This document is a mechanical systems diagram (riser diagram) depicting the piping and equipment layout for a building's HVAC and water systems. The diagram includes detailed schematic representations of various systems such as hot water supply and return (HWS/HWR), chilled water supply and return (CWS/CWR), low-pressure steam supply and return (LPS/LPR), and medium-pressure steam supply (MPS). Key equipment shown includes chillers (CH-1, CH-2), pumps (P-1 through P-9), heat exchangers, expansion tanks, air separators, and various valves like motor-operated isolation valves, gate valves, and check valves. The diagram uses color-coded lines to represent different pipe systems and includes a comprehensive legend explaining symbols and abbreviations for mechanical and plumbing components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LB-01-02ME.pdf | ||
| Bldg 2 - PH-ME.pdf | ||
| RM Language for Contracts.docx | DOCX document | |
| 230923 HVAC Controls Specification.docx | DOCX document | |
| 010000 Lebanon General Requirements Spec.docx | DOCX document | |
| 595-26-204 DB SOW - Replace Chillers Bldgs 1-2-104.docx | DOCX document | |
| LB-104-0RME.pdf | ||
| 595-26-204 Instructions to Offerors PDF.docx | DOCX document | |
| 013526 Lebanon Safety Requirements Spec 20240516.docx | DOCX document | |
| P03 07.08.2025 Service Determination.pdf | ||
| Davis-Bacon Act WD PA20250093 10.3.25.pdf | ||
| 36C24426R0020_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/4"
1" HWS AND HWR
UP TO CUH-4 ON
FIRST FLOOR
1" HWS AND HWR
UP TO CUH-5 ON
FIRST FLOOR
1¼"
4" HWS AND HWR UP
TO FIRST FLOOR
3/4"
1"
1"
3/4"
1¼"
4"
1"
P-8
HWS
HWR
HWR
HWS
HWS
HWR
UH
-6
UH
-5
HWS
HWR
UH-7
P-9
FFD
CHILLED WATER PUMP
VARIABLE FREQUENCY
DRIVE
4"
4"
4"
HOT WATER PUMP
VARIABLE FREQUENCY
DRIVE
3/4" 3/4"1"
2"
4"
4"
4"
HWS
HWR
HWR
HWS
P-4
P-5
HX
-1
PRV-1
ET-1
AS-2
AS-1
AS-3
ET-3
ET-2UH-4
P-6
P-7
P-1
CR-1
6"
2" CWS AND CWR
UP TO FIRST FLOOR 2"
3"
2 1/2" CWS AND CWR
UP TO FIRST FLOOR
EMERGENCY 2 1/2"
CWS AND CWR UP TO
FIRST FLOOR
MOTOR OPERATED
ISOLATION VALVE
2½"
MOTOR OPERATED
ISOLATION VALVE
3"
2"
2"
2½"
CWS
CWR
CWS
CWR
CWR
2½"
CWR
CWS
CWR
CWS
CWS
CWS
CWR
CWR
MOTOR OPERATED
ISOLATION VALVE
MOTOR OPERATED
ISOLATION VALVE
CWR
CWR
CWS
CWS
6 CHILLED
WATER SUPPLY AND
RETURN UP TO
CHASE
ABOVE
6"
3"
CWS
CWR
5"
4"
3" LPR
UP TO FIRST FLOOR
5" LPS
UP TO FIRST FLOOR
4"
LPR
LPS
5"
4"
5"
2 1/2" LPR FROM
DOMESTIC WATER HEATER
4" LPS TO DOMESTIC
WATER HEATER
3" LPR TO RECEIVER
3"
3"
LPR
LPS
LP
S
LP
S
LPR
2½"
PC
PC
4"
2½"
PC
V
4" V UPTO
FIRST FLOOR
6"
24"x24" UP TO FIRST
FLOOR WITH FIRE
DAMPER AT FLOOR
PENETRATION
(Z)1800
MP
S
MPS
6"
MPS
(Z)1800
36"X14"
GRILLE
THERMOSTAT
CHECK VALVE
MOTOR OPERATED ISOLATION VALVE
GATE VALVE
VOLUME DAMPER
FFD FIRE DAMPER AT FLOOR PENETRATION
PUMP
PIPE UP
FLOW DIRECTION IN PIPE
PIPE GUIDE OR SLEEVE
ANCHOR
ELBOW DOWN
UNIT HEATER
SYMBOL DESCRIPTION
LEGEND/LINETYPES
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
CWS COLD WATER SUPPLY
CWR COLD WATER RETURN
LPS LOW PRESSURE STEAM SUPPLY
LPR LOW PRESSURE STEAM RETURN
HPS HIGH PRESSURE STEAM SUPPLY
PC PUMPED CONDENSATE
V VENT PIPE
ABBREVIATIONS USED:
P: PUMP
ET: EXPANSION TANK
HX: HEAT EXCHANGER
AS: AIR SEPARATOR
CR: CONDENSATE RECEIVER
ET: EXPANSION TANK
PRV: PRESSURE REDUCING VALVE
MOTOR OPERATED DAMPER
CH-1
CH-2
CH: CHILLER UNIT
LOUVER
ISOLATION VALVE
CW
S
CW
R
6"
6" CHILLED WATER SUPPLY AND
RETURN FROM CAMPUS CHILLED
WATER SYSTEMS.
RISER
CRAWL SPACE
STAIR
MECH
MECH
MECH
MECH
MECH
ACCESS DOOR
ACCESS DOOR
P-2
P-3
P-4
6"CWR
3"PW
S
4-LEB-2-CW-1
TRANSDUCERS
4-LEB-2-PW-1
TRANSDUCERS
MPS MEDIUM PRESSURE STEAM SUPPLY
File details come from the government source that posted it. Updated .