BL132_25 Award Notice.pdf

PDF 386 KB Posted

Attached to
BL132-25, Traffic Signal and Intelligent Transportation System (ITS) Demand Services on an Annual Co
Solicitation number
PE-77023-NONST-2026-000000433
Issued by
Gwinnett County, Georgia

About this file

This is an Award Notice and Bid Tabulation document from Gwinnett County, Georgia's Department of Transportation for contract BL132-25, Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract. The solicitation, issued on November 10, 2025, encompasses five major service sections: pole installation, detector loop and buried cable installation, traffic signal maintenance, traffic signal information services, and ATMS (Adaptive Traffic Management System) installation, maintenance, and repair. The contract includes numerous line items across these sections with specified quantities, ranging from pole and foundation installations to equipment rental hours, labor services, materials, and emergency response surcharges. The contract was awarded to five vendors: Lumin8 Transportation Technologies, LLC; North Cherokee Electrical, Inc.; Over and Under General Contractor, Inc.; Reedwick, LLC; and The Comtran Group, Inc., in a combined total award amount of $11,500,000.00.

The bid tabulation reflects competitive pricing across multiple service categories, with different vendors offering varied unit and total prices for identical line items. Award recipients represent a mix of lead and open competition designations, with each vendor holding pricing firm at specified percentage increases (ranging from 2 to 15 percent) for renewal options spanning multiple years. The contract structure allows for demand-based services with state emergency response time requirements not to exceed two hours for certain work categories. Renewal options include four consecutive periods with vendor-specified price increase percentages, providing Gwinnett County with flexibility to extend services beyond the initial contract term while maintaining cost control mechanisms.

View the file

Other files

File Type Posted
BL132_25 AD 4.pdf PDF
BL132_25 AD 6.pdf PDF
BL132_25 AD 1.pdf PDF
BL132_25 AD 5.pdf PDF
BL132_25 AD 2.pdf PDF
BL132_25 AD 3.pdf PDF
BL132_25 inv.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 9, 2025

AWARD NOTICE

BL132-25

Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract

Pursuant to the bids received on November 10, 2025 for BL132-25, Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract, the bid has been awarded to Lumin8 Transportation Technologies, LLC; North Cherokee Electrical, Inc.; Over and Under General Contractor, Inc.; Reedwick, LLC; and The Comtran Group, Inc. in the total amount of $11,500,000.00. Please note the enclosed bid tabulation.

We appreciate your bid and interest in Gwinnett County.

Sincerely, Michael Milstein Purchasing Associate II

MM/km

Enclosure

BID TABULATION Page 1 of 4

Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract Department of Transportation

Item # Description Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

1.1 Install timber pole 8 EA $5,500.00 $44,000.00 $720.00 $5,760.00 $792.00 $6,336.00 $1,483.38 $11,867.04 $1,250.00 $10,000.00 N/B N/B

1.2 Install & provide guy anchor 16 EA $2,000.00 $32,000.00 $584.00 $9,344.00 $337.00 $5,392.00 $851.23 $13,619.68 $850.00 $13,600.00 N/B N/B

1.3 Remove timber pole 8 EA $2,000.00 $16,000.00 $386.00 $3,088.00 $889.00 $7,112.00 $915.73 $7,325.84 $700.00 $5,600.00 N/B N/B

1.4 Install basic anchor base pole foundation 6 EA $12,000.00 $72,000.00 $4,700.00 $28,200.00 $2,412.00 $14,472.00 $2,915.23 $17,491.38 $4,500.00 $27,000.00 N/B N/B

1.5 Adder per foot additional foundation depth 10 EA $1,000.00 $10,000.00 $258.00 $2,580.00 $190.00 $1,900.00 $715.73 $7,157.30 $300.00 $3,000.00 N/B N/B

1.6 Install pole shaft or mast arm pole on anchor base

foundation 8 EA $5,000.00 $40,000.00 $850.00 $6,800.00 $812.00 $6,496.00 $1,315.73 $10,525.84 $2,875.00 $23,000.00 N/B N/B

1.7 Install reinforced concrete backfill embedded pole 12 EA $5,000.00 $60,000.00 $1,938.00 $23,256.00 $2,825.00 $33,900.00 $5,315.73 $63,788.76 $5,100.00 $61,200.00 N/B N/B

1.8 Remove anchor base pole shaft or mast arm pole 4 EA $2,500.00 $10,000.00 $600.00 $2,400.00 $569.00 $2,276.00 $945.73 $3,782.92 $2,200.00 $8,800.00 N/B N/B

1.9 Remove mast arm 4 EA $2,500.00 $10,000.00 $457.00 $1,828.00 $574.00 $2,296.00 $965.73 $3,862.92 $2,200.00 $8,800.00 N/B N/B

1.10 Remove anchor base foundation (typically 3 ft depth) 4 EA $2,500.00 $10,000.00 $650.00 $2,600.00 $719.00 $2,876.00 $1,365.73 $5,462.92 $1,850.00 $7,400.00 N/B N/B

1.11 Install street light/screw-in foundation for pedestal pole 20 EA $1,000.00 $20,000.00 $350.00 $7,000.00 $375.00 $7,500.00 $1,391.23 $27,824.60 $850.00 $17,000.00 N/B N/B

1.12 Remove street light/screw-in foundation for pedestal pole 4 EA $1,000.00 $4,000.00 $150.00 $600.00 $180.00 $720.00 $953.48 $3,813.92 $875.00 $3,500.00 N/B N/B

1.13 Remove reinforced concrete backfill embedded pole

foundation (typically 3 ft depth) 4 EA $2,500.00 $10,000.00 $989.00 $3,956.00 $778.00 $3,112.00 $2,166.58 $8,666.32 $2,145.00 $8,580.00 N/B N/B

1.14 Remove reinforced concrete backfill embedded pole

foundation (typically 3 ft depth) 6 EA $2,500.00 $15,000.00 $550.00 $3,300.00 $778.00 $4,668.00 $1,365.73 $8,194.38 $2,145.00 $12,870.00 N/B N/B

1.15 Installation of Type 2 pull box 15 EA $700.00 $10,500.00 $267.00 $4,005.00 $230.00 $3,450.00 $841.23 $12,618.45 $650.00 $9,750.00 N/B N/B

1.16 Installation of Type 3 pull box 8 EA $1,000.00 $8,000.00 $349.00 $2,792.00 $255.00 $2,040.00 $941.48 $7,531.84 $850.00 $6,800.00 N/B N/B

1.17 Installation of Type 4 pull box 8 EA $1,500.00 $12,000.00 $668.00 $5,344.00 $748.00 $5,984.00 $1,066.23 $8,529.84 $2,250.00 $18,000.00 N/B N/B

1.18 Installation of Type 5 pull box 8 EA $2,000.00 $16,000.00 $880.00 $7,040.00 $1,025.00 $8,200.00 $1,616.23 $12,929.84 $3,125.00 $25,000.00 N/B N/B

1.19 Installation of Type 5S pull box 8 EA $2,000.00 $16,000.00 $670.00 $5,360.00 $1,025.00 $8,200.00 $2,716.23 $21,729.84 $2,876.00 $23,008.00 N/B N/B

1.20 Installation of Type 6 pull box 8 EA $2,000.00 $16,000.00 $660.00 $5,280.00 $1,025.00 $8,200.00 $1,916.23 $15,329.84 $2,250.00 $18,000.00 N/B N/B

1.21 Installation of Type 7 pull box 8 EA $2,000.00 $16,000.00 $965.00 $7,720.00 $1,025.00 $8,200.00 $2,666.23 $21,329.84 $3,125.00 $25,000.00 N/B N/B

1.22 Installation of traffic signal cabinet preformed base 5 EA $2,500.00 $12,500.00 $1,045.00 $5,225.00 $1,022.00 $5,110.00 $1,715.73 $8,578.65 $3,875.00 $19,375.00 N/B N/B

1.23 Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price

a. Aerial Bucket Truck 20 Hours $275.00 $5,500.00 $25.00 $500.00 $37.96 $759.20 $43.00 $860.00 $85.00 $1,700.00 N/B N/B

b. Pickup Truck 832 Hours $100.00 $83,200.00 $17.00 $14,144.00 $12.96 $10,782.72 $14.25 $11,856.00 $45.00 $37,440.00 N/B N/B

c. Mini Excavator 24 Hours $100.00 $2,400.00 $30.00 $720.00 $35.58 $853.92 $42.00 $1,008.00 $75.00 $1,800.00 N/B N/B

d. Utility Trailer 24 Hours $100.00 $2,400.00 $4.00 $96.00 $7.99 $191.76 $6.50 $156.00 $35.00 $840.00 N/B N/B

e. Pole Trailer 416 Hours $100.00 $41,600.00 $4.00 $1,664.00 $7.51 $3,124.16 $7.50 $3,120.00 $35.00 $14,560.00 N/B N/B

f. Backhoe 24 Hours $100.00 $2,400.00 $37.00 $888.00 $46.00 $1,104.00 $55.23 $1,325.52 $75.00 $1,800.00 N/B N/B

g. Air Compressor 24 Hours $100.00 $2,400.00 $11.00 $264.00 $13.59 $326.16 $20.50 $492.00 $35.00 $840.00 N/B N/B

h. Loop Trailer 36 Hours $100.00 $3,600.00 $4.00 $144.00 $12.00 $432.00 $26.50 $954.00 $35.00 $1,260.00 N/B N/B i Concrete Saw 36 Hours $100.00 $3,600.00 $13.00 $468.00 $26.15 $941.40 $29.49 $1,061.64 $100.00 $3,600.00 N/B N/B

j. Boring Machine 36 Hours $300.00 $10,800.00 $295.00 $10,620.00 $240.00 $8,640.00 $70.50 $2,538.00 $425.00 $15,300.00 N/B N/B

k. Digger/Derrick Truck 832 Hours $350.00 $291,200.00 $41.00 $34,112.00 $40.35 $33,571.20 $47.00 $39,104.00 $225.00 $187,200.00 N/B N/B

l. Crane 416 Hours $350.00 $145,600.00 $405.00 $168,480.00 $225.00 $93,600.00 $425.00 $176,800.00 $385.00 $160,160.00 N/B N/B

m. Message Board 832 Hours $100.00 $83,200.00 $19.00 $15,808.00 $12.00 $9,984.00 $23.50 $19,552.00 $25.00 $20,800.00 N/B N/B

n. Dump Truck 416 Hours $350.00 $145,600.00 $61.00 $25,376.00 $24.33 $10,121.28 $30.50 $12,688.00 $65.00 $27,040.00 N/B N/B

o. Uniloader 416 Hours $250.00 $104,000.00 $30.00 $12,480.00 $35.00 $14,560.00 $42.50 $17,680.00 $85.00 $35,360.00 N/B N/B

p. Utility Service Truck 832 Hours $125.00 $104,000.00 $24.00 $19,968.00 $20.99 $17,463.68 $15.25 $12,688.00 $45.00 $37,440.00 N/B N/B

q. Dump Trailer 416 Hours $125.00 $52,000.00 $15.00 $6,240.00 $11.75 $4,888.00 $13.50 $5,616.00 $35.00 $14,560.00 N/B N/B

1.24

a. Foreman 832 Hours $150.00 $124,800.00 $61.00 $50,752.00 $59.00 $49,088.00 $74.04 $61,601.28 $60.00 $49,920.00 N/B N/B

b. Electrician 1,664 Hours $125.00 $208,000.00 $92.00 $153,088.00 $42.00 $69,888.00 $49.22 $81,902.08 $51.00 $84,864.00 N/B N/B

c. Electrician's Helper 1,664 Hours $100.00 $166,400.00 $39.00 $64,896.00 $32.00 $53,248.00 $43.05 $71,635.20 $42.00 $69,888.00 N/B N/B

d. Equipment Operator 832 Hours $125.00 $104,000.00 $52.00 $43,264.00 $42.00 $34,944.00 $56.41 $46,933.12 $48.00 $39,936.00 N/B N/B

1.25 State Percentage Markup Above Cost For Materials (Not to Exceed 7%) 7% $5,350.00 7% $5,350.00 7% $5,350.00 7% $5,350.00 7% $5,350.00 N/B N/B

1.26 Surcharge for Emergency Work Per Order 6 EA $2,500.00 $15,000.00 $265.00 $1,590.00 $450.00 $2,700.00 $596.08 $3,576.48 $2,500.00 $15,000.00 N/B N/B

1.27

a. 1-2" HDPE 100 LF $20.00 $2,000.00 $19.00 $1,900.00 $22.50 $2,250.00 $21.39 $2,139.00 $35.00 $3,500.00 N/B N/B

b. 2-2" HDPE 50 LF $25.00 $1,250.00 $22.00 $1,100.00 $25.00 $1,250.00 $31.32 $1,566.00 $42.00 $2,100.00 N/B N/B

c. 3-2" HDPE 600 LF $30.00 $18,000.00 $27.00 $16,200.00 $32.75 $19,650.00 $48.50 $29,100.00 $49.00 $29,400.00 N/B N/B

d. 4-2" HDPE 100 LF $40.00 $4,000.00 $30.00 $3,000.00 $42.00 $4,200.00 $65.00 $6,500.00 $52.00 $5,200.00 N/B N/B

1.28

a. Minimum 4 Hours 100 EA $1,000.00 $100,000.00 $540.00 $54,000.00 $475.00 $47,500.00 $550.85 $55,085.00 $1,200.00 $120,000.00 N/B N/B

b. Each Additional Hour 24 Hours $250.00 $6,000.00 $169.00 $4,056.00 $120.00 $2,880.00 $128.67 $3,088.08 $300.00 $7,200.00 N/B N/B

1.29 State Hourly Rate for Blasting When Required 4 Hours $2,000.00 $8,000.00 $860.00 $3,440.00 $1,000.00 $4,000.00 $800.00 $3,200.00 $5,500.00 $22,000.00 N/B N/B

1.30 Surcharge for Emergency Work Per Order 4 EA $2,500.00 $10,000.00 $675.00 $2,700.00 $450.00 $1,800.00 $596.08 $2,384.32 $2,500.00 $10,000.00 N/B N/B

$ 5,000.00

Traffic Control

Section 1 Total

State Emergency Response Time (Not to exceed 2 Hours) Directional Boring (Per Foot)(HDPE Conduit)

2 Hours2 Hours 2 Hours2 Hours 2 Hours

$1,381,341.00$658,531.48 $983,521.68$860,786.00

Reedwick, LLC

(OC)

Over and Under General Contractor, Inc.

(L)

North Cherokee Electrical, Inc.

(OC)

Lumin8 Transportation Technologies, LLC

(OC)

$2,316,300.00

D.E.T., Inc.

(L)

Approx. Qty.

State Hourly Charge For Equipment Usage Not Covered By Above Unit Prices

Section 1: Pole Installation

State Hourly Charge for Labor Not Covered By Above Unit Prices

The ComTran Group, Inc.

(L)

N/B

N/B km

BID TABULATION Page 2 of 4

Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract Department of Transportation

Item # Description Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Reedwick, LLC

(OC)

Over and Under General Contractor, Inc.

(L)

North Cherokee Electrical, Inc.

(OC)

Lumin8 Transportation Technologies, LLC

(OC)

D.E.T., Inc.

(L)

Approx. Qty.

The ComTran Group, Inc.

(L)

2.1 Install 6’ x 40’ Quadrapole loop 200 EA $3,750.00 $750,000.00 $2,100.00 $420,000.00 N/B N/B $3,352.43 $670,486.00 $3,850.00 $770,000.00 N/B N/B

2.2 Install 6’ x 20’ Quadrapole loop 10 EA $2,250.00 $22,500.00 $2,100.00 $21,000.00 N/B N/B $1,934.08 $19,340.80 $3,150.00 $31,500.00 N/B N/B

2.3 Install 6’ x 20’ Dipole loop 5 EA $2,000.00 $10,000.00 $1,950.00 $9,750.00 N/B N/B $1,847.43 $9,237.15 $2,850.00 $14,250.00 N/B N/B

2.4 Install 6’ x 6’ standard setback loop 200 EA $1,750.00 $350,000.00 $1,100.00 $220,000.00 N/B N/B $1,601.73 $320,346.00 $2,125.00 $425,000.00 N/B N/B

2.5 Adder per additional loop wire installation per foot to

termination point 2,000 EA $12.50 $25,000.00 $9.16 $18,320.00 N/B N/B $13.80 $27,600.00 $3.00 $6,000.00 N/B N/B

2.6 Loop cable in 1” PVC conduit 300 EA $15.00 $4,500.00 $9.25 $2,775.00 N/B N/B $7.25 $2,175.00 $19.50 $5,850.00 N/B N/B

2.7 Loop cable in 2” PVC conduit 100 EA $20.00 $2,000.00 $9.50 $950.00 N/B N/B $8.25 $825.00 $21.50 $2,150.00 N/B N/B

2.8 Loop cable in 2” rigid conduit 50 EA $35.00 $1,750.00 $25.15 $1,257.50 N/B N/B $10.25 $512.50 $45.00 $2,250.00 N/B N/B

2.9 Adder for hand trenching 100 EA $20.00 $2,000.00 $7.25 $725.00 N/B N/B $23.00 $2,300.00 $20.00 $2,000.00 N/B N/B

2.10 Adder for open cut installation and encasement in street 25 EA $50.00 $1,250.00 $115.50 $2,887.50 N/B N/B $625.75 $15,643.75 $250.00 $6,250.00 N/B N/B

2.11 Loop cable in bored installation of 1 - 2” rigid or HDPE conduit (include conduit) 800 EA $35.00 $28,000.00 $38.85 $31,080.00 N/B N/B $28.50 $22,800.00 $48.00 $38,400.00 N/B N/B

2.12 Loop cable in bored installation of 1 - 3” rigid or HDPE conduit (include conduit) 50 EA $50.00 $2,500.00 $52.55 $2,627.50 N/B N/B $35.00 $1,750.00 $100.00 $5,000.00 N/B N/B

2.13 Installation of Type 2 pull box 30 EA $700.00 $21,000.00 $267.00 $8,010.00 N/B N/B $841.23 $25,236.90 $650.00 $19,500.00 N/B N/B

2.14 Installation of Type 3 pull box 10 EA $1,000.00 $10,000.00 $349.00 $3,490.00 N/B N/B $941.48 $9,414.80 $850.00 $8,500.00 N/B N/B

2.15 Installation of Type 4 pull box 4 EA $2,000.00 $8,000.00 $668.00 $2,672.00 N/B N/B $1,066.23 $4,264.92 $2,250.00 $9,000.00 N/B N/B

2.16 Installation of Type 5 pull box 1 EA $2,000.00 $2,000.00 $880.00 $880.00 N/B N/B $1,616.23 $1,616.23 $3,125.00 $3,125.00 N/B N/B

2.17 Installation of Type 5S pull box 1 EA $2,000.00 $2,000.00 $670.00 $670.00 N/B N/B $2,716.23 $2,716.23 $2,875.00 $2,875.00 N/B N/B

2.18 Installation of Type 6 pull box 1 EA $2,000.00 $2,000.00 $660.00 $660.00 N/B N/B $1,916.23 $1,916.23 $2,250.00 $2,250.00 N/B N/B

2.19 Installation of Type 7 pull box 1 EA $2,000.00 $2,000.00 $873.00 $873.00 N/B N/B $2,666.23 $2,666.23 $3,125.00 $3,125.00 N/B N/B

2.20 Adder per additional loop cable installed in conduit 4,000 EA $5.00 $20,000.00 $1.84 $7,360.00 N/B N/B $1.50 $6,000.00 $5.25 $21,000.00 N/B N/B

2.21 Adder per additional 2-wire loop lead-in installed in saw cut 2,000 EA $5.00 $10,000.00 $2.03 $4,060.00 N/B N/B $1.60 $3,200.00 $4.00 $8,000.00 N/B N/B

2.22 Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price

a. Aerial Bucket Truck 8 Hours $275.00 $2,200.00 $25.00 $200.00 N/B N/B $43.00 $344.00 $150.00 $1,200.00 N/B N/B

b. Pickup Truck 1,664 Hours $100.00 $166,400.00 $17.00 $28,288.00 N/B N/B $14.25 $23,712.00 $45.00 $74,880.00 N/B N/B

c. Mini Excavator 100 Hours $100.00 $10,000.00 $30.00 $3,000.00 N/B N/B $42.00 $4,200.00 $65.00 $6,500.00 N/B N/B

d. Utility Trailer 8 Hours $100.00 $800.00 $4.00 $32.00 N/B N/B $6.50 $52.00 $35.00 $280.00 N/B N/B

e. Pole Trailer 8 Hours $100.00 $800.00 $4.00 $32.00 N/B N/B $7.50 $60.00 $35.00 $280.00 N/B N/B

f. Air Compressor 100 Hours $100.00 $10,000.00 $11.00 $1,100.00 N/B N/B $20.50 $2,050.00 $35.00 $3,500.00 N/B N/B

g. Loop Trailer 1,664 Hours $100.00 $166,400.00 $4.00 $6,656.00 N/B N/B $26.50 $44,096.00 $45.00 $74,880.00 N/B N/B

h. Concrete Saw 1,664 Hours $100.00 $166,400.00 $13.00 $21,632.00 N/B N/B $29.49 $49,071.36 $100.00 $166,400.00 N/B N/B

i. Boring Machine 100 Hours $300.00 $30,000.00 $295.00 $29,500.00 N/B N/B $70.50 $7,050.00 $450.00 $45,000.00 N/B N/B

j. Message/Arrow Board 1,664 Hours $100.00 $166,400.00 $18.90 $31,449.60 N/B N/B $23.50 $39,104.00 $15.00 $24,960.00 N/B N/B

k. Dump Truck 20 Hours $350.00 $7,000.00 $61.00 $1,220.00 N/B N/B $30.50 $610.00 $85.00 $1,700.00 N/B N/B

l. Uniloader 8 Hours $250.00 $2,000.00 $30.00 $240.00 N/B N/B $42.50 $340.00 $450.00 $3,600.00 N/B N/B

m. Utility Service Truck 1,664 Hours $100.00 $166,400.00 $24.00 $39,936.00 N/B N/B $15.25 $25,376.00 $35.00 $58,240.00 N/B N/B

n. Dump Trailer 20 Hours $100.00 $2,000.00 $15.00 $300.00 N/B N/B $13.50 $270.00 $45.00 $900.00 N/B N/B

2.23 Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price

a. Foreman 832 Hours $150.00 $124,800.00 $61.00 $50,752.00 N/B N/B $74.04 $61,601.28 $60.00 $49,920.00 N/B N/B

b. Electrician 1,664 Hours $125.00 $208,000.00 $92.00 $153,088.00 N/B N/B $49.22 $81,902.08 $51.00 $84,864.00 N/B N/B

c. Electrician's Helper 1,664 Hours $100.00 $166,400.00 $39.00 $64,896.00 N/B N/B $43.05 $71,635.20 $42.00 $69,888.00 N/B N/B

d. Equipment Operator 832 Hours $125.00 $104,000.00 $52.00 $43,264.00 N/B N/B $56.41 $46,933.12 $48.00 $39,936.00 N/B N/B

e. State Percentage Markup Above Cost For Materials (Not to Exceed 7%) 7% $5,350.00 7% $5,350.00 N/B N/B 7% $5,350.00 7% $5,350.00 N/B N/B

2.24 Surcharge for Emergency Work Per Order 4 EA $2,500.00 $10,000.00 $265.00 $1,060.00 N/B N/B $596.08 $2,384.32 $2,500.00 $10,000.00 N/B N/B

3.1 Installation of LED Traffic Signal Module provided by

Gwinnett County DOT 4,000 EA N/B N/B $39.90 $159,600.00 $42.00 $168,000.00 N/B N/B $45.00 $180,000.00 N/B N/B

3.2 Installation of LED Countdown Pedestrian Signal Module

provided by Gwinnett County DOT 600 EA N/B N/B $47.25 $28,350.00 $36.00 $21,600.00 N/B N/B $55.00 $33,000.00 N/B N/B

3.3 Traffic Signal Control Box Maintenance 750 EA N/B N/B $157.50 $118,125.00 $95.00 $71,250.00 N/B N/B $250.00 $187,500.00 N/B N/B

3.4 Battery Cabinet Maintenance 400 EA N/B N/B $94.50 $37,800.00 $38.00 $15,200.00 N/B N/B $125.00 $50,000.00 N/B N/B

3.5 Video Detection System Maintenance 100 EA N/B N/B $78.75 $7,875.00 $42.00 $4,200.00 N/B N/B $300.00 $30,000.00 N/B N/B

3.6 Radar Detection System Maintenance 200 EA N/B N/B $78.75 $15,750.00 $42.00 $8,400.00 N/B N/B $300.00 $60,000.00 N/B N/B

3.7 Install Overhead Street Name Sign 310 EA N/B N/B $178.50 $55,335.00 $175.00 $54,250.00 N/B N/B $300.00 $93,000.00 N/B N/B

3.8 Install Overhead Sign (typically 24" x 36") 310 EA N/B N/B $99.75 $30,922.50 $175.00 $54,250.00 N/B N/B $250.00 $77,500.00 N/B N/B

3.9 Replace Conflict Monitor 200 EA N/B N/B $367.50 $73,500.00 $275.00 $55,000.00 N/B N/B $650.00 $130,000.00 N/B N/B

3.10 Install In-Cabinet BBS 25 EA N/B N/B $514.50 $12,862.50 $375.00 $9,375.00 N/B N/B $1,500.00 $37,500.00 N/B N/B

3.11 Install Externally Mounted BBS 25 EA N/B N/B $498.75 $12,468.75 $400.00 $10,000.00 N/B N/B $2,000.00 $50,000.00 N/B N/B

Section 2: Detector Loop and Buried Cable Installation

Section 3: Traffic Signal Maintenance

State hourly charge for equipment usage not covered by above unit prices

$ 5,000.00

Section 2 Total $2,791,850.00 $1,242,043.10 N/B $2,108,303.00

$928,500.00

$1,616,189.10

$552,588.75 N/B$471,525.00N/B

State Hourly Charge for Labor Not Covered By Above Unit Prices

Section 3 Total

N/B

BID TABULATION Page 3 of 4

Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract Department of Transportation

Item # Description Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Reedwick, LLC

(OC)

Over and Under General Contractor, Inc.

(L)

North Cherokee Electrical, Inc.

(OC)

Lumin8 Transportation Technologies, LLC

(OC)

D.E.T., Inc.

(L)

Approx. Qty.

The ComTran Group, Inc.

(L)

4.1 Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price Hourly Rate Total Price

a. Aerial Bucket Truck 10,300 Hours $275.00 $2,832,500.00 $25.00 $257,500.00 $37.97 $391,091.00 $43.00 $442,900.00 $40.00 $412,000.00 N/B N/B

b. Pickup Truck 5,000 Hours $100.00 $500,000.00 $17.00 $85,000.00 $13.75 $68,750.00 $14.25 $71,250.00 $35.00 $175,000.00 N/B N/B

c. Mini Excavator 2,000 Hours $100.00 $200,000.00 $30.00 $60,000.00 $32.50 $65,000.00 $42.00 $84,000.00 $25.00 $50,000.00 N/B N/B

d. Utility Trailer 3,750 Hours $100.00 $375,000.00 $4.00 $15,000.00 $7.99 $29,962.50 $6.50 $24,375.00 $25.00 $93,750.00 N/B N/B

e. Pole Trailer 1,500 Hours $100.00 $150,000.00 $4.00 $6,000.00 $7.15 $10,725.00 $7.50 $11,250.00 $25.00 $37,500.00 N/B N/B

f. Backhoe 550 Hours $150.00 $82,500.00 $34.00 $18,700.00 $38.00 $20,900.00 $55.23 $30,376.50 $45.00 $24,750.00 N/B N/B

g. Air Compressor 75 Hours $100.00 $7,500.00 $11.00 $825.00 $22.00 $1,650.00 $20.50 $1,537.50 $35.00 $2,625.00 N/B N/B

h. Loop Trailer 85 Hours $125.00 $10,625.00 $4.00 $340.00 $16.50 $1,402.50 $26.50 $2,252.50 $35.00 $2,975.00 N/B N/B

i. Concrete Saw 25 Hours $150.00 $3,750.00 $13.00 $325.00 $26.12 $653.00 $29.49 $737.25 $100.00 $2,500.00 N/B N/B

j. Digger Truck/Derrick Truck/Line Truck 750 Hours $400.00 $300,000.00 $41.00 $30,750.00 $40.35 $30,262.50 $47.00 $35,250.00 $125.00 $93,750.00 N/B N/B

k. Crane 250 Hours $400.00 $100,000.00 $405.00 $101,250.00 $275.00 $68,750.00 $425.00 $106,250.00 $285.00 $71,250.00 N/B N/B

l. Message Board 6,000 Hours $100.00 $600,000.00 $18.90 $113,400.00 $12.00 $72,000.00 $23.50 $141,000.00 $10.00 $60,000.00 N/B N/B

m. Dump Truck 1,250 Hours $350.00 $437,500.00 $61.00 $76,250.00 $24.35 $30,437.50 $30.50 $38,125.00 $40.00 $50,000.00 N/B N/B

n. Uniloader 25 Hours $250.00 $6,250.00 $30.00 $750.00 $42.00 $1,050.00 $42.50 $1,062.50 $45.00 $1,125.00 N/B N/B

o. Utility Service Truck 3,500 Hours $100.00 $350,000.00 $24.00 $84,000.00 $20.99 $73,465.00 $15.00 $52,500.00 $25.00 $87,500.00 N/B N/B

p. Dump Trailer 2,000 Hours $100.00 $200,000.00 $15.00 $30,000.00 $11.75 $23,500.00 $13.50 $27,000.00 $25.00 $50,000.00 N/B N/B

4.2

a. Foreman 7,400 Hours $150.00 $1,110,000.00 $61.00 $451,400.00 $55.00 $407,000.00 $74.04 $547,896.00 $60.00 $444,000.00 N/B N/B

b. Electrician 7,800 Hours $125.00 $975,000.00 $92.00 $717,600.00 $48.00 $374,400.00 $49.22 $383,916.00 $51.00 $397,800.00 N/B N/B

c. Electrician's Helper 7,800 Hours $100.00 $780,000.00 $39.00 $304,200.00 $32.00 $249,600.00 $43.05 $335,790.00 $42.00 $327,600.00 N/B N/B

d. Equipment Operator 4,500 Hours $125.00 $562,500.00 $52.00 $234,000.00 $42.00 $189,000.00 $56.47 $254,115.00 $48.00 $216,000.00 N/B N/B

4.3 State percentage markup above cost for materials (not to

exceed 7%): 7% $42,800.00 7% $42,800.00 7% $42,800.00 7% $42,800.00 7% $42,800.00 N/B N/B

4.4 Surcharge for Emergency Work Per Order 4 EA $2,500.00 $10,000.00 $265.00 $1,060.00 $800.00 $3,200.00 $596.08 $2,384.32 $2,200.00 $8,800.00 N/B N/B

4.5

a. 1-2" HDPE 2,000 LF $20.00 $40,000.00 $19.00 $38,000.00 $20.50 $41,000.00 $21.39 $42,780.00 $35.00 $70,000.00 N/B N/B

b. 2-2" HDPE 4,500 LF $25.00 $112,500.00 $22.00 $99,000.00 $25.00 $112,500.00 $31.32 $140,940.00 $42.00 $189,000.00 N/B N/B

c. 3-2" HDPE 3,500 LF $30.00 $105,000.00 $27.00 $94,500.00 $32.75 $114,625.00 $48.50 $169,750.00 $49.00 $171,500.00 N/B N/B

d. 4-2" HDPE 1,000 LF $40.00 $40,000.00 $30.00 $30,000.00 $42.00 $42,000.00 $65.00 $65,000.00 $52.00 $52,000.00 N/B N/B

4.6

a. Minimum 4 Hours 25 EA $1,000.00 $25,000.00 $540.00 $13,500.00 $600.00 $15,000.00 $550.85 $13,771.25 $1,200.00 $30,000.00 N/B N/B

b. Each Additional Hour 2,800 Hours $250.00 $700,000.00 $159.00 $445,200.00 $115.00 $322,000.00 $128.67 $360,276.00 $60.00 $168,000.00 N/B N/B

5.1 Install CCTV System 15 EA N/B N/B $730.24 $10,953.60 $700.00 $10,500.00 N/B N/B $1,950.00 $29,250.00 $750.00 $11,250.00

5.2 Replace CCTV System 20 EA N/B N/B $730.24 $14,604.80 $650.00 $13,000.00 N/B N/B $1,500.00 $30,000.00 $650.00 $13,000.00

5.3 Maintenance of CCTV System with camera cabinet 150 EA N/B N/B $255.00 $38,250.00 $315.00 $47,250.00 N/B N/B $250.00 $37,500.00 $325.00 $48,750.00

5.4 Maintenance of CCTV System without camera cabinet 200 EA N/B N/B $105.00 $21,000.00 $155.00 $31,000.00 N/B N/B $240.00 $48,000.00 $175.00 $35,000.00

5.5 Maintenance of ATMS Hub Cabinet 35 EA N/B N/B $155.00 $5,425.00 $400.00 $14,000.00 N/B N/B $350.00 $12,250.00 $310.00 $10,850.00

5.6 Furnish and Install Fiber Patch Panel, Wall Mount, 12 Port 5 EA N/B N/B $849.14 $4,245.70 $675.00 $3,375.00 N/B N/B $875.00 $4,375.00 $750.00 $3,750.00

5.7 Furnish and Install Fiber Interconnect Cable, 12 Fiber 500 EA N/B N/B $26.80 $13,400.00 $42.75 $21,375.00 N/B N/B $35.00 $17,500.00 $35.00 $17,500.00

5.8 Fusion Splice 15 LF N/B N/B $155.00 $2,325.00 $300.00 $4,500.00 N/B N/B $1,200.00 $18,000.00 $250.00 $3,750.00

5.9 Mobilization for Fusion Splicing 15 LF N/B N/B $155.00 $2,325.00 $375.00 $5,625.00 N/B N/B $1,600.00 $24,000.00 $350.00 $5,250.00

5.10 Furnish and Install Tracer Wire 3,000 LF N/B N/B $1.48 $4,440.00 $0.98 $2,940.00 N/B N/B $2.25 $6,750.00 $0.75 $2,250.00

5.11 Mobilization for Tracer Wire Installation 5 EA N/B N/B $155.00 $775.00 $250.00 $1,250.00 N/B N/B $850.00 $4,250.00 $250.00 $1,250.00

5.12 Furnish and Install Pull Box, PB-7 (Split Lid) 8 EA N/B N/B $3,115.81 $24,926.48 $2,900.00 $23,200.00 N/B N/B $3,125.00 $25,000.00 $2,560.00 $20,480.00

5.13 Furnish and Install 2” Rigid Riser 100 LF N/B N/B $22.87 $2,287.00 $28.25 $2,825.00 N/B N/B $38.00 $3,800.00 $35.00 $3,500.00

5.14 Directional Bore, 1- 2” HPDE 150 LF N/B N/B $19.00 $2,850.00 $20.50 $3,075.00 N/B N/B $30.00 $4,500.00 $21.00 $3,150.00

5.15 Directional Bore, 2- 2” HPDE 3,000 LF N/B N/B $22.00 $66,000.00 $26.00 $78,000.00 N/B N/B $35.00 $105,000.00 $30.00 $90,000.00

5.16 Directional Bore, 3- 1 ¼ ” HPDE 1,000 LF N/B N/B $27.00 $27,000.00 $35.00 $35,000.00 N/B N/B $35.00 $35,000.00 $23.00 $23,000.00

5.17 Furnish and Install UNDERGROUND

OSP Fiber Optic Cable, Drop, SM, 12 Fiber 500 LF N/B N/B $1.38 $690.00 $1.58 $790.00 N/B N/B $1.35 $675.00 $1.50 $750.00

5.18 Furnish and Install UNDERGROUND

OSP Fiber Optic Cable, Loose Tube, SM, 24 or 48 Fiber 4,000 LF N/B N/B $1.45 $5,800.00 $1.78 $7,120.00 N/B N/B $1.85 $7,400.00 $1.80 $7,200.00

5.19 Furnish and Install UNDERGROUND

OSP Fiber Optic Cable, Loose Tube, SM, 72 or 96 Fiber 2,000 LF N/B N/B $1.89 $3,780.00 $2.38 $4,760.00 N/B N/B $2.25 $4,500.00 $2.40 $4,800.00

5.20 Furnish and Install UNDERGROUND

OSP Fiber Optic Cable, Loose Tube, SM, 144 Fiber 1,000 LF N/B N/B $3.04 $3,040.00 $3.15 $3,150.00 N/B N/B $3.10 $3,100.00 $3.25 $3,250.00

5.21 Furnish and Install UNDERGROUND

OSP Fiber Optic Cable, Loose Tube, SM, 288 Fiber 1,000 LF N/B N/B $4.53 $4,530.00 $4.45 $4,450.00 N/B N/B $3.75 $3,750.00 $4.50 $4,500.00

5.22 Furnish and Install AERIAL

OSP Fiber Optic Cable, Drop, SM, 12 Fiber 500 LF N/B N/B $1.68 $840.00 $2.35 $1,175.00 N/B N/B $1.75 $875.00 $2.00 $1,000.00

Section 4: Traffic Signal Information

Section 5: ATMS Installation, Maintenance and Repair

$ 40,000.00

State Emergency Response Time (Not to exceed 2 Hours)

$3,351,350.00

2 Hours

$3,332,225.00$3,429,284.82

2 Hours

$10,658,425.00

2 Hours 2 Hours

$2,802,724.00

State hourly charge for equipment usage not covered by above unit prices

State Hourly Charge for Labor Not Covered By Above Unit Prices

Directional Boring (Per Foot)(HDPE Conduit)

Section 4 Total

Traffic Control

BID TABULATION Page 4 of 4

Traffic Signal and Intelligent Transportation System Demand Services on an Annual Contract Department of Transportation

Item # Description Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Reedwick, LLC

(OC)

Over and Under General Contractor, Inc.

(L)

North Cherokee Electrical, Inc.

(OC)

Lumin8 Transportation Technologies, LLC

(OC)

D.E.T., Inc.

(L)

Approx. Qty.

The ComTran Group, Inc.

(L)

5.23 Furnish and Install AERIAL

OSP Fiber Optic Cable, Loose Tube, SM, 24 or 48 Fiber 1,000 LF N/B N/B $3.51 $3,510.00 $2.08 $2,080.00 N/B N/B $2.25 $2,250.00 $2.30 $2,300.00

5.24 Furnish and Install AERIAL

OSP Fiber Optic Cable, Loose Tube, SM, 72 or 96 Fiber 3,000 LF N/B N/B $3.95 $11,850.00 $3.55 $10,650.00 N/B N/B $2.85 $8,550.00 $2.85 $8,550.00

5.25 Furnish and Install AERIAL

OSP Fiber Optic Cable, Loose Tube, SM, 144 Fiber 500 LF N/B N/B $5.10 $2,550.00 $4.10 $2,050.00 N/B N/B $3.25 $1,625.00 $3.60 $1,800.00

5.26 Furnish and Install AERIAL

OSP Fiber Optic Cable, Loose Tube, SM, 288 Fiber 500 LF N/B N/B $6.58 $3,290.00 $5.25 $2,625.00 N/B N/B $4.25 $2,125.00 $5.00 $2,500.00

5.27 Furnish and Install UNDERGROUND Shielded CAT 6 Cable 400 LF N/B N/B $1.16 $464.00 $1.90 $760.00 N/B N/B $1.25 $500.00 $1.75 $700.00

5.28 Furnish and Install AERIAL Shielded CAT 6 Cable 400 LF N/B N/B $3.16 $1,264.00 $2.10 $840.00 N/B N/B $2.25 $900.00 $2.00 $800.00

5.29 Furnish and Install ¼” Strand 500 LF N/B N/B $2.72 $1,360.00 $4.15 $2,075.00 N/B N/B $3.50 $1,750.00 $3.50 $1,750.00

5.30 Remove Abandoned UNDGROUND Communication Cables 800 LF N/B N/B $1.25 $1,000.00 $1.78 $1,424.00 N/B N/B $1.00 $800.00 $1.50 $1,200.00

5.31 Remove Abandoned AERIAL Communication Cables 300 LF N/B N/B $1.25 $375.00 $2.25 $675.00 N/B N/B $2.00 $600.00 $2.00 $600.00 5.32

a. Minimum 4 Hours 10 EA N/B N/B $540.00 $5,400.00 $522.00 $5,220.00 N/B N/B $1,200.00 $12,000.00 $800.00 $8,000.00

b. Each Additional Hour 40 Hours N/B N/B $159.00 $6,360.00 $120.00 $4,800.00 N/B N/B $300.00 $12,000.00 $150.00 $6,000.00

5.33

a. Aerial Bucket Truck 40 Hours N/B N/B $25.00 $1,000.00 $48.00 $1,920.00 N/B N/B $75.00 $3,000.00 $95.00 $3,800.00

b. Pickup Truck 80 Hours N/B N/B $17.00 $1,360.00 $12.00 $960.00 N/B N/B $35.00 $2,800.00 $25.00 $2,000.00

c. 1-ton Truck 24 Hours N/B N/B $24.00 $576.00 $19.00 $456.00 N/B N/B $55.00 $1,320.00 $35.00 $840.00

d. Backhoe/Mini Excavator 24 Hours N/B N/B $30.00 $720.00 $48.00 $1,152.00 N/B N/B $55.00 $1,320.00 $75.00 $1,800.00

e. Air Compressor 16 Hours N/B N/B $11.00 $176.00 $24.00 $384.00 N/B N/B $35.00 $560.00 $30.00 $480.00

f. Boring Machine/Equipment 4 Hours N/B N/B $295.00 $1,180.00 $600.00 $2,400.00 N/B N/B $625.00 $2,500.00 $300.00 $1,200.00

g. Fiber Splice Trailer 16 Hours N/B N/B $26.00 $416.00 $80.00 $1,280.00 N/B N/B $85.00 $1,360.00 $65.00 $1,040.00

5.34

a. PM/Superintendent 64 Hours N/B N/B $70.00 $4,480.00 $78.00 $4,992.00 N/B N/B $63.00 $4,032.00 $95.00 $6,080.00

b. Foreman 80 Hours N/B N/B $61.00 $4,880.00 $56.00 $4,480.00 N/B N/B $60.00 $4,800.00 $75.00 $6,000.00

c. Electrician 96 Hours N/B N/B $92.00 $8,832.00 $48.00 $4,608.00 N/B N/B $51.00 $4,896.00 $75.00 $7,200.00

d. Laborer 120 Hours N/B N/B $39.00 $4,680.00 $32.00 $3,840.00 N/B N/B $42.00 $5,040.00 $55.00 $6,600.00

e. Lineman 80 Hours N/B N/B $52.00 $4,160.00 $65.00 $5,200.00 N/B N/B $51.00 $4,080.00 $75.00 $6,000.00

f. Fiber Splicer 64 Hours N/B N/B $61.00 $3,904.00 $58.00 $3,712.00 N/B N/B $51.00 $3,264.00 $85.00 $5,440.00

g. Equipment Operator 48 Hours N/B N/B $52.00 $2,496.00 $48.00 $2,304.00 N/B N/B $48.00 $2,304.00 $65.00 $3,120.00

5.35 Surcharge for Emergency Work Per Order 5 EA N/B N/B $265.00 $1,325.00 $800.00 $4,000.00 N/B N/B $3,500.00 $17,500.00 $350.00 $1,750.00

5.36 MATERIALS – Percentage Markup Above Cost

(Not To Exceed 10%) N/B N/B 10% $16,500.00 10% $16,500.00 N/B N/B 10% $16,500.00 10% $16,500.00

Sections One, Two,Three, Four and Five Sections One, Three, Four, and Five Sections One, Two,and Four Section Four Section Five Lumin8 Transportation Technologies, LLC North Cherokee Electrical, Inc. Over and Under General Contractor, Inc. Reedwick, LLC The Comtran Group, Inc.

Attn: Josh James Attn: Shannon Bryan Attn: Nathan Hollingsworth Attn: Dan Kelly Attn: Bryan Epperson 27 N. Fairground St. NE P.O. Box 4098 129B Hurricane Shoals Rd. 15071 Veterans Memorial Highway 5036 Bill Bowman Drive Marietta, GA 30060 Canton, GA 30114 Lawrenceville, GA 30048 Villa Rica, GA 30180 Buford, GA 30518 Phone: 770-732-0054 Phone: 770-345-2667 Phone: 770-682-9160 Phone: 404-433-5226 Phone: 770-904-4444 jjames@lumin8.com sbryan@ncelectrical.com overundercontractor@gmail.com dankelly@reedwick.com bryanepperson@comtrangroup.com

State hourly charge for equipment usage not covered by above unit prices

Traffic Control

2 Hours

$2,316,300.00

$2,791,850.00

N/B

$10,658,425.00

N/B

$860,786.00 $983,521.68

$4,342,527.48

$1,616,189.10

N/B

$3,429,284.82

N/B

$1,381,341.00$658,531.48

N/B

Section 1-5 Bid Total

State Hourly Charge for Labor Not Covered By Above Unit Prices

$15,766,575.00 $6,360,363.43

$1,242,043.10

$552,588.75

$3,351,350.00

$353,595.58

Section 1 Total

5% increase

$6,028,995.60 $8,294,220.00

$2,108,303.00

$928,500.00

$3,332,225.00

$543,851.00

N/B

4% increase

5% increase

5% increase

2% increase

2% increase

5% increase

5% increase

$543,851.00

15% increase

15% increase

State Emergency Response Time (Not to exceed 2 Hours)

$ 15,000.00

Section 5 Total N/B $353,595.58 $409,747.00 N/B

Recommended Vendors:

Will Vendor Hold Pricing Firm? Renewal Option One

Will Vendor Hold Pricing Firm? Renewal Option Two

Will Vendor Hold Pricing Firm? Renewal Option Three

Will Vendor Hold Pricing Firm? Renewal Option Four

15% increase

15% increase

5% increase

5% increase

Section 2 Total

Section 3 Total

Section 4 Total

Section 5 Total

$471,525.00

$2,802,724.00

$409,747.00

5% increase

5% increase

5% increase

5% increase

5% increase

3% increase

N/B 2 Hours 2 Hours

$418,280.00

2 Hours

2% increase

N/B

N/B

N/B

N/B

$418,280.00

$418,280.00

2% increase

2% increase

2% increase km mailto:jjames@lumin8.com mailto:jwilkerson@ncelectrical.com mailto:overundercontractor@gmail.com mailto:dankelly@reedwick.com mailto:bryanepperson@comtrangroup.com

BL132-25 Lumin Award.pdf
BL132-25 Tab.pdf
Tabulation

File details come from the government source that posted it. Updated .