BILL OF QUANTITY - Attachment 2.pdf
PDF 72 KB Posted
- Attached to
- Replacement of Air Conditioning System at Multi Purpose Building Federal contract opportunity
- Solicitation number
- 191T7020R0001
- Issued by
- Department of State
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF-174 Security Form Attachment 4.pdf | ||
| M202REV 2 - Attachment 3.pdf | ||
| SF-1442.doc | DOC document | |
| M203 REV 2 - Attachment 3.pdf | ||
| Technical Specifications - SOW - Attachment 1.pdf | ||
| Cover Letter.pdf | ||
| M201REV 2 - Attachment 3.pdf | ||
| 191T7020R0001.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR CONDITIONING MPR BUILDING FIRST FLOOR
ITEM UNIT COST unit COST Tot.
Removal of all furniture in the offices on first floor and transportation of them to the storage location as directed by the COR, within the Tri-Missions Campus, where the furniture shall be downloaded and taken in charge by the Embassy warehouse.
Lump Sum
Protection of floor and surfaces with cardboard sheeting and poly sheets. Sq.m. 350 circa
Lump Sum
Drainage of air conditioning system, removal of fan coils AND radoiators in the toilets on first floor and capping of existing piping for future removal. NOTE: this activity may be required to be performed after hours or on weekends not to interfere with the activities ongoing on ground floor since the piping for first floor runs above false ceiling of ground floor. This operation involves as well additional protections and precautions not to damage with water floods or dust the ambients of ground floor that include the NEX supermarket.
Lump Sum
Perform similar activity in the Motor pool offices on ground floor. NOTE: these offices shall remain operational during all stages of project. This requires special coordination to avoid that these rooms remain without air conditioning.
Lump Sum
Demolition of existing false ceiling on first floor in the corridor and partially in the rooms as indicated in the drawing M201 Corridor sq.m. 63 Offices South side sq.m. 110 Offices North side sq.m. 81 total sq.m. 254 circa
Lump Sum
Demolition of selected portions of walls between corridor and rooms for the passage of air conditioning ducts, piping and cables, and for the installation of the recuperator as per drawing M201
Lump Sum
Opening of aperture on the roof for the new air intake, including opening up roof layer, penetration,waterproofing membrane, repositioning of roof tiles, and construction of a chimney similar to others on the same roof.
Lump Sum
REV. 0 MARCH 24 2020 1 OF 4
Opening of exhaust air discharge in the West facade of building, including cost for scaffold and exterior paint touch ups.
Lump Sum
Supply and installation of metal cable trays for the installation of the VRF piping, and for the future air conditioning of BCC. Size L 300 mm, H 100 mm. Total lenght m 260
Lump Sum
Supply and installation of galvanized steel Hbeam, HEB 180, construction grade, to form a supporting struture for the VRF external unit, so not to have it resting on the terrace floor, but rather on the perimeter walls. Complete platform with 4 anti seismic shock absorber type SOLECO LaLrWr 12 having a spring ratio of 5 Kg/mm.
Lump Sum
Supply and installation of VRF system as per drawing M201 and M202. System made of:
External unit 3-pipe, full DC inverter type HAIER MRV 5- RC, model AV16IMVURA
Lump Sum
Internal units 4‐ways smart flow DC inverter type HAIER, model
AB072MRERA, No. 17 Lump Sum
Internal units for wall installation type HAIER AS052 MNERA, No. 1 Lump Sum
Internal units for wall installation type HAIER AS072 MNERA, No. 4 Lump Sum
Cross type heat recuperator with integrated direct expansion coil type HAIER, model HACI‐RPDX 65, No.1 Lump Sum
Internal unit wired controls type HAIER, model YREA, No.20 Lump Sum
Master local control panel, LCD touch type HAIER, model GW1 Lump Sum
Converter from Haier proprietary language to BACNET for connection to the existing Trane Tracer BAS, type HAIER model
HCM‐0.5, Including separate module for the monitoring of electric consumption. No. 1
Lump Sum
Branch pipe for Haier 3‐pipe VRF No. 22 Lump Sum
Valve box for Haier 3‐pipe VRF model VP1‐112B, No. 20 Lump Sum
REV. 0 MARCH 24 2020 2 OF 4
Rigid copper pipe UNI 12735‐1 tickness 1 mm of the following diameters
19,05 m 12
15,88 m 120
9.52 m 120
Lump Sum
Supply and installation of Thermal isulation of rigid piping shall be made with TROCELLEN ISOCOMPACT GUAINE CL1/ALU‐NET, pre‐ formed pipe made of polythilene expanded with closed cells, of following characteristics:
Tickness: 15 mm
Jacketing: Aluminum
Fire resitance: Class 1
Thermal conduttivity at 40° C = 0.0372 W/mK
Resistivity to diffusion of water vapor: > 64000
Without CFC
Terminal branches of VRF piping shall be pre‐isolate:
Tickness: 10mm
Lump Sum
Flexible copper pipe UNI 12735‐1 Tickness 1 mm with 10 mm thick thermal insulation
9,52 m 90
6,35 m 90
Lump Sum
Supply and installation of BUS cable type BELDEN model YE0455‐
V_1, 2 core, AWG 16 shielded wire, LHSZ m 300 circa, including conduits, junction boxes and accessories
Lump Sum
Connection to electric shop on ground floor of Bacnet cable to
Trane Tracer, all inclusive Lump Sum
Supply and installation of galvanized steel circular ductwork, size per drawing M203, total weight of ducts Kg. 300 Lump Sum
Supply and installation of duct thermal insulation Type TROCELLEN, model CLASS ALU ADHESIVE tickness 10 mm, complete with tape for the joints 3 mm tick and 50 mm wide. Total surface of insulation sq.m. 60
Lump Sum
Supply and installation of IRIS balancing dampers make
TECNOVENTIL, model SIRTV in galvanized steel amnaual actuation and differential pressure gauge.
Size 180 mm No. 2
Size 200 mm No. 2
Size 80 mm No. 1
Lump Sum
Supply and installation of intake and exhaust grille, per drawing
M203 Lump Sum
REV. 0 MARCH 24 2020 3 OF 4
Supply and installation of flexible insulated conduits for the connection of the terminal to the main ductwork, make
TECNOVENTIL, type T2LP, per specifications. Lenght circa m 50
Lump Sum
Supply and installation of electric wire inside EMT's if exposed or
PVC if buried of following type:
5G16 for the external unit, m 50
3G2.5 for the internal units, m 200
Lump Sum
Supply and installation of electric radiators for the toilets on first floor that falls within the work area (2). Radiators shall be fed from a new electric circuit and complete with local GFI breaker. Power each 1 kW, to be sampled. Quantity 4
Lump Sum
Start up of VRF equipment by the manufacturer authorized dealer, and test and balancing the ventilation system Lump Sum
Construction of new catwalk, per specifications and drawing M201, total sq.m 63. Catwalk includes 2 hatches with retractile stairs to access the catwalk
Lump Sum
Supply and installation of gipsum panelboards as false ceiling in rooms and corridor previously removed, including supporting structure, sealing of joints and plastering. Excluded only the painting. Sq.m. 250 circa
Lump Sum
Painting of ceiling and walls with water based vinil paint of primary brand, including wall preparartion and 2 coats of paint.
Ceilings sq.m. 350 walls sq.m. 900
Total sq.m. 1250 Lump Sum
TOTAL
REV. 0 MARCH 24 2020 4 OF 4