This is an Addendum No. 3 to contract BL132-25 for Traffic Signal and Intelligent Transportation System (ITS) Demand Services on an Annual Contract, issued October 21, 2025. The addendum provides revisions to Section 4 regarding Traffic Signal Installation, including updated hourly rate allocations for equipment and labor. Equipment categories specified include aerial bucket trucks (275 hours), pickup trucks (125 hours), utility trailers (300 hours), digger/derrick trucks (60 hours), cranes (20 hours), message boards (1,000 hours), dump trucks (80 hours), backhoes (80 hours), loop trailers (40 hours), and utility service trucks (200 hours), among others. Labor categories include foremen (275 hours), electricians (350 hours), electricians' helpers (350 hours), and equipment operators (150 hours). The contract specifies emergency response time requirements not to exceed 2 hours and includes provisions for directional boring services using HDPE conduit and traffic control with a minimum of 4 hours and additional hourly charges.
The pricing structure indicates a state percentage markup above cost for materials not to exceed 7 percent, with specific hourly rates established for various service categories. The addendum reflects a revision designated as R1, specifically changing the labor category designation from 5-34 Equipment Operator to 5-35 Equipment Operator. Additional pricing details for emergency surcharges, directional boring per-foot rates, and traffic control costs are referenced but specific dollar amounts are not provided in this addendum document. The contract operates on an annual basis with demand service provisions, allowing for flexible utilization of equipment and labor resources as needed throughout the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL132_25 AD 4.pdf | ||
| BL132_25 AD 6.pdf | ||
| BL132_25 AD 1.pdf | ||
| BL132_25 AD 5.pdf | ||
| BL132_25 AD 2.pdf | ||
| BL132_25 Award Notice.pdf | ||
| BL132_25 inv.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 21, 2025
Addendum No. 3
BL132-25
Traffic Signal and Intelligent Transportation System (ITS) Demand Services on an Annual Contract
Revision:
R1. 5-34 Equipment Operator is being changed to 5-35 Equipment Operator.
Section 4 - Traffic Signal Installation
Sample Project Hourly Rates for Section 4.
a. Aerial Bucket Truck 275 Hours k. Boring Machine
b. Pickup Truck 125 Hours l. Digger/Derrick Truck 60 Hours
c. Line Truck m. Crane 20 Hours
d. Mini Excavator n. Auger/Boom Truck
e. Utility Trailer 300 Hours o. Message Board 1,000 Hours
f. Pole Trailer p. Dump Truck 80 Hours
g. Backhoe 80 Hours q. Uniloader
h. Air compressor r. Utility Service Truck 200 Hours
i. Loop Trailer 40 Hours s. Dump Trailer 30 Hours
j. Concrete Saw t. Other 4-2.
a. Foreman 275 Hours d. Equipment Operator 150 Hours
b. Electrician 350 Hours e. Other
c. Electrician’s helper 350 Hours
State percentage markup above cost for materials
(not to exceed 7%): N/A Please estimate your emergency response time not to exceed 2 hours N/A
4-3 Surcharge for emergency work per order N/A 4-4. Directional Boring (per foot) (HDPE conduit)
a. 1 - 2” HDPE b. 2 - 2” HDPE c. 3 - 2” HDPE
d. 4 - 2” 4-5. Traffic Control
a. Minimum 4 Hours 1 Hour d. Each additional hour 130 Hours
Thank you, Michael Milstein Purchasing Associate II