About this file
This Addendum No. 4 is issued by Gwinnett County for solicitation BL132-25, concerning Traffic Signal and Intelligent Transportation System (ITS) Demand Services on an Annual Contract. The addendum updates the Section 5 Bid Schedule with revised line items for Automated Traffic Management System (ATMS) installation, maintenance, and repair services. Section 5 encompasses 36 bid items covering CCTV system installation and maintenance, fiber optic cable furnishing and installation (both underground and aerial), equipment mobilization, directional boring, traffic control services, and hourly labor and equipment charges. Approximate annual quantities range from 3 units for Pull Box installations to 4,000 linear feet for certain fiber optic cable types. The bid submission deadline is October 29, 2025, at 2:50 PM. The contract is scheduled to commence January 1, 2026, or upon award, with an initial firm pricing term and four additional optional years for which prices may be adjusted according to bidder-specified increase or decrease percentages.
Gwinnett County requires all bid pricing to remain firm throughout the initial contract term, with non-responsive bid declarations issued for failure to maintain firm pricing. Bidders must complete unit price and total price columns for all Section 5 items, though Section 4 totals will be calculated by the County using previously published hours. The bid schedule includes hourly rate categories for equipment (aerial bucket trucks, pickup trucks, various specialized equipment) and labor (project managers, foremen, electricians, laborers, linemen, fiber splicers, and equipment operators), with specified approximate annual hours for each category. Bidders may propose materials markup not to exceed 10% and emergency work surcharges. The document provides space for bidders to specify percentage increase or decrease options for the four renewal periods, with accompanying explanations required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL132_25 AD 6.pdf | ||
| BL132_25 AD 1.pdf | ||
| BL132_25 AD 5.pdf | ||
| BL132_25 AD 2.pdf | ||
| BL132_25 Award Notice.pdf | ||
| BL132_25 AD 3.pdf | ||
| BL132_25 inv.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 24, 2025
Addendum No. 4
BL132-25
Traffic Signal and Intelligent Transportation System (ITS) Demand Services on an Annual Contract
The due date for all bid submissions is October 29, 2025 at 2:50 PM.
Clarification
C1. The hours for section 4 that were published in Addendum #3 will be used to figure out which contractor had the low bid for section 4. You are not required to fill out the section 4 total. That will be calculated by the County using the hours listed below.
C2. Updated Section 5 Bid Schedule. Change highlighted.
Section 5 - ATMS Installation, Maintenance and Repair
SECTION 5 BID SCHEDULE (10/24/25)
ITEM #
APPROX.
ANNUAL
QTY
DESCRIPTION UNIT PRICE TOTAL
PRICE
5-1 15 EA Install CCTV System $ $
5-2 20 EA Replace CCTV Camera $ $
5-3 150 EA Maintenance of CCTV System With Camera Cabinet
5-4 200 EA Maintenance of CCTV System Without Camera Cabinet
5-5 35 EA Maintenance of ATMS Hub Cabinet $ $
5-6 5 EA Furnish and Install Fiber Patch Panel, Wall Mount, 12 Port $ $
5-7 500 EA Fusion Splice $ $
5-8 15 EA Mobilization for Fusion Splice – Underground Cable
5-9 15 EA Mobilization for Fusion Splice – Existing Aerial Cable
5-10 3000 LF Furnish and Install Tracer Wire $ $
5-11 5 EA Mobilization for Tracer Wire Installation $ $
5-12 8 EA Furnish and Install Pull Box, PB-7 (Split Lid) $ $
5-13 100 LF Furnish and Install 2” Rigid Riser $ $
5-14 150 LF Directional Bore, 1- 2” HPDE $ $
5-15 3000 LF Directional Bore, 2- 2” HPDE $ $
5-16 1000 LF Directional Bore, 3- 1 ¼ ” HPDE $ $
5-17 500 LF Furnish and Install UNDERGROUND OSP Fiber Optic Cable, Drop, SM, 12 Fiber $ $
5-18 4000 LF
Furnish and Install UNDERGROUND OSP Fiber Optic Cable, Loose Tube, SM, 24 or 48 Fiber
5-19 2000 LF
Furnish and Install UNDERGROUND OSP Fiber Optic Cable, Loose Tube, SM, 72 or 96 Fiber
5-20 1000 LF
Furnish and Install UNDERGROUND OSP Fiber Optic Cable, Loose Tube, SM, 144 Fiber
5-21 1000 LF
Furnish and Install UNDERGROUND OSP Fiber Optic Cable, Loose Tube, SM, 288 Fiber
5-22 500 LF Furnish and Install AERIAL OSP Fiber Optic Cable, Drop, SM, 12 Fiber $ $
ITEM #
APPROX.
ANNUAL
QTY
DESCRIPTION UNIT PRICE TOTAL
PRICE
5-23 1000 LF
Furnish and Install AERIAL OSP Fiber Optic Cable, Loose Tube, SM, 24 or 48 Fiber
5-24 3000 LF Furnish and Install AERIAL OSP Fiber Optic Cable, Loose Tube, SM, 72 or 96 Fiber $ $
5-25 500 LF Furnish and Install AERIAL OSP Fiber Optic Cable, Loose Tube, SM, 144 Fiber $ $
5-26 500 LF Furnish and Install AERIAL OSP Fiber Optic Cable, Loose Tube, SM, 288 Fiber $ $
5-27 400 LF Furnish and Install UNDERGROUND Shielded CAT6 Cable
5-28 400 LF Furnish and Install AERIAL Shielded CAT6 Cable $ $
5-29 500 LF Furnish and Install ¼” Strand $ $
5-30 800 LF Remove Abandoned UNDERGROUND Communication Cables
5-31 300 LF Remove Abandoned AERIAL Communication Cables
For more information on Section 5 bid items 1-31, see Part J (Section 5 – ATMS/ITS Installation, Maintenance and Repair), Number 3 (Bid Schedule Item Details) of this Invitation to Bid.
ITEM # DESCRIPTION APPROX.
ANNUAL QTY
UNIT
RATE
TOTAL
PRICE
5-32. Traffic Control
5-32.a Traffic Control – Minimum 4 Hours 10 EA $ $ 5-32.b Traffic Control – Per Hour 40 HRS $ $
5-33. Hourly charge for EQUIPMENT not covered by above unit prices 5-33.a Aerial Bucket Truck 40 HRS $ $ 5-33.b Pickup Truck 80 HRS $ $ 5-33.c 1-ton Truck 24 HRS $ $ 5-33.d Backhoe / MiniEx 24 HRS $ $ 5-33.e Air compressor 16 HRS $ $ 5-33.f Boring Machine/Equipment 4 HRS $ $ 5-33.g Fiber Splice Trailer 16 HRS $ $
5-34. Hourly charge for LABOR not covered by above unit prices 5-34.a PM/Superintendent 64 HRS $ $ 5-34.b Foremen 80 HRS $ $ 5-34.c Electrician 96 HRS $ $ 5-34.d Laborer 120 HRS $ $ 5-34.e Lineman 80 HRS $ $
ITEM # DESCRIPTION APPROX.
ANNUAL QTY
UNIT
RATE
TOTAL
PRICE
5-34.f Fiber Splicer 64 HRS $ $ 5-34.g Equipment Operator 48 HRS $ $
Additional Quantities 5-35 Surcharge for Emergency work per order 5 EA $ $
N/A Estimated Emergency response time (Not to exceed 2 hours) N/A HRS N/A
5-36 MATERIALS – Percentage markup above cost (Not to exceed 10%) $ 15,000 % $
SECTION 5 TOTAL $
SECTION 1 TOTAL $
SECTION 2 TOTAL $
SECTION 3 TOTAL $
SECTION 4 TOTAL $
SECTION 5 TOTAL $
BID TOTAL
Gwinnett County requires pricing to remain firm for the duration of the initial term of the contract. Failure to hold firm pricing for the initial term of the contract will be sufficient cause for Gwinnett County to declare bid non-responsive. Contract to start January 1, 2026 or upon award.
Unless otherwise noted, bid prices will remain firm for four (4) additional years. If a percentage increase/decrease will be a part of this bid, please note this in the space provided together with an explanation.
Option 1: _______________________________________________________________________Increase / Decrease (circle one)
Option 2: ______________________________________________________________________ Increase / Decrease (circle one)
Option 3: _______________________________________________________________________Increase / Decrease (circle one)
Option 4: _______________________________________________________________________Increase / Decrease (circle one)
Company Name
Thank you, Michael Milstein Purchasing Associate II-
October 24, 2025