BOAST RFOP_Traverse Elevation Assembly.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
BOAST RFOP- Traverse & Elevation Mech Assembly
Solicitation number
PANDTA-26-P-0000_036688
Issued by

About this file

This is a Request for Order Proposal (RFOP) issued by the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) under the Basic Ordering Agreement Sustainment Track (BOAST) program on September 2, 2026, with a response due date of October 5, 2026 at 1:00 PM Eastern. The solicitation is a competitive full and open action limited to active BOAST Basic Ordering Agreement holders, with award contingent on vendors maintaining a fully executed BOA prior to the closing date. The requirement is for the manufacture of a Traverse & Elevation Assembly (NSN 1005-01-592-1520, Part Number 13046600), classified as non-commercial, under NAICS code 332994 with a small business set-aside. The base order quantity is 102 units with an option for an additional 102 units (100% of base quantity). The contract will be firm-fixed-price, with First Article Test (FAT) units required within 150 calendar days of award, allowing up to 30 days for Government evaluation. All remaining production units must be delivered within 150 calendar days from written FAT approval. Delivery is FOB Destination to Army Supply Central Receiving Point in Anniston, Alabama, with inspection and acceptance at origin.

The procurement requires access to an export-controlled Technical Data Package (TDP), Drawing Number 13046600, necessitating vendors to obtain DD Form 2345 certification from the Joint Certification Program (JCP) prior to proposal submission. Proposals must consist only of a completed and signed pricing sheet with no separate technical proposal required. The Government intends to evaluate proposals without discussions and make award based on either price only or lowest-price technically acceptable methodology, as specified in the RFOP. Applicable clauses include Buy American/Balance of Payments Program requirements (DFARS 252.225-7001), inspection provisions, payment terms of net 30 days from invoice acceptance, and numerous DFARS and FAR clauses covering quality assurance, configuration management, OPSEC training, counterintelligence awareness, demilitarization, heavy phosphate coating specifications per MIL-DTL-16232, first article testing with contractor responsibility, and use of MIL-STD 1916 for acceptance sampling. The solicitation specifies military standard packaging per MIL-STD-2073-1 Method 42 and includes comprehensive technical and quality requirements documented in the attached Technical Data Package.

View the file

Other files

File Type Posted
Attachment 0001 FAT Waiver Worksheet.pdf PDF
QA.xlsx XLSX spreadsheet
BOAST RFOP_Traverse Elevation Assembly(2).xlsx XLSX spreadsheet
EHEH6C0541EH_CDRL.pdf PDF
TACOM OPSEC Plan (1).pdf PDF
CUI Attachment A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFOP

BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)

NOTICE ID: PANDTA-26-P-0000 036688 DATE ISSUED: 2-Sep-2026 RESPONSE DUE: 10/5/2026 , [ 1:00 PM Eastern]

ISSUE BY:U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA)CONTRACTOR:
ATTN:BOAST@army.milUIE / CAGE:
Richard Hall, Contract Specialist, Richard.G.Hall64.civ@army.milADDRESS:
Elizabeth Levine Welhouse, Contracting Officer, Elizabeth.L.Levinewelhouse.civ@army.milPOC NAME:
POC EMAIL:
POC PHONE:
BOA NUMBER:

GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program. There is a TDP associated with this opportunity. In order for a proposal to be vailid, the contractor must request TDP access in SAM.gov. A valid DD2345 is required and will be reviewed for approval.

II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.

III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 14 September 2026 1:00 PM EST.

REQUIREMENT DETAILSSupply / Service:Traverse & Elevation Assembly
NSN / Description:1005-01-592-1520
TDP / DWG No .13046600
Commerciality:Non-Commercial
NAICS:332994
Size Standard:1,000
Set-Aside Status:Small Business Set-Aside
Small Business Subcontracting Plan:Not Required
Order Rating:DO
Packaging Level:MILITARY B/ SPI 13046600-SPECIFICATION/STANDARD- MIL-STD-2073-1 METHOD 42
Ship-To Location:SR W0LX ARMY SUPPLY CENTRAL RECEIVING POINT 7 FRANKFORD AVE BLDG 362 ANNISTON, AL, 36201-4199
Inspect / Accept:Origin
FOB:Destination
Delivery Schedule:Schedule with First Article Test (FAT) Requirement:

The First Article Test (FAT) unit(s) specified in CLIN 0001AA shall be delivered within 150 calendar days ARO. Alternative schedules for the FAT unit(s) will not be considered. The Government requires up to 30 days for FAT evaluation and written approval/disapproval.

All remaining production units shall be delivered within 150 calendar days from the date of written FAT approval. Units on the option CLIN shall be delivered 150 calendar days from the date of the option being exercised. Alternate delivery schedules for the production and option units will be considered for this order. See Evaluation for Award Below.

Any acceleration in First Article Test Approval will be subtracted from the delivery schedule of the production units.

PRICING SHEET
Line ItemDescriptionNounNSNPart No.PRON / 1095QuantityUnit of MeasureDel Sch / RateUnit PriceTotal PriceNotes
00001AAFirst Article Test Report (FATR)First Article Test1005-01-592-152013046600PRON #1LO0
00002AAProduction QuantityTraverse & Elevation Assembly1005-01-592-152113046600EH6C0541EH102EA0
00003AAUnexercised OptionTraverse & Elevation Assembly1005-01-592-152213046600EH6C0541EH1020
A001Data RequirementEngineering Change Proposal (ECP)See Attachment-CDRLS EH6C0541EH0
A002Data RequirementRequest For Variance (RFV)See Attachment-CDRLS EH6C0541EH0
A003Data RequirementNotice Of Revision (NOR)See Attachment-CDRLS EH6C0541EH0
A004Data RequirementTest Procedure- Heavy Phosphate CoatingSee Attachment-CDRLS EH6C0541EH0
A005Data RequirementAcceptance Inspection Requirement (AIE) ReportSee Attachment-CDRLS EH6C0541EH
A006Data RequirementFirst Article Test Report (FATR)See Attachment-CDRLS EH6C0541EH0
Order Total$ - 0
[INSTRUCTION FOR CS/CO: This section is modular. You MUST select the appropriate methodology (A, B, or C) that matches your acquisition strategy and DELETE the other two before releasing the RFOP.]
PROPOSAL SUBMISSION INSTRUCTIONSProposal Content:Submission shall consist of a completed and signed Pricing Sheet contained in this RFOP. No separate technical proposal is required. The Government intends to evaluate proposals and award an order without discussions.
Submission Method:Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-PANDTA-21-P-0000 036688- [Your Company Name]". Late proposals will not be evaluated.
Period of AcceptanceProposals shall remain firm for at least 60 calendar days from the closing date of this RFOP.
Mandatory Eligibility Requirement For Award:To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated.
[INSTRUCTION FOR CS/CO: This section is modular. You MUST select the appropriate methodology that matches your acquisition strategy and DELETE the ROWS of the other two before releasing the RFOP.] **This row to be deleted prior to release**
(A)EVALUATION FOR AWARD(A) METHODOLOGY 1: Price OnlyThe Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder who submits the lowest-priced proposal. Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.

Evaluation: Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.

In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.
(B)EVALUATION FOR AWARD(B) METHODOLOGY 2: Lowest Price, Technically Acceptable (LPTA)This is a competitive action conducted under the procedures of FAR Part 15. The Contracting Office is using a streamlined Request for Proposal format for this acquisition. The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder whose proposal is determined to be the Lowest-Priced, Technically Acceptable (LPTA).
Technical Acceptability (Pass/Fail):All proposals will first be evaluated for technical acceptability. To be rated "Acceptable," a proposal must clearly demonstrate compliance with all minimum requirements of the SOW/TDP. Proposals that do not meet the minimum requirements will be rated "Unacceptable" and will not be considered for award. See Pricing Sheet section above and 'LPTA Factors & Ratings'.
Price:The price for all technically acceptable proposals will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price among the technically acceptable proposals. See Pricing Sheet section above and 'LPTA Factors & Ratings'.
In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.
(C)EVALUATION FOR AWARD(C) METHODOLOGY 3: Best Value TradeoffThis is a competitive action conducted under the procedures of FAR Part 15. The Contracting Office is using a streamlined Request for Proposal format for this acquisition. The Government intends to award an Order to the responsible BOA holder whose proposal represents the Best Value to the Government. This process permits tradeoffs between price and non-price factors, and the Government may award to a higher-priced offeror if its proposal is deemed to be of sufficiently higher technical merit to be worth the additional cost. [Insert the "Relative Importance" statement EXACTLY as it appears in your approved Tradeoff Evaluation Plan Addendum. e.g., "All non-price factors, when combined, are approximately equal in importance to price."]
A. Non-Price Factors: [List the non-price factors and their descriptions EXACTLY as they appear in your approved Tradeoff Evaluation Plan Addendum. This is where you connect the internal plan to the external document. Reference the "Tradeoff Factors & Ratings" tab of this RFOP for the adjectival rating definitions.]
Factor 1:[e.g., Technical Approach]
Factor 2: [Optional][e.g., Past Performance]
B. Price Factor: Price reasonableness will be determined using one or more of the price analysis techniques defined in FAR 15.404-1(b)(2), which may include, but are not limited to, comparison of proposed prices, comparison to the IGCE, or comparison to historical prices. The total evaluated price will be used for the best value tradeoff analysis.
In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.

REGULATORY COMPLIANCE BOA Attachment Reference: FAR Part 13_Simplified Procedures for Non-Commercial Acquisitions

Applicable Clauses:See 'Applicable Clauses-Provisions' sheet.
Payment Terms:Net 30 days from receipt of invoice and acceptance of goods.
Buy American / Trade Agreements:
(Select One)Buy American and Balance of Payments Program
(DFARS 252.225-7001)XBuy American --Free Trade Agreements--Balance of Payments Program (DFARS 252.225-7036)Trade Agreements (DFARS 252.225-7021)

NAME: DATE:

mailto:BOAST@army.mil Applicable Clauses-Provisions

Applicable Clauses/Provisions
ReferenceDateTitleBOA ReferenceRemarks
52.246-208-01-1996INSPECTION OF SUPPLIES--FIXED-PRICEBOA Attachment 0002 - FAR 13
52.246-1604-01-1984RESPONSIBILITY FOR SUPPLIESBOA Attachment 0002 - FAR 13
252.211-700809-01-2010USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS
252.211-700301-01-2023ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)BOA Attachment 0002 - FAR 13
52.242-1704-01-1984GOVERNMENT DELAY OF WORKBOA Attachment 0002 - FAR 13
52.247-3402-01-2006F.O.B. DESTINATION (JAN 1991)
52.247-4802-01-1999F.O.B. DESTINATION--EVIDENCE OF SHIPMENT
252.232-700601-01-2023WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)BOA Attachment 0002 - FAR 13
252.227-702704-01-1988DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE
252.232-700312-01-2018ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTSBOA Attachment 0002 - FAR 13
252.243-700112-01-1991PRICING OF CONTRACT MODIFICATIONSBOA Attachment 0002 - FAR 13
252.244-700011-01-2023SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023)
252.247-702310-01-2024TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024)BOA Attachment 0002 - FAR 13
252.204-700304-01-1992CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCTBOA Attachment 0002 - FAR 13
252.231-700012-01-1991SUPPLEMENTAL COST PRINCIPLESBOA Attachment 0002 - FAR 13
252.232-701012-01-2006LEVIES ON CONTRACT PAYMENTSBOA Attachment 0002 - FAR 13
252.203-700009-01-2011REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALSBOA Attachment 0002 - FAR 13
252.203-700212-01-2022REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022)BOA Attachment 0002 - FAR 13
252.204-701501-01-2023NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023)BOA Attachment 0002 - FAR 13
252.204-701801-01-2023PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)BOA Attachment 0002 - FAR 13
252.225-705601-01-2023PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023)BOA Attachment 0002 - FAR 13
252.240-799702-01-2026NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026)BOA Attachment 0002 - FAR 13
252.227-798902-01-2026RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026)
252.227-799102-01-2026RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036)

(FEB 2026)

252.227-799502-01-2026DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026)
252.227-799602-01-2026TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026)
252.240-7997 CD02-01-2026NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026)

(DEVIATION 2026-O0025)(FEB 2026)

52.211-502-01-2026MATERIAL REQUIREMENTS (FEB 2026)BOA Attachment 0002 - FAR 13
52.211-1504-01-2008DEFENSE PRIORITY AND ALLOCATION REQUIREMENTSBOA Attachment 0002 - FAR 13
52.222-102-01-1997NOTICE TO THE GOVERNMENT OF LABOR DISPUTESBOA Attachment 0002 - FAR 13
52.232-23 ALT 104-01-1984ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984)
52.243-102-01-2026CHANGES--FIXED PRICEBOA Attachment 0002 - FAR 13
52.247-6802-01-2006REPORT OF SHIPMENT (REPSHIP)BOA Attachment 0002 - FAR 13
52.249-804-01-1984DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)BOA Attachment 0002 - FAR 13
52.226-805-01-2024ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)BOA Attachment 0002 - FAR 13
52.204-1302-01-2026SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026)BOA Attachment 0002 - FAR 13
52.232-4003-01-2023PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023)BOA Attachment 0002 - FAR 13
52.203-1901-01-2017PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTSBOA Attachment 0002 - FAR 13
52.219-3302-01-2026NONMANUFACTURER RULE (FEB 2026)BOA Attachment 0002 - FAR 13
52.219-602-01-2026NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (FEB 2026)
52.240-9102-01-2026SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026)BOA Attachment 0002 - FAR 13
52.204-9102-01-2026CONTRACTOR IDENTIFICATION (FEB 2026)BOA Attachment 0002 - FAR 13
52.222-9004-01-2026ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
52.252-202-01-1998CLAUSES INCORPORATED BY REFERENCE (Feb 1998)
52.252-611-01-2020AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020)BOA Attachment 0002 - FAR 13
52.213-402-01-2026SIMPLIFIED ACQUISITIONS (NON COMMERICIAL) (DEVIATION FEB 2026)BOA Attachment 0002 - FAR 13
52.219-2802-01-2026POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026)BOA Attachment 0002 - FAR 13
52.204-1912-01-2014INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONSBOA Attachment 0002 - FAR 13
52.240-9302-01-2026BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026)BOA Attachment 0002 - FAR 13
252.203-700509-01-2022REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022)BOA Attachment 0002 - FAR 13
252.225-705308-01-2021REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION
252.204-700710-01-2025ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)BOA Attachment 0002 - FAR 13
252.204-701705-01-2021PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION
252.225-797308-01-2024PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014)
252.239-709804-01-2021PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003)
52.240-9002-01-2026SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS
52.225-1808-01-2018PLACE OF MANUFACTUREBOA Attachment 0002 - FAR 13
252.270-700011-01-2024Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024)BOA Attachment 0002 - FAR 13
252.270-700111-01-2024Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024)BOA Attachment 0002 - FAR 13
52.214-3404-01-1991SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGEBOA Attachment 0002 - FAR 13
52.214-3504-01-1991SUBMISSIONS OF OFFERS IN U.S. CURRENCYBOA Attachment 0002 - FAR 13
52.215-102-01-2026INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026)BOA Attachment 0002 - FAR 13
52.204-702-01-2026SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026)BOA Attachment 0002 - FAR 13
52.211-1404-01-2008NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USEBOA Attachment 0002 - FAR 13
52.252-102-01-1998SOLICITATION PROVISIONS INCORPORATED BY REFERENCEBOA Attachment 0002 - FAR 13
52.252-511-01-2020AUTHORIZED DEVIATIONS IN PROVISIONSBOA Attachment 0002 - FAR 13
252.227-701501-01-2025TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)
252.227-701601-01-2023RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023)
252.227-702501-01-2025LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025)
252.227-703003-01-2000TECHNICAL DATA--WITHHOLDING OF PAYMENT
252.227-703701-01-2025VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025)
252.204-700010-01-2016DISCLOSURE OF INFORMATIONBOA Attachment 0002 - FAR 13
252.225-704806-01-2013EXPORT-CONTROLLED ITEMSBOA Attachment 0002 - FAR 13
252.204-701205-01-2024SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1)BOA Attachment 0002 - FAR 13
252.204-702011-01-2023NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)BOA Attachment 0002 - FAR 13
252.204-700810-01-2016COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLSBOA Attachment 0002 - FAR 13
252.215-701301-01-2023SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023)BOA Attachment 0002 - FAR 13
252.204-701911-01-2023NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTSBOA Attachment 0002 - FAR 13
252.227-701308-01-2025RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025)
252.227-702806-01-1995TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT
252.225-700102-01-2024BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024)BOA Attachment 0002 - FAR 13
52.246-1112/1/14HIGHER-LEVEL CONTRACT QUALITY REQUIREMENTISO 90001:2015 (21 Oct 2015) Untailored
52.209-3 ALT 1 and 29/1/89FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE I (JAN 1997) AND ALTERNATE II (SEP 1989)
The contractor shall test 5 unit(s) of Lot/Item 13046600, to include all subassemblies, as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing of the time and location of the testing so that the Government may witness the tests. The Contractor shall submit the first article test report within TBD by PCO calendar days from the date of this contract to (add address): Send electronic FATR to: The Contracting Officer and to FDCC ORG EMAIL as follows: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil. Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. Estimated FAT completion 30 days.

Technical & Quality Requirement

TECHNICAL & QUALITY REQUIREMENTS
NOTES FOR THE CONTRACTING PROFESSIONAL *Delete this section prior to release of RFOP*

Insert only the required Local Narratives or Special Item Requirements dictated by your specific Requirements Package or Technical Data Package (TDP).

TitleInstructions/Narrative
DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801–4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C “Technical Data Package” instructions.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A00X.

(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A00X.

(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A00X.

f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).
REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN(a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.

Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP) Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete “Counterintelligence Awareness and Reporting for DoD Employees” – CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.

In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:

• DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381–12 • 13 June 2025 11

• DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.

• DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.

• DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.

• Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.

• Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.

• Personnel with access to Sensitive Compartmented Information and Special Access Programs.

• Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.

• Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.

• Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.

• Professional and educational exchange programs with foreign governments.

These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.

Engineering ExceptionsPlease note that there are Engineering Exemptions applicable to this procurement. The exemptions can be found with the TDP in SAM.gov and will require the same access procedures as access to the TDP.
HEAVY PHOSPHATE COATING REQUIREMENTa. Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the Contract Data Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.

b. Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."

c. Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."

d. Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."

e. The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".

To obtain MIL Specs, MIL Standards, QPL and QPD products see <https://assist.dla.mil/online/start />.

To obtain MIL Specs, MIL Standards, QPD products see <https://assist.dla.mil/online/start/>.

f. A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.

g. Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-PRF-46010.

h. Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.

i. Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.

j. Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for 336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than 5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.

k. Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.

l. Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.

INSPECTION AND ACCEPTANCE POINTS: ORIGIN The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip) First Article Test (Contractor Testing) a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil.

f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.

DEMILITARIZATION AND TRADE SECURITY CONTROL REQUIREMENTS AND PROCEDURES (a) Demil and Trade Security Controls (TSCs) Summary:

(1) This procurement action has a demil and/or TSC consideration requirement. The demil and trade security control provisions in this solicitation implement the policy and requirements of the “Arms Export Control Act,” 22 United States Code (U.S.C.), Section 2778, the “International Traffic in Arms Regulations (ITAR)” at 22 Code of Federal Regulations (CFR), Parts 120-130, the “Export Administration Regulations (EAR)”, at 15 CFR 730-774 and the “Export Administration Act”. Regulatory requirements and guidance are contained in Federal Acquisition Regulation (FAR) 45.6, “Reporting, Redistribution, and Disposal of Contractor Inventory” and Defense Federal Acquisition Regulation Supplement (DFARS) 245.604, “Restrictions on Purchase or Retention of Contractor Inventory.”

(2) Demil and TSC policy is promulgated via Department of Defense (DoD) regulations and in the establishment of contract requirements. Accordingly, the Government’s right to require demilitarization is a contractual right, subject to the authority and discretion of the Procuring Contracting Officer (PCO). Therefore the PCO may or may not forward Contractor demilitarization waiver request to the DoD Demilitarization Program Manager for review and approval, even when there is certifiable Contractor’s compliance with all existing TSC regulations. The waiver approval process is described in paragraph 6 below.

(3) The DoD policy and requirements for demil are contained in the DoDM 4160.28-M-V1, V2, and V3, Defense Demilitarization Manuals (hereinafter referred to as Demil Manual, available at <http://www.dtic.mil/whs/directives/corres/pub1.html>). This manual is hereby incorporated by reference, and its terms, conditions, and procedures are valid and enforceable as contractual requirements. If there is a conflict between the Demil Manual and the Demil and/or TSC language herein, the Demil Manual takes precedence.

(4) This contract requires the manufacture, assembly, test, maintenance, repair, and/or delivery of military/defense items. This SOW sets forth the requirements for the control and corresponding certification and verification of disposition of “contract excess property.” These requirements are applicable to any Contractor and/or Subcontractor who perform work under this contract. This SOW is a mandatory flow-down; accordingly, Contractor/Subcontractor must include this language in subcontracts for work under this solicitation and resulting contract.

(5) The demil and TSC requirements apply to all materials and property (Government furnished equipment (GFE)), special tools and special test equipment, manufactured parts in whatever stage of assembly, and associated technical data including technical manuals, drawings, process sheets, and working papers) bought, assembled, produced, or provided by the Government under this contract regardless of the type of contract and regardless of who has title to the material. The intent is to control military/defense items in accordance with statutory and regulatory requirements. Bidders’/offerors’ proposed prices under this solicitation and any resulting contract should include any and all cost(s) to comply with this SOW and the Government’s demil and TSC requirements.

(6) In general, the demil requirements must be met upon completion of the contract. For indefinite delivery contracts as defined by FAR 16.501-2, demil requirements must be met upon the expiration of the potential contractual performance period as described in section A of the contract and/or in section B (the schedule) of the contract; or upon contract termination if the contract is terminated earlier. Contractor(s) awarded a contract with demil requirements shall be responsible for maintaining an inventory system capable of recording, safeguarding and tracking all material, work in process, components associated or related to the performance of the contract for the purpose (not intended to be exclusive) of enabling the Contractor to fulfill its demil obligations under this SOW. The Contractor will provide a copy of demil certificates to the PCO within 30 days for inclusion in the contract file.

(7) The Contractor agrees that demil performed under this contract will be conducted in accordance with this SOW or DoDM 4160.28-M-V1, V2 and V3, Demil Manual, and all demilitarized material will meet or exceed the definition of scrap as defined by this SOW.

(b) Definitions:

(1) “Contract excess property” is property of the type covered by this contract for which the contractor does not claim payment or has been denied payment and all GFE not returned to the Government upon completion of the contract. This includes, but is not limited to, rejects and overruns. Contract excess property (whether title to the property is in the Government or not) includes completed or partially completed parts, components, subassemblies, assemblies, end items, special tools and test equipment, and all associated technical manuals, technical data, packaging and labeling. Contract excess property shall be controlled and final disposition determined by assigned demil code unless waived by the DoD Demil PM.

(2) “Excess GFE” is equipment/technical data provided by the U. S. Government to the Contractor that the Contractor no longer needs to satisfy the contract’s requirements, which the Government does not want returned during or at the completion of the contract.

(3) “Demilitarization” is the act of destroying the military offensive and defensive characteristics inherent in certain types of equipment and material to the degree necessary to preclude its restoration to a usable condition. The term includes mutilation, dumping at sea, cutting, crushing, shredding, melting, burning or alteration designed to prevent the further use of this equipment and material for its originally intended military purpose. It applies equally to material in unserviceable and serviceable condition.

(4) “Scrap” is material that has no value except for its basic material content.

(5) “Munitions list item (MLI)” is any item contained in the U. S. Munitions List, 22 CFR 120-130.

(6) “Commerce control list item (CCLI)” is a multi-use (military, commercial and other strategic use) item under the jurisdiction of the Bureau of Export Administration, U. S. Department of Commerce, through the Export Administration Regulations, 15 CFR 730-774. The types of items on the CCL may be commodities (i. e., equipment, materials, or electronics), software, or a particular technology.

(7) “Trade security control (TSC)” is control procedures designed to preclude the sale or shipment of Munitions List or Commerce Control List items to any entity whose interests are inimical to those of the United States. These controls are also applicable to such other selected entities as may be designated by the Deputy Under Secretary of Defense (Trade Security Policy).

(8) “Commercial type property” is material, equipment, software, or technology not generally considered to be unique and peculiar to DoD and possessing commercial marketability.

(9) “Significant military equipment (SME)” is material for which special export controls are warranted because of their capacity for substantial military utility or capability. Items designated as SME require worldwide demil as prescribed in DoDM 4160.28-M-V1, V3 and V3, Demil Manual.

(10) “Ammunition, explosives, and dangerous articles (AEDA)” is any substance that by its composition and chemical characteristics, alone or when combined with another substance, is or becomes an explosive or propellant or is hazardous or dangerous to personnel, animal or plant-life, structures, equipment or the environment as a result of blast, fire, fragment, radiological or toxic effects. AEDA is not a criterion for demil. AEDA items not on the Munitions List would be coded A or Q.

(c) Applicability:

This solicitation/contract is for the production of MLIs or CCLIs and contract excess may require demil and TSCs. This SOW is applicable to prime and Subcontractors.

(d) Contractor Demil and TSCs:

(1) The Contractor will demil and apply TSCs as required on all contract excess property as dictated by the Government assigned demil code and its definition and the demilitarization and trade security controls matrix in paragraph 9 below. Demil codes and definitions can be accessed per paragraph 8 below.

(2) The Contractor will contact the PCO for declassification, safety and demil instructions for contract excess property with an assigned demil code of “P”, “F”, or G”.

(3) The Contractor will demil all associated excess technical data.

(e) Demil Certification and Verification (DC&V):

(1) During or upon completion of manufacturing under this contract, the prime Contractor shall notify the PCO in a timely manner that a Government representative is required to witness demil of contract excess property produced under this contract whether the prime Contractor or a Subcontractor is performing the demil.

(2) Subcontractors shall notify the prime Contractor in a timely manner who shall notify the PCO that a Government representative is required to witness demil of contract excess property produced under this contract.

(3) The Government Quality Assurance Representative (QAR) will forward all demil certificates and the final DD Form 250 to the PCO so that final payment can be made. The PCO will not release the final DD Form 250 for payment unless all pertinent demilitarization certificates from all prime and subcontractors involved have been received. If the Contractor is using the Wide Area Workflow (WAWF) Receipt-Acceptance system, the QAR will ensure all demil certificates are attached to the final WAWF Receiving Report before accepting the shipment. The Demil Certification and Verification Certificate will be forwarded to the PCO to become part of the contract file.

(4) A Contractor’s representative certifies and a technically qualified U.S. Government QAR (United States citizen) is designated as the U.S. Government official responsible for executing the Demil verification unless another U.S. Government official is designated in writing by the PCO. Both shall actually witness the demil; and both shall sign and date the DA Form 7579 available at <http://www.apd.army.mil/>.

(f) Demil Waivers:

(1) The Contractor may request a demil waiver for contractual requirements. However, any waiver must be predicated upon disposition of material in a manner that is consistent with the guidelines and intent of applicable demil and TSC laws and regulations. All requests for demil waivers must be submitted in writing through the PCO and the Army’s Demil PM to the DoD Demil PM. Waiver request must be approved prior to Contractor disposition of any contract excess property and prior to the release of final WAWF submittal for payment. All waiver requests must specify the items, quantity, proposed disposition of the material, and any additional terms. If written approval of the request for a demil waiver is not granted within 45 days of submission, the demil request shall be deemed disapproved. The Contractor is not entitled to demil waiver. Contact the PCO for additional specific guidance.

(2) When a demil waiver is approved, all packaging and Government property containing non-removable markings shall have these markings permanently obliterated before any non-demilitarized disposition.

(g) Disputes - any disputes shall be addressed in accordance with the “Disputes” clause in this solicitation/contract.

(h) Contractor Access and Identification of Demilitarization Requirements:

(1) Contractors will identify demilitarization requirements by accessing the assigned demilitarization code via the Internet using the following steps:

a. Logon to the WebFLIS Web site <http://www.dlis.dla.mil/WebFlis/pub/pub_search.aspx>.