Bland_Library_SOW_Drilling__-_REVISED_062526.pdf

PDF 209 KB Posted

Attached to
RFQ Asbestos Abatement Required to support Drilling the Holes for the Security Gates at the Library - USMMA
Solicitation number
6923G226Q000022
Issued by
Nassau County, New York

About this file

This Statement of Work (SOW) is issued by the United States Merchant Marine Academy (USMMA) in Kings Point, New York, for asbestos abatement and regulated drilling work at Bland Memorial Library. The project requires a qualified contractor to perform ACM-regulated drilling and anchor installation activities within approximately 30 square feet beneath existing carpet, including drilling twenty-four 1/2-inch diameter holes and sixteen 1/4-inch diameter holes through asbestos-containing materials, followed by installation of corresponding drop-in anchors to secure security gate infrastructure. The work must be completed within two working days following issuance of the Notice to Proceed and shall comply with all applicable federal, state, and local regulations, including OSHA Asbestos Standards (29 CFR 1926.1101 and 1910.1001), EPA NESHAP (40 CFR Part 61, Subpart M), New York State Industrial Code Rule 56, and Davis-Bacon and Related Acts requirements. Since USMMA is listed on the National Register of Historic Places, all work must conform to the Secretary of the Interior's Standards for the Treatment of Historic Properties and Standards for Rehabilitation (36 CFR parts 67.7 and 68).

The SOW specifies detailed work practices including establishment of regulated asbestos work areas with warning signs, continuous wet drilling methods with HEPA-filtered equipment capable of capturing 0.3 microns at 99.97% efficiency, local exhaust ventilation, hole clean-out protocols using HEPA-vacuum shrouds, and final substrate decontamination prior to demobilization. The contractor must submit a Site-Specific Asbestos Work Plan, valid New York State Asbestos Contractor and Supervisor licenses, worker training certifications, equipment laboratory testing documentation, and final waste manifests from an NYS-approved disposal facility. The project is designated as a Total Small Business Set-Aside under NAICS code 562910 (Remediation Services). Final clearance sampling will be conducted by an academy-awarded monitoring contractor, with regulatory clearance requirements of 70 structures per square millimeter or lower and 0.01 fibers per cubic centimeter or lower; if clearance criteria are not met, the work area must be recleaned until standards are achieved.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Project Title: ACM-Regulated Drilling & Anchor Installation Work – USMMA Bland Library

Location: United States Merchant Marine Academy (USMMA), Kings Point, NY

1. Scope of Work The Contractor shall provide all labor, supervision, equipment, materials, and incidentals necessary to perform regulated drilling and anchor installation activities within an approximately 30-square-foot area beneath the existing carpet in the USMMA Bland Memorial Library. The work includes drilling twenty-four (24) 1/2-inch diameter holes and sixteen (16) 1/4-inch diameter holes through building materials confirmed or assumed to contain Asbestos-Containing Material (ACM). Following regulated drilling, the Contractor shall install 1/2-inch diameter (3/8x16) and 1/4-inch diameter (1-1/2 inch) drop-in anchors flush with the substrate within the designated area.

The work includes:

• Drilling approximately twenty-four (24) holes with a 1/2-inch diameter and a depth of 3/8x16 through building materials confirmed or assumed to contain Asbestos-Containing Material (ACM).

• Drilling approximately sixteen (16) holes with a 1/4-inch diameter and a depth of 1-1/2 inches through building materials confirmed or assumed to contain ACM to secure wire raceway molding.

• Installing twenty-four (24) 1/2-inch diameter, 3/8x16 deep drop-in anchors flush with the substrate within the designated area.

• Installing sixteen (16) 1/4-inch diameter, 1-1/2 deep drop-in anchors to secure the wire raceway molding.

Because the USMMA is listed on the National Register of Historic Places, all work shall be fully consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties (36 CFR part 68). Additionally, all work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards for Rehabilitation, following the application guidelines published by the Technical Preservation Services branch of the National Park Service (36 CFR 67.7).

2. Regulatory Compliance All work shall be performed in strict accordance with applicable federal, state, and local regulations, including but not limited to:

• OSHA Asbestos Standards – 29 CFR 1926.1101 and 29 CFR 1910.1001

• EPA NESHAP – 40 CFR Part 61, Subpart M

• New York State Industrial Code Rule 56 (12 NYCRR Part 56)

• New York State Department of Labor asbestos licensing requirements

• U.S. Department of Labor – Davis-Bacon and Related Acts (DBRA)

3. Work Practices

• Area Controls: Establish a regulated asbestos work area with warning signs and access controls.

• Asset Protection: Carefully roll back and protect existing carpet for reinstallation upon completion.

• Engineering Controls: Utilize continuous wet methods, HEPA-filtered drilling tools, and local exhaust ventilation.

• Hole Clean-out Protocol: Prior to inserting anchors, clean each drilled hole using a HEPA-vacuum shroud or an integrated aspiration system to extract residual ACM dust directly from the bottom of the cavity. Maintain local negative pressure exhaust source capture at all times, to prevent dust propagation.

• Anchor Setting: Install the 1/2 inch in diameter, 3/8x16 deep & the 1/4-inch diameter,1-1/2 deep drop-in anchors to proper embedment depth using the manufacturer's specified setting tool to ensure the internal expansion plug is completely driven.

• Waste Management: Properly containerize, label, transport, and dispose of all ACM waste at a NYS-approved facility.

• Final Decontamination: Perform a final HEPA cleaning of the substrate prior to demobilization.

• Equipment Performance: Utilize HEPA equipment with a minimum filter requirement capable of capturing 0.3 microns with 99.97% efficiency.

4. Submittals The Contractor must provide the following document submissions before and after the project:

• Site-Specific Asbestos Work Plan / Occupant Protection Plan

• NYS Asbestos Contractor License & Supervisor Licenses

• Worker Training Certifications - including but not limited to NYS Asbestos contractor license, asbestos handler, or equivalent regulatory standards

• Equipment & Material Submittals:

o Laboratory testing certification for HEPA-filtered vacuum and drilling systems.

• Waste Manifests/Shipment Records (including final waste manifest) (After Award)

5. Schedule Work shall be fully completed within Two (2) working days after issuance of the Notice to Proceed.

6. Additional Information

• The Contractor shall work alongside the academy’s awarded monitoring/sampling contractor.

• A final lead and asbestos clearance sampling/monitoring will be conducted by the academy’s awarded monitoring/sampling contractor.

• EPA Asbestos Regulatory Clearance Levels:

1. 70 structures per square millimeter (s/mm²) or lower.

2. 0.01 fibers per cubic centimeter (f/cc) or lower.

• If sampling results for the work area do not meet the regulatory clearance criteria, the work area shall be thoroughly recleaned using the appropriate regulatory methods and standards until final clearance results are met.