BL091_24 Ad5.pdf
PDF 451 KB Posted
- Solicitation number
- PE-77023-NONST-2025-000000204
- Issued by
- Gwinnett County, Georgia
About this file
This document is an addendum to an invitation for bids (IFB) issued by Gwinnett County, Georgia for HVAC System Maintenance and Repair Services. The IFB, numbered BL091-24, seeks a contractor to provide comprehensive preventative maintenance and on-call repair services for the HVAC equipment at the Gwinnett County Sheriffs Office. The addendum provides revisions to the bid schedule, including the addition of walk-in coolers/freezers and energy recovery units as line items, as well as updates to the equipment list. It also clarifies the preventative maintenance scope of work for these additional equipment types. The IFB is a one-year contract with four one-year renewal options.
The bid schedule includes hourly rates for on-call repair services during normal and after-hours, as well as percentage markups for repair parts, new HVAC equipment, and rental equipment. Bidders must provide unit prices that cannot exceed two decimal points. The determination of the lowest cost bidder will be based on the total of the hourly rate projections and percentage markups applied to estimated annual parts and equipment costs, in addition to the preventative maintenance service rates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL091_24 Ad1.pdf | ||
| BL091_24 inv.pdf | ||
| BL091_24 Ad3.pdf | ||
| BL091_24 Ad2.pdf | ||
| BL091_24 Ad6.pdf | ||
| BL091_24 Ad4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 6, 2024
ADDENDUM #5
BL091-24
HVAC System Maintenance and Repair Services
I. Questions and Answers
Q1. The walk-in coolers and freezers are on the equipment list but not on the bid sheet.
A1. Please see attached revised bid schedule; Section A, Line Item #5.
Q2. The exhaust fans are on the bid sheet but not on the equipment list and count.
A2. Please see attached revised Appendix A. There are a total of 96 exhaust fans.
Q3. Do you want the cooling tower, pumps and motors included on the chiller bid?
A3. Yes, this must be included as it is part of the HVAC system.
Q4. There is a line item for fans and blowers, but there are not any fans and blowers listed on the equipment list.
A4. The line item for fans and blowers has been removed from the revised bid schedule since they are a part of the air handler units.
Q5. Are the AHU’s considered Air Conditioning Systems or are they the fans and blowers?
A5. Please see attached revised bid schedule; Section A, Line Item #1.
II. Revisions
R1. Please remove all references to fans and blowers in the bid invitation. These are covered under the Air Handling Units.
R2. All references to Comprehensive Preventative Maintenance for Air Conditioning Systems revised to Comprehensive
Preventative Maintenance for Air Conditioning Systems and Air Handling Units (AHUs).
R2. Appendix A, Wembley Tower revised to Wimberly Tower.
R3. Bid schedule revised to include Walk-In Coolers and Freezers, Line Item #5, and Energy Recovery Units (ERUs), Line
Item #6.
R3. Page 4 of the bid invitation, 2. Preventative Maintenance Scope and Responsibilities should include:
Comprehensive Preventative Maintenance for Walk-In Freezers and Coolers Unless called for differently by the manufacturer’s instructions, the preventative maintenance program for walk-in coolers and freezers shall include the tasks listed in Revised Appendix C.
Comprehensive Preventative Maintenance for Energy Recovery Units (ERUs) Unless called for differently by the manufacturer’s instructions, the preventative maintenance program for energy recovery units shall include the tasks listed in Revised Appendix C.
This addendum should be signed in the Addendum Acknowledgement section of the Revised Bid Schedule issued in Addendum 3. Since there are only four available spots for addenda, please acknowledge in the margin. Failure to do so may result in your quote being deemed non-responsive.
Thank you, Jenny Coleman Purchasing Associate II
BL091-24 (Addendum #5) PAGE 13R
FAILURE TO RETURN THIS PAGE AS PART OF YOUR BID DOCUMENT MAY RESULT IN REJECTION.
REVISED BID SCHEDULE
ITEM
# Description Monthly Charge Annual Charge
(Monthly x 12)
Section A: Comprehensive Preventative Maintenance Services Rates Gwinnett County Detention Center
1. Comprehensive Preventative Maintenance for Air Conditioning Systems and Air Handling Units (AHUs) $ $
2. Comprehensive Preventative Maintenance for Chiller Systems $ $
3. Comprehensive Preventative Maintenance for Boiler Systems $ $
4. Comprehensive Preventative Maintenance for Building Automation Systems
(BAS) $ $
5. Comprehensive Preventative Maintenance for Walk-In Freezers and Coolers $ $
6. Comprehensive Preventative Maintenance for Energy Recovery Units (ERUs) $ $
SECTION A TOTAL $
ITEM
# Description
*Estimated Annual
Quantity **Unit Price Annual Total
Section B: Labor Rates for On-Call Repairs for HVAC Systems & Equipment, Minor HVAC System Replacement & Rental of HVAC Equipment in Emergency Situations
1 Technician – Repair during normal hours Monday – Friday, 6:00 a.m. to 4:00 p.m. 144 Hours $ $
2 Technician –Repair after hours Monday – Friday, After 4:00 PM, Weekends & Holidays 50 Hours $ $
3 Helper – Repair during normal hours Monday – Friday, 6:00 AM to 4:00 PM 290 Hours $ $
4 Helper – Repair after hours Monday – Friday, After 4:00 PM, Weekends & Holidays 50 Hours $ $
BL091-24 (Addendum #5) PAGE 14R
5 Service Call Charge (one-time charge per call) 118 Hours $ $
6 Mechanic - Ductwork Installer during normal hours Monday – Friday, 6:00 a.m. to 4:00 p.m. 115 Hours $ $
7 Mechanic – Ductwork Installer after hours Monday – Friday, after 4:00 p.m., Weekends & Holidays 15 Hours $ $
8 Helper – Ductwork Installer during normal hours Monday – Friday, 6:00 a.m. to 4:00 p.m. 115 Hours $ $
9 Helper – Ductwork Installer after hours Monday – Friday, after 4:00 p.m., Weekends & Holidays 15 Hours $ $
10 State percentage of mark up above cost for repair parts (not to exceed 10%) *** $175,000.00 % $
11 State percentage of mark up above cost for new HVAC equipment (not to exceed 10%) *** $350,000.00 % $
12 State percentage of mark up above cost for rental of HVAC equipment (not to exceed 10%) *** $75,000.00 % $
SECTION B TOTAL $
OVERALL TOTAL (Section A + B) $
* The quantities and dollar amounts listed in Section B are estimates of annual time and costs based on prior experience and are for evaluation purposes only. The quantities and amounts do not represent a guarantee of annual billings.
** Unit prices cannot exceed two decimal points.
*** Example: To calculate percentage markup, multiply $175,000.00 by percentage markup (for example if markup is 10%, calculation would be $175,000.00 x 1.10 = $192,500.00. $192,500.00 would go in the total column for the line item.)
The determination of lowest cost for the On Call Repair section will be based on the total of:
1. Service Classification Hourly Rates multiplied by a projected number of hours at regular time,
2. a projected number of Service Call Charges,
3. the proposed % Mark-Up multiplied by a projected value of parts and equipment.
The projections are estimates of annual time and costs based on prior experience and are for evaluation purposes only. The amounts do not represent a guarantee of annual billings. The calculations from the On-Call Repair projections will be added to the costs for the Preventive Maintenance Services to determine the lowest bidder(s).
CONTRACTOR NAME __________________________________________________________________________________________________
BL091-24 (Addendum #5)
REVISED APPENDIX A
Equipment List
Wimberly Tower
UNIT NAME MODEL # SERIAL #
AHU M-Series AH-T1-1 MCCB030UA0C0UA K05C38456 AHU M-Series AH-T1-2 MCCB025UA0C0UB K05C38447 AHU M-Series AH-T1-3 TSCB010U0C0000 K05C35789 AHU M-Series AH-T1-4 MCCB014UA0C0UA K05C38466 AHU M-Series AH-T1-5 MCCB008UA0C0UB K05C38474 AHU M-Series AH-T1-7 MCCB035UA0C0UA K05C38481 AHU M-Series AH-T1-8 MCCB030UA0C0UB K05C38495 AHU M-Series AH-T1-9 MCCB030UA0C0UA K05C38506
AHU M-Series AH-T1-10 MCCB035UA0C0UA KO5C38537 AHU M-Series AH-T1-11 MCCB030UA0C0UB K05C38601 AHU M-Series AH-T1-12 MCCB030UA0C0UA K05C38648 AHU M-Series AH-T1-13 MCCB035UA0C0UA K05C38657 AHU M-Series AH-T1-14 MCCB030UA0C0UA K05C38673 AHU M-Series AH-T1-15 MCCB030UA0C0UA K05C38693
AHU-SB-01(Lobby) Trane TSCB021U0C0000 K05K30580A AHU T-Series AHU-BB1 TSCB012U0C0000 K05C35797 AHU T-Series AHU-BB2 TSCB021U0C0000 KO5C35805 AHU T-Series AHU-BB3 TSCB006U0C0000 KO5C35814 AHU T-Series AHU-CC3 TSCB012U0C0000 K05C35829 AHU T-Series AHU-DD2 TSCB030U0C0000 K05D48466
Trane RTU (IT Rm.) THC102A4RAO 816100398L Trane RTU (IT Rm.) THC102E3RAO 103712033L
ERU-1 ANNEX AIR ERP-E-20-HP 0805-01-070805
ERU-2 ANNEX AIR ERP-E-20-HP 0805-02-060805
ERU-3 ANNEX AIR ERP-E-20-HP 0805-03-070805
Carrier RTU Admin Data 50TFF006- 501GA 2001G21698 Various Exhaust Fans
Plunkett Building/Sheriff Building
AHU #1 (A-pod) McQuayLML117EH 3VB00435-00 AHU #2 (E-pod) LML117EH 3VB00435-00 AHU #3 (B-pod) LML117EH 3VB00486-00 AHU #4 (F-pod) LML117EH 3VB00428-00 AHU #5 (C-pod) LML117EH 3VB00433-00 AHU #6 (G-pod) LML117EH 3VB00437-00 AHU #7 (D-pod) LML117EH 3VB00430-00
AHU #8 (ZZ-med) LSL114DH 3UM00662-04 AHU #9 (H-pod) LML114EH 3VB00250-00
AHU #10 (N-pod) LML117EH 3VB00434-00 AHU #11(K-pod) LML117EH 3VB00438-00 AHU #12(J-pod) LML117EH 3VB00254-00
AHU #13(Law library) LSL111CH 3VM00663-06 AHU #14(L-pod) LML117EH 3VB00438-00 AHU #15(I-pod) LML117EH 3VB00203-00
AHU #16 (2ZZ247) Intake-Holding LML114EH 3VB00251-00
AHU #17 (Central) LSL122DH 3UM00664-04 AHU #18 (DD1 Courts 1,2) LSL114DH 3UM00665-04
AHU #19 (2ZZ238) EE LSL108CH 3UM00666-06
AHU #20 (Shop) Trane No Tag No Tag
AHU#21 (M-pod) LSL117DH 3UM00667-04 AHU #22(A, B, E, F Corridor) LYF108CH 3VB00255-06
AHU#23 (A-E MECH) LSL104CH 3UM00669-06
AHU #24 (D-H mech) LSL111CH 3VD00054-06 AHU #25 (G-C mech) LSL106CH 3UM00670-06 AHU #26 (K-N mech) LSL111CH 3VD00055-06
AHU #27 (J-mech) LSL106CH 3VD00056-06 AHU #28 (I, L Corridor) LSL108CH 3UM00679-06
AHU #29 (L-I mech) LSL104CH 3UM00680-06
AHU #30 (2FF204) LSL106CH 3UM00641-06
AHU #31 (Connector Corridor) LSL104CH 3UM00373-06 AHU #32 (2 Main Back Corridor) LSL108CH 3UM00674-06 AHU #33 (1 Main Back Corridor) LSL103 CH 3UM00675-06 AHU #34 (2 Main Front Corridor) LSL104CH 3VA00037-06
AHU #35 (MAINT hall) LSL106CH 3UM00676-06 AHU #36 (Cart Staging-Tray Up) LSL 106CH 3UM00672-06
AHU #37 (SB FL 1) LSL128DH 3UMOO677-04
AHU #38 (SB FL 2) LSL128DH 3UMOO678-04
AHU #39 (Inmate Dining) Trane CSAA008UBL00 K17J74430 AHU #40 (Fl 1 Main Front Corridor) LSL104CH 3VB00431-06
AHU #41 (M Pod) LSL103CH 3VB00432-06 AHU #42 (Kitchen)Trane CSAA008UBL00 K16H61463
AHU #43(KITCHEN)Trane CSAA017UBL00 K15E39534 BC-T1-701 2 Mezz RS Elect. Trane
BC-T1-702 2 Mezz Right side. Trane BC-T1-101 In Medical By ISO. Trane BC-T1-503 Water Heater Rm. Trane BC-T1-504 Pmp. Rm. GG109. Trane
BC-T1-S8 1 Mezz Over Medical.
Trane
FC-T1-301 Sgt. Office 1st. Fl. Trane FC-T1-501In Laundry Office. Trane
BC-T1-301 Secured Elec. 1st. Fl.
BC-T1-302 Elec. Rm. By Electron.
BC-T1-303 Elec. Rm. 1st. Fl. Trane BC-T1-304 TWR Kitchen. Trane
BC-T1-501 Laundry Stock Rm. Trane BC-T1-502 1 Mezz Fire Alarm Rm.
BC-T1-S6 Back of Laundry Stairs.
BC-T1-S7 Between B&C Pods. Trane BC-T1-1001 3 Mezz Right side.
BC-T1-1002 3 Mezz Right Side.
Various Exhaust Fans
CHILLER PLANT
CHILLER #1 (3/6/2014) CVHF570 Trane L14E02491 CHILLER #2 (5/5/2015) CVHF570 Trane L15D02386
CHILLER #3 (12/1/2023) CVHF760 Trane L23C00487 BOILER #1Unilux ZF700W A2296 BOILER #2 Unilux ZF700W A2297 BOILER #3 Unilux ZF1000W A3800
COOLING TOWER 1 Marley NC 101236657-A1-NC
8411QLN2GGF
COOLING TOWER 2 Marley NC 10123657-A2-NC
84110LN2GGF 2016
COOLING TOWER 3 Marley 10017081-A1-NC8411UIGGF COOLING TOWER PUMP#100 Taco 14 HL-1 TX20399-1
Motor NIDEC FL97 X057646616 COOLING TOWER PUMP #101 Hydroflo 14HL-1 TX35853
Motor NIDEC JC68 E 12 7840624-0002 M
COOLONG TOWER PUMP #3 Taco 14HL-1 TX20404-2 Motor NIDEC 16703461-100 X11 16703461-001
COOLING TOWER PUMP#4 Taco 14HL-1 TX2004-1 Motor NIDEC 16703461-100 11X16703461-0001
Mini Split Tower Elevator Split System Twr Elevator Split System Twr Elevator Split System Twr Split System by AHU-CC3
Split System on Plunket Roof
BUILDING AUTOMATION SYSTEMS (BAS) COVERED EQUIPMENT LIST
Equipment
Qty
Manufacturer
Model Number
Serial Number
Asset Tag
Tracer Summit Building Management
1 Trane BMTX001AAA E05F71720 BCU#3
Service Description Quantity Per Year System Analysis and Review (Service 1) 12 AHU Controls Support (Service 2) 12 Chilled Water System Controls Support (Service 3) 12 Hot Water System Controls Support (Service 4) 12 Operator Coaching (Service 5) 12
Equipment Qty Manufacturer Model Number Serial Number Asset Tag Site Level Activities 1 Trane MONITORING
Service Description Quantity Per Year Update Active Alarm Monitoring Processes (Service 6) 3
Equipment Qty Manufacturer Model Number Serial Number Asset Tag
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63790
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63791
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63792
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63793
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63796
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63797
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63798
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63799
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63801
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63802
Programmable
49500500
E13K63803
Programmable Controller (BMTM)
1 Trane 49500500 E13K63804
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63805
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E13K63807
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31200
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31201
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31202
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31205
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31206
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31210
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31212
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31213
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31215
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31216
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31217
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14B31218
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30081
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30082
MP581
Programmable
1 Trane 49500500 E14E30083
Controller (BMTM)
1 Trane 49500500 E14E30084
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30089
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30090
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30091
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30093
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30095
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30096
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30098
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30100
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30116
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30117
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30118
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30119
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30120
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30122
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30123
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30126
MP581
Programmable Controller (BMTM)
1 Trane 49500500 E14E30127
MP581
Programmable
1 Trane 49500500 E14E30128
Controller (BMTM)
1 Trane BMTM000AAD E13K42073
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42074
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42075
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42076
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42077
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42078
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42079
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42080
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42082
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42083
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42084
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42085
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42086
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42087
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42088
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42089
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E13K42090
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E14B41947
MP581
Programmable
1 Trane BMTM000AAD E14B41948
Controller (BMTM)
1 Trane BMTM000AAD E14B41954
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E14B41955
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E14F44841
MP581
Programmable Controller (BMTM)
1 Trane BMTM000AAD E14F44842
Tracer Summit Building Management
1 Trane BMTX001AAC E13K42050
Tracer Summit Building Management
1 Trane BMTX001AAC E13K42051
Tracer Summit Building Management
1 Trane BMTX001AAC E13K42052
System Control Units 1 Trane MP-580 50100885 System Control Units 1 Trane MP-580 NS-3703837
CUSTOMER SERVICE FLOWS FOR COVERED EQUIPMENT
The following Customer Service Flows provide additional service description detail for Covered Equipment. Note: There may be differences per the agreement in the work being performed between sites and the equipment on those sites. This section clarifies differences in the work being performed between sites and the equipment on those sites:
Service 1: System Analysis and Review
• Operator Workstation Inspection
• System Controller Inspection
• Verify System Software Programming
• System Back-Up
• Customer Review - 30 Minutes
• Software Service Pack Update (Per Workstation and/or BCU)
Service 2: AHU Controls Support
• Connect Service Tool
• System Controller Inspection
• Verify System Software Programming
• Sequence of Operation Verification
• Loop Tuning
• Review System Results
• Disconnect Service Tool
Service 3: Chilled Water System Controls Support
• Connect Service Tool
• System Controller Inspection
• Verify System Software Programming
• Sequence of Operation Verification
• Loop Tuning
Service 4: Hot Water System Controls Support
• Connect Service Tool
• System Controller Inspection
• Verify System Software Programming
• Sequence of Operation Verification
• Loop Tuning
Service 5: Operator Coaching
• Operator Coaching
Service 6: Update Active Alarm Monitoring Processes
• Alarms Monitoring.
• Calibrate Alarm Monitor
REVISED APPENDIX C
COMPREHENSIVE PREVENTATIVE
MAINTENANCE FOR AIR CONDITIONING
SYSTEMS AND AIR HANDLING UNITS (AHUs)
IN-HOUSE SEMI-ANNUAL ON REQUEST
1. Install gauges and check operating pressures X
2. Check voltage and amperage to all motors X
3. Check air temperature drop across evaporator X
4. Check all adequate refrigerant charges X
5. Check for refrigerant leaks X
6. Lubricate all moving parts X
7. Check belts and adjust the tension X
8. Replace filters X
9. Check pressure switch and cut-out settings X
10. Check electrical lock-out circuits X
11. Check starting contactor contacts X
12. Check all wiring and connections X
13. Check and adjust thermostats for proper calibration and operation X
14. Check air temperature across condenser X
15. Turn exposed dampers to cooling, if marked X
16. Check and flush condensate drain X
17. Visually check ductwork X
18. Remove dust, soot, rust, etc., from furnace blower X
19. Check Delta T across evaporator coil, clean if less than sixteen (16) degrees. X
20. Operate air conditioning system through normal cycle, make any necessary adjustments
X
21. Clean evaporator drain pan X
22. Clear condensate drain and add cleaning agent to drain line to prevent unnecessary clogging
X
REVISED APPENDIX C
COMPREHENSIVE PREVENTATIVE
MAINTENANCE FOR CHILLER
SYSTEMS
QUARTELY SEMI-ANNUAL ANNUAL ON REQUEST
Compressor A. Motor
1. Ampere Balance (within 10%) X
2. Terminal check (tight connection; clean) X
3. Motor cooling (check temperature) X
B. Lubrication System
1. Oil cooler strainer(water) X
2. Oil cooler solenoid operation X
3. Oil analysis X
4. Oil filter change X C. Vane Operation - Compressor
Loads
1. Operate manual switch
2. Record motor amps D. Vane Operation - Compressor unloads
1. Operate manual switch X
2. Record motor amp. X E. Internal Compressor Check X
Controls A. Operating Controls
1. Check LRT settings and operation X
2. Check vane control setting and operation X
3. Verify motor load limit control X
4. Verify load balance operation X
5. Check oil pump contactor X
6. Check soft-start settings and function X
7. Check chilled water reset settings and function
OSA= 75 deg F/ LCHW= 44 deg F OSA= 65 deg F/ LCHW= 55 deg F
X
8. Check chiller lockout Setpoint = 55 deg F X
B. Protective controls: Test operation of X
1. Alarm relay X
2. Pump interlock X
3. Hot and cold oil temperature switches X
4. Surge guard relays X
5. High- and low-pressure switch X
6. High suction temperature switches X
7. High discharge temperature switch X
8. Low pressure override switch X
9. Oil pump pressure differential switch X
10. Oil pump time delay switch X
11. System monitor timer X
12. Vane closed switch X
Condenser A. Water Quality (test) X B. Condenser Tube (clean) X C. Eddy Current Test-Tube Wall
Thickness X
D. Seasonal Protection X E. Check Setpoints
Cond. Water = 75 deg. F Bypass = 60 deg. F
X
Evaporator A. Water Quality (test) X B. Evaporator Tubes (clean as required) X
C. Eddy Current Test-Tube Wall Thickness X
D. Seasonal Protection X Expansion Valves
A. Performance Evaluation (superheat control) X
Compressor-Chiller Unit A. Leak test
1. Compressor fittings and terminal X
2. Piping fittings X
3. Oil pump joints and fittings X
4. Vessel relief valves X B. Vibration Isolation Test X
Starter(s) A. Contactors (Examine hardware and operation) X
B. Overload Setting and Trip (Verify) X
C. Electrical Connections (Test) X D. Pump Down Control (Verify operation) X
Optional Controls A. Hot Gas Bypass Controls
(Verify operation) X
B. Liquid Injection Controls (Verify operation) X
C. Pump Down Control (Verify operation) X
APPENDIX C
COMPREHENSIVE PREVENTATIVE MAINTENANCE FOR BOILER
SYSTEMS
SEMI-ANNUAL
1. Inspect gas train, oil system, burner, and control panel.
Check for debris and ensure integrity of all connection points; refer to burner manual where needed
X
2. If inspection shows soot accumulation which cannot be removed by gas firing alone, clean the fireside surfaces. X
3. Clean breeching X
4. Clean waterside surfaces X
5. Check oil storage tank and oil pumps X
6. Check condensate drain X
7. Analyze combustion X
8. Conduct a gas valve leak test X
9. Test relief valve(s) X
10. Check combustion air fan for vibrations, dirt accumulation X
11. Clean and adjust pilot assembly X
12. Inspect burner refractory X
13. Check air vent X
14. Replace handhole/manway gaskets X
15. Test gas pressure switches X
16. Check motor operation X
COMPREHENSIVE PREVENTIVE MAINTENANCE FOR FREEZERS
AND COOLERS
SEMI-ANNUAL
1. Check level of refrigerant X
2. Check Amp draw on compressors, fan motors and defrost heaters X
3. Check floor heaters in freezers if equipped X
4. Check drain heat tape X
5. Look for signs of corrosion on fins, cabinet, copper tubing and solder joints. X
6. Look for excessive or unusual vibration for fan blades or sheet metal panels when in operation. Identify fan cell(s) causing vibration and check motor and blade carefully.
X
7. Look for oil stains on headers, return bends, and coil fins.
Check any suspect areas with an electronic leak detector.
X
8. Check drain pan to ensure that drain is clear of debris, obstructions or ice buildup and is free draining. X
9. Check condition of moisture indicator/sight glass in the sight glass if so equipped. Replace liquid line drier if there is indication of slight presence of moisture.
Replace refrigerant, oil and drier if moisture concentration is indicated to be high.
10. Check moisture indicator/sight glass for flash gas. If found check entire system for refrigerant leaks and add refrigerant as needed after repairing any leaks. Check condition of condenser. Look for accumulation of dirt and debris (clean as required).
X
11. Flush and rinse coil until no residue remains. Pay close attention to drain pan, drain line and trap. X
12. Check that each fan rotates freely and quietly. X
13. Check all fans set screws and tighten if needed. X
14. Check all fan blades for signs of stress or wear. X
15. Verify that all fan motors are securely fastened to the motor rail. Lubricate motors if applicable. X
16. Visually inspect all wiring for wear, kinks, bare areas, and discoloration. X
17. Verify that all electrical and ground connections are secure, tighten if necessary. X
18. Check all door seals. X
19. Check operation/calibration of all fan cycle and defrost controls when used. X
20. Look for abnormal accumulation of ice patterns and adjust defrost cycles accordingly. Compare actual defrost heater amp draw against unit data plate.
X
21. Check unit cooler superheat and compare reading for your specific application. X
22. Visually inspect coil for even distribution. X
23. Check operation of demand cooling, liquid injection, or unloaders if so equipped. X
24. Check pressure drop across all filters and driers. X
25. Verify that superheat at the compressor conforms to specification. Check pressure and safety control settings and verify proper operation.
COMPREHENSIVE PREVENTIVE MAINTENANCE FOR ENERGY
RECOVERY UNITS (ERUs)
SEMI-ANNUAL ON REQUEST
1. Inspect unit for unusual noise or vibration. X
2. Inspect and clean housing. X
3. Check belts and adjust tension. X
4. Lubricate all moving parts. X
5. Inspect fan and motor for proper alignment. X
6. Clean entire unit, motor, and fan assembly. X
7. Clean intake and exhaust grills, louvers, and bird/insect screens. X
8. Check motor load amps. X
9. Inspect fan blades and moving parts for excessive wear. X
10. Inspect all wiring for deterioration. X
11. Check tightness of electrical connections. X
12. Inspect electrical contact surfaces. X
13. Inspect weather hood and screens. X
14. Inspect and clean exchanger cores. X
File details come from the government source that posted it. Updated .