices of work and material shown on this Application for Payment No. are correct; that all work has been performed and materials supplied in full accordance with the terms and conditions of the Contract Documents between
(Owner) and dated (Contractor) and all authorized changes thereto; and that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this Application and that no part of the "amount due this Application" has been received.
(a) Total amount earned for work in place (original contract) $
(b) Total amount earned for work in place (Change Orders) $
(c) Value of materials stored at site $
(d) Total amount earned ( (a) plus (b) plus…