This document is an Award Notice for contract BL173-23, Construction and/or Replacement of Concrete Curbs, Gutters, Basin Lids, and Sidewalks on an Annual Contract, issued by the Gwinnett County Department of Transportation. The contract was awarded to DAF Concrete, Inc. and Peach State Construction Co., LLC in the amount of $2,000,000.00 pursuant to bids received on January 4, 2024. The contract includes approximately 59 line items for various concrete and sidewalk work, with unit prices and estimated quantities provided. The contract term is for one year with renewal options for up to four additional one-year terms.
The bid tabulation provides detailed pricing from six bidders, including unit prices and total prices for the estimated quantities. Pricing terms indicate the vendors' willingness to hold firm pricing for the renewal options, with price increases ranging from 3-15% over the base term. No information is provided on any set-asides, incumbents, funding sources, or other salient details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL173_23 Ad1.pdf | ||
| BL173_23 Ad3.pdf | ||
| BL173_23 INV.pdf | ||
| BL173_23 Ad2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 6, 2024
AWARD NOTICE
BL173-23
Construction and/or Replacement of Concrete Curbs, Gutters, Basin Lids, and Sidewalks on an Annual Contract
Pursuant to the bids received on January 4, 2024 for BL173-23, Construction and/or Replacement of Concrete Curbs, Gutters, Basin Lids, and Sidewalks on an Annual Contract, the bid has been awarded to DAF Concrete, Inc. and Peach State Construction Co., LLC in the amount of $2,000,000.00. Please note the enclosed bid tabulation.
We appreciate your bid and interest in Gwinnett County.
Sincerely, Michael Milstein Purchasing Associate II
MM/km
Enclosure
BID TABULATION PAGE 1 of 3
Construction and/or Replacement of Concrete Curbs, Gutters, Basin Lids, and Sidewalks on an Annual Contract Department of Transportation
ITEM # DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
1 Concrete curb & gutter 6" x 24" x 12" high back - under 50 LF 500 LF $177.85 $88,925.00 $20.00 $10,000.00 $45.00 $22,500.00 $35.00 $17,500.00 $30.00 $15,000.00 $49.00 $24,500.00 2 Concrete curb & gutter 8" x 24" x 12" high back - under 50 LF 500 LF $185.35 $92,675.00 $20.00 $10,000.00 $60.00 $30,000.00 $40.00 $20,000.00 $30.00 $15,000.00 $51.00 $25,500.00
3 Concrete curb & gutter 6" x 24" x 12" high back - 50 LF to 500 LF 1,000 LF $106.02 $106,020.00 $25.00 $25,000.00 $43.00 $43,000.00 $35.00 $35,000.00 $20.00 $20,000.00 $49.00 $49,000.00
4 Concrete curb & gutter 8" x 24" x 12" high back - 50 LF to 500 LF 1,000 LF $92.49 $92,490.00 $25.00 $25,000.00 $58.00 $58,000.00 $40.00 $40,000.00 $18.00 $18,000.00 $51.00 $51,000.00
5 Concrete curb & gutter 6" x 24" x 12" high back - over 500 LF 600 LF $62.66 $37,596.00 $20.00 $12,000.00 $40.00 $24,000.00 $30.00 $18,000.00 $20.00 $12,000.00 $47.00 $28,200.00
6 Concrete curb & gutter 8" x 24" x 12" high back - over 500 LF 600 LF $66.59 $39,954.00 $20.00 $12,000.00 $55.00 $33,000.00 $40.00 $24,000.00 $18.00 $10,800.00 $49.00 $29,400.00
7 Concrete curb & gutter 6" x 24" x 10" roll back - under 50 LF 200 LF $176.93 $35,386.00 $22.00 $4,400.00 $40.00 $8,000.00 $37.50 $7,500.00 $40.00 $8,000.00 $49.00 $9,800.00
8 Concrete curb & gutter 6" x 30" x 12" high back - under 50 LF 50 LF $180.56 $9,028.00 $35.00 $1,750.00 $58.00 $2,900.00 $40.00 $2,000.00 $40.00 $2,000.00 $54.00 $2,700.00
9 Concrete curb & gutter 8" x 30" x 12" high back - under 50 LF 50 LF $185.05 $9,252.50 $35.00 $1,750.00 $75.00 $3,750.00 $50.00 $2,500.00 $50.00 $2,500.00 $56.00 $2,800.00
10 Concrete curb & gutter 6" x 30" x 12" high back - 50 LF to 500 LF 150 LF $108.73 $16,309.50 $35.00 $5,250.00 $55.00 $8,250.00 $37.50 $5,625.00 $28.00 $4,200.00 $53.00 $7,950.00
11 Concrete curb & gutter 8" x 30" x 12" high back - 50 LF to 500 LF 150 LF $113.22 $16,983.00 $35.00 $5,250.00 $73.00 $10,950.00 $40.00 $6,000.00 $30.00 $4,500.00 $55.00 $8,250.00
12 Concrete curb & gutter 6" x 30" x 12" high back - over 500 LF 1,000 LF $72.78 $72,780.00 $32.00 $32,000.00 $52.00 $52,000.00 $37.50 $37,500.00 $25.00 $25,000.00 $53.00 $53,000.00
13 Concrete curb & gutter 8" x 30" x 12" high back - over 500 LF 1,000 LF $73.52 $73,520.00 $34.00 $34,000.00 $70.00 $70,000.00 $40.00 $40,000.00 $30.00 $30,000.00 $55.00 $55,000.00
14 Concrete doweled integral curb GA DOT 9032B including dowel bars & long reinforcement - 500 LF or less 1,000 LF $87.54 $87,540.00 $5.00 $5,000.00 $30.00 $30,000.00 $40.00 $40,000.00 $15.00 $15,000.00 $53.00 $53,000.00
15 Concrete doweled integral curb GA DOT 9032B including dowel bars & long reinforcement - over 500 LF 1,500 LF $75.96 $113,940.00 $4.00 $6,000.00 $28.00 $42,000.00 $40.00 $60,000.00 $15.00 $22,500.00 $53.00 $79,500.00
16 Concrete doweled integral curb GA DOT 90328 including dowel bars & long reinforcement - over 2,000 LF 3,000 LF $75.36 $226,080.00 $1.00 $3,000.00 $25.00 $75,000.00 $40.00 $120,000.00 $14.00 $42,000.00 $53.00 $159,000.00
17 Concrete header curb GA DOT 90328 including longitudinal reinforcement 100 LF $96.67 $9,667.00 $20.00 $2,000.00 $35.00 $3,500.00 $40.00 $4,000.00 $12.00 $1,200.00 $53.00 $5,300.00
18 Remove existing curb & gutter - all sizes - complete 2,000 LF $54.29 $108,580.00 $5.00 $10,000.00 $30.00 $60,000.00 $50.00 $100,000.00 $20.00 $40,000.00 $52.00 $104,000.00
19 Remove existing driveway/sidewalk pavement - all types -complete 1,000 SY $78.38 $78,380.00 $5.00 $5,000.00 $35.00 $35,000.00 $50.00 $50,000.00 $40.00 $40,000.00 $68.00 $68,000.00
20 6" Concrete pavement including reinforcement for driveways, parking & miscellaneous 500 SY $206.38 $103,190.00 $50.00 $25,000.00 $80.00 $40,000.00 $80.00 $40,000.00 $56.00 $28,000.00 $47.00 $23,500.00
21 8" Concrete pavement including reinforcement for driveways, parking & miscellaneous 250 SY $231.94 $57,985.00 $60.00 $15,000.00 $105.00 $26,250.00 $100.00 $25,000.00 $65.00 $16,250.00 $49.00 $12,250.00
22 Saw cuts in existing pavements 3,000 LF $6.00 $18,000.00 $1.00 $3,000.00 $5.00 $15,000.00 $5.00 $15,000.00 $1.00 $3,000.00 $2.00 $6,000.00
23 Catch basin throats, single wing 6 EA $4,896.80 $29,380.80 $1,500.00 $9,000.00 $3,000.00 $18,000.00 $2,500.00 $15,000.00 $650.00 $3,900.00 $2,500.00 $15,000.00
24 6" Catch basin lids, single wing 5 EA $4,364.77 $21,823.85 $1,500.00 $7,500.00 $3,000.00 $15,000.00 $2,500.00 $12,500.00 $650.00 $3,250.00 $2,500.00 $12,500.00
25 Catch basin throats, double wing 6 EA $4,896.80 $29,380.80 $1,500.00 $9,000.00 $5,000.00 $30,000.00 $2,500.00 $15,000.00 $650.00 $3,900.00 $2,500.00 $15,000.00
26 6" Catch basin lids, double wing 5 EA $4,364.77 $21,823.85 $1,500.00 $7,500.00 $5,000.00 $25,000.00 $2,500.00 $12,500.00 $650.00 $3,250.00 $2,500.00 $12,500.00
27 Graded aggregate base, if required under structure 10 TN $90.00 $900.00 $100.00 $1,000.00 $65.00 $650.00 $44.00 $440.00 $75.00 $750.00 $48.00 $480.00
28 Concrete spillway, GA DOT 9013 Type I, 2, 3, 4, as applicable 50 SY $435.56 $21,778.00 $70.00 $3,500.00 $85.00 $4,250.00 $75.00 $3,750.00 $55.00 $2,750.00 $49.00 $2,450.00
29 Concrete sidewalk, 4" thick under 50 LF 7,500 SY $214.53 $1,608,975.00 $45.00 $337,500.00 $50.00 $375,000.00 $60.00 $450,000.00 $44.00 $330,000.00 $68.00 $510,000.00
30 Concrete median curb, 6" high 1,000 LF $66.71 $66,710.00 $20.00 $20,000.00 $75.00 $75,000.00 $40.00 $40,000.00 $12.00 $12,000.00 $56.00 $56,000.00
31 Concrete median curb, extruded, 4" high; including dowel bars & longs reinforcement 250 LF $80.44 $20,110.00 $24.00 $6,000.00 $70.00 $17,500.00 $35.00 $8,750.00 $12.00 $3,000.00 $59.00 $14,750.00
32 Class B concrete paving 6-inch depth 100 SY $143.21 $14,321.00 $350.00 $35,000.00 $90.00 $9,000.00 $70.00 $7,000.00 $70.00 $7,000.00 $215.00 $21,500.00
33 Stamped concrete with red dye 50 SY $225.20 $11,260.00 $150.00 $7,500.00 $150.00 $7,500.00 $115.00 $5,750.00 $100.00 $5,000.00 $28.00 $1,400.00
34 Handicap ramp with red dye squares 100 SY $225.20 $22,520.00 $150.00 $15,000.00 $150.00 $15,000.00 $120.00 $12,000.00 $70.00 $7,000.00 $54.00 $5,400.00
35 Handicap ramp with Detectable Warning Surface, Truncated Dome per attached specifications 250 SY $250.41 $62,602.50 $140.00 $35,000.00 $150.00 $37,500.00 $74.00 $18,500.00 $125.00 $31,250.00 $80.00 $20,000.00
36 Handicap ramp with Detectable Warning Surface, screw in type for concrete or asphalt surfaces 30 EA $250.41 $7,512.30 $1,500.00 $45,000.00 $150.00 $4,500.00 $3,500.00 $105,000.00 $125.00 $3,750.00 $80.00 $2,400.00
37 Sod replacement 100 SF $30.00 $3,000.00 $3.00 $300.00 $3.00 $300.00 $12.00 $1,200.00 $3.00 $300.00 $1.80 $180.00
Peach State Construction Co., LLC
(OC)
Ohmshiv Construction, LLC (L)
DAF Concrete, Inc.
(OC)
The Dickerson Group, Inc.
(L)
Multiplex, LLC (L)
APPROX.
QTY
9 Yards Infrastructure, LLC
(OC)
km
BID TABULATION PAGE 2 of 3
Construction and/or Replacement of Concrete Curbs, Gutters, Basin Lids, and Sidewalks on an Annual Contract Department of Transportation
ITEM # DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Peach State Construction Co., LLC
(OC)
Ohmshiv Construction, LLC (L)
DAF Concrete, Inc.
(OC)
The Dickerson Group, Inc.
(L)
Multiplex, LLC (L)
APPROX.
QTY
9 Yards Infrastructure, LLC
(OC)
38 Integral concrete median 6" high; GA DOT 9032B, with dowels & type 2 face 100 SY $141.91 $14,191.00 $25.00 $2,500.00 $90.00 $9,000.00 $80.00 $8,000.00 $30.00 $3,000.00 $80.00 $8,000.00
39 Concrete structures poured in place 50 CY $1,813.81 $90,690.50 $800.00 $40,000.00 $800.00 $40,000.00 $1,500.00 $75,000.00 $750.00 $37,500.00 $380.00 $19,000.00
40 Paved ditches 4" reinforced 50 SY $215.70 $10,785.00 $50.00 $2,500.00 $60.00 $3,000.00 $56.00 $2,800.00 $50.00 $2,500.00 $40.00 $2,000.00
41 Concrete Curb and Gutter 6" x 18" x 12" high back -Under 50 ft. 500 LF $115.74 $57,870.00 $25.00 $12,500.00 $40.00 $20,000.00 $22.00 $11,000.00 $15.00 $7,500.00 $47.00 $23,500.00
42 4 ft. x 4 ft. per vertical foot Masonry junction box 5 EA $3,240.00 $16,200.00 $300.00 $1,500.00 $200.00 $1,000.00 $1,500.00 $7,500.00 $750.00 $3,750.00 $550.00 $2,750.00
43 6 ft x 6 ft per vertical foot Masonry junction box 5 EA $4,740.00 $23,700.00 $300.00 $1,500.00 $300.00 $1,500.00 $1,950.00 $9,750.00 $750.00 $3,750.00 $700.00 $3,500.00
44 Detectable Warning Surface, screw in type for concrete or asphalt surfaces 30 EA $590.25 $17,707.50 $400.00 $12,000.00 $500.00 $15,000.00 $400.00 $12,000.00 $150.00 $4,500.00 $150.00 $4,500.00
45 Foreman 50 HOURS $89.40 $4,470.00 $30.00 $1,500.00 $75.00 $3,750.00 $110.00 $5,500.00 $75.00 $3,750.00 $58.00 $2,900.00
46 Laborer 50 HOURS $36.00 $1,800.00 $25.00 $1,250.00 $50.00 $2,500.00 $55.00 $2,750.00 $50.00 $2,500.00 $48.00 $2,400.00
47 Truck driver 50 HOURS $48.00 $2,400.00 $40.00 $2,000.00 $65.00 $3,250.00 $65.00 $3,250.00 $50.00 $2,500.00 $55.00 $2,750.00
48 Finisher 50 HOURS $45.00 $2,250.00 $20.00 $1,000.00 $75.00 $3,750.00 $75.00 $3,750.00 $50.00 $2,500.00 $50.00 $2,500.00
49 Additional depth greater than 2' for sidewalk grading 500 LF $158.58 $79,290.00 $5.00 $2,500.00 $20.00 $10,000.00 $15.00 $7,500.00 $20.00 $10,000.00 $35.00 $17,500.00
Install complete 18" RCP Pipe including stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep)
100 LF $277.08 $27,708.00 $180.00 $18,000.00 $180.00 $18,000.00 $115.00 $11,500.00 $100.00 $10,000.00 $230.00 $23,000.00
51 Additional depth for 18" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $590.09 $59,009.00 $20.00 $2,000.00 $90.00 $9,000.00 $100.00 $10,000.00 $120.00 $12,000.00 $165.00 $16,500.00
52 Install complete 18" HDPE pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep) 100 LF $186.69 $18,669.00 $150.00 $15,000.00 $90.00 $9,000.00 $100.00 $10,000.00 $88.00 $8,800.00 $140.00 $14,000.00
53 Additional depth 18" HDPE pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $290.14 $29,014.00 $30.00 $3,000.00 $45.00 $4,500.00 $50.00 $5,000.00 $120.00 $12,000.00 $165.00 $16,500.00
54 Install complete 24" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep) 100 LF $308.65 $30,865.00 $200.00 $20,000.00 $220.00 $22,000.00 $120.00 $12,000.00 $165.00 $16,500.00 $265.00 $26,500.00
55 Additional depth 24" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $617.45 $61,745.00 $30.00 $3,000.00 $110.00 $11,000.00 $50.00 $5,000.00 $120.00 $12,000.00 $185.00 $18,500.00
56 Install complete 24" HDPE pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep) 100 LF $214.24 $21,424.00 $160.00 $16,000.00 $120.00 $12,000.00 $115.00 $11,500.00 $125.00 $12,500.00 $160.00 $16,000.00
57 Additional depth 24" HDPE pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $307.69 $30,769.00 $30.00 $3,000.00 $80.00 $8,000.00 $50.00 $5,000.00 $120.00 $12,000.00 $185.00 $18,500.00
58 Install complete 30" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep) 100 LF $392.41 $39,241.00 $240.00 $24,000.00 $300.00 $30,000.00 $165.00 $16,500.00 $220.00 $22,000.00 $400.00 $40,000.00
59 Additional depth for 30" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $640.56 $64,056.00 $30.00 $3,000.00 $150.00 $15,000.00 $50.00 $5,000.00 $120.00 $12,000.00 $210.00 $21,000.00
Install complete 30" HDPE pipe incl stone bedding, stone backfill up to to spring elevation, shoring & including all tie-ins (0' to 8' deep)
100 LF $287.66 $28,766.00 $230.00 $23,000.00 $150.00 $15,000.00 $145.00 $14,500.00 $195.00 $19,500.00 $185.00 $18,500.00
61 Additional depth 30" HDPE incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $476.52 $47,652.00 $30.00 $3,000.00 $80.00 $8,000.00 $50.00 $5,000.00 $120.00 $12,000.00 $210.00 $21,000.00
62 Install complete 42" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep) 100 LF $490.98 $49,098.00 $320.00 $32,000.00 $420.00 $42,000.00 $250.00 $25,000.00 $365.00 $36,500.00 $525.00 $52,500.00
63 Additional depth for 42" RCP pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $646.98 $64,698.00 $30.00 $3,000.00 $210.00 $21,000.00 $85.00 $8,500.00 $150.00 $15,000.00 $285.00 $28,500.00
64 Install complete 42" HDPE pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins (0' to 8' deep) 100 LF $378.80 $37,880.00 $290.00 $29,000.00 $200.00 $20,000.00 $245.00 $24,500.00 $275.00 $27,500.00 $260.00 $26,000.00
65 Additional depth 42" HDPE pipe incl stone bedding, stone backfill up to spring elevation, shoring & including all tie-ins 100 LF $485.51 $48,551.00 $40.00 $4,000.00 $100.00 $10,000.00 $85.00 $8,500.00 $150.00 $15,000.00 $285.00 $28,500.00
66 Construct complete all included-18" flared end section precast concrete 5 EA $4,596.60 $22,983.00 $2,400.00 $12,000.00 $3,600.00 $18,000.00 $2,500.00 $12,500.00 $1,500.00 $7,500.00 $2,300.00 $11,500.00 km
BID TABULATION PAGE 3 of 3
Construction and/or Replacement of Concrete Curbs, Gutters, Basin Lids, and Sidewalks on an Annual Contract Department of Transportation
ITEM # DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Peach State Construction Co., LLC
(OC)
Ohmshiv Construction, LLC (L)
DAF Concrete, Inc.
(OC)
The Dickerson Group, Inc.
(L)
Multiplex, LLC (L)
APPROX.
QTY
9 Yards Infrastructure, LLC
(OC)
67 Construct complete all included-24" flared end section precast concrete 5 EA $4,853.40 $24,267.00 $2,500.00 $12,500.00 $4,800.00 $24,000.00 $2,500.00 $12,500.00 $1,800.00 $9,000.00 $2,300.00 $11,500.00
68 Construct complete all included-30" flared end section precast concrete 5 EA $6,701.00 $33,505.00 $3,000.00 $15,000.00 $6,000.00 $30,000.00 $4,000.00 $20,000.00 $2,200.00 $11,000.00 $4,500.00 $22,500.00
69 Construct complete all included-42" flared end section precast concrete 5 EA $9,129.00 $45,645.00 $3,500.00 $17,500.00 $8,400.00 $42,000.00 $4,500.00 $22,500.00 $4,000.00 $20,000.00 $6,500.00 $32,500.00
70 Construct complete all included-18" flared end section HDPE 5 EA $3,205.20 $16,026.00 $2,400.00 $12,000.00 $1,800.00 $9,000.00 $1,800.00 $9,000.00 $750.00 $3,750.00 $800.00 $4,000.00
71 Construct complete all included-24" flared end section HDPE 5 EA $3,269.40 $16,347.00 $2,500.00 $12,500.00 $2,400.00 $12,000.00 $2,300.00 $11,500.00 $1,000.00 $5,000.00 $950.00 $4,750.00
72 Construct complete all included-30" flared end section HDPE 5 EA $3,537.80 $17,689.00 $3,000.00 $15,000.00 $3,000.00 $15,000.00 $3,300.00 $16,500.00 $1,100.00 $5,500.00 $2,200.00 $11,000.00
73 Construct complete all included-42" flared end section HDPE 5 EA $4,580.20 $22,901.00 $3,500.00 $17,500.00 $4,200.00 $21,000.00 $4,100.00 $20,500.00 $2,550.00 $12,750.00 $3,000.00 $15,000.00
74 Construct complete all included-18" precast concrete headwall 2 EA $8,721.60 $17,443.20 $2,500.00 $5,000.00 $3,600.00 $7,200.00 $2,000.00 $4,000.00 $1,150.00 $2,300.00 $1,800.00 $3,600.00
75 Construct complete all included-24" precast concrete headwall 2 EA $10,092.00 $20,184.00 $3,000.00 $6,000.00 $4,800.00 $9,600.00 $2,300.00 $4,600.00 $1,450.00 $2,900.00 $1,800.00 $3,600.00
76 Construct complete all included-30" precast concrete headwall 2 EA $10,734.00 $21,468.00 $3,500.00 $7,000.00 $6,000.00 $12,000.00 $3,300.00 $6,600.00 $1,550.00 $3,100.00 $2,500.00 $5,000.00
77 Construct complete all included-42" precast concrete headwall 2 EA $11,761.20 $23,522.40 $4,500.00 $9,000.00 $8,400.00 $16,800.00 $5,100.00 $10,200.00 $2,200.00 $4,400.00 $3,500.00 $7,000.00
78 Construct complete all included - precast concrete manhole (less than 6' depth) 10 EA $12,715.20 $127,152.00 $2,500.00 $25,000.00 $6,000.00 $60,000.00 $2,600.00 $26,000.00 $3,000.00 $30,000.00 $2,250.00 $22,500.00
79 Additional depth for manhole 1 LF $1,480.28 $1,480.28 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $1,000.00 $1,000.00 $500.00 $500.00
80 Construct complete all included-precast concrete Doghouse Manhole (Less Than 6' Depth) 10 EA $12,661.20 $126,612.00 $2,000.00 $20,000.00 $6,000.00 $60,000.00 $4,250.00 $42,500.00 $4,000.00 $40,000.00 $3,500.00 $35,000.00
81 Additional depth for Doghouse Manhole 1 LF $1,480.28 $1,480.28 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $1,000.00 $1,000.00 $500.00 $500.00
82 Stone Rip Rap Type 1, complete in place (including filter fabric) 500 TON $241.93 $120,965.00 $70.00 $35,000.00 $100.00 $50,000.00 $60.00 $30,000.00 $45.00 $22,500.00 $66.50 $33,250.00
83 Stone Rip Rap Type 111, complete in place (including filter fabric) 500 TON $202.47 $101,235.00 $60.00 $30,000.00 $110.00 $55,000.00 $50.00 $25,000.00 $45.00 $22,500.00 $69.00 $34,500.00
84 Pine straw (Per bale with installation) 50 EA $36.00 $1,800.00 $15.00 $750.00 $10.00 $500.00 $5.00 $250.00 $15.00 $750.00 $15.00 $750.00
85 Tree root removal 1,000 SY $239.16 $239,160.00 $20.00 $20,000.00 $100.00 $100,000.00 $10.00 $10,000.00 $18.00 $18,000.00 $25.00 $25,000.00
Recommended Vendors:
DAF Concrete, Inc. Peach State Construction Co., LLC Attn: Antonio Sanchez Attn: John M. Woody 9160 Turner Road 7260 Williams Brothers Drive Jonesboro, GA 30236 Covington, GA 30014 Phone: 770-629-4036 Phone: 770-788-6363 daf_concrete_inc@yahoo.com john@peachstateco.com
TOTAL $5,418,743.26 $1,346,700.00 $2,307,960.00$1,354,050.00$2,238,650.00 $2,029,865.00
Will Vendor Hold Pricing Firm? Renewal Option One 5% increase 15% increase 13% increase Will Vendor Hold Pricing Firm? Renewal Option Two 5% increase 15% increase 12% increase
Will Vendor Hold Pricing Firm? Renewal Option Three 5% increase 15% increase 11% increase Will Vendor Hold Pricing Firm? Renewal Option Four 5% increase 15% increase 10% increase
5% increase 3% increase 10% increase 5% increase 3% increase 10% increase 5% increase 3% increase 10% increase 5% increase 3% increase 10% increase km mailto:daf_concrete_inc@yahoo.com mailto:john@peachstateco.com