Bill of Quantities - 191T7024Q0031.pdf
PDF 64 KB Posted
- Attached to
- Manhole on Via Friuli, Rome, Italy
- Solicitation number
- 191T7024Q0031
- Issued by
-
Department of State
About this file
This document is a Bill of Quantities for a federal contract opportunity, Solicitation Number 191T7024Q0031, issued by the Department of State to carry out a new buried piping system connecting the current medium voltage circuit along Via Friuli to the Ground Floor of the Power Building in the Embassy's compound in Rome, Italy.
The key requirements include the supply and installation of a georadar technology for ground subsurface investigations, supervision by a licensed archeologist, preparation of the construction area, removal and reinstallation of porphyry or flint paving cubes, demolition of concrete floor subfloors, cross-sectional excavation, core drilling, supply and installation of inspection manholes, and supply and installation of rigid thermoplastic pipes for cable conduits. The Bill of Quantities provides unit costs and total estimated costs for these and other related work items. The work is required to comply with Quality Level "LQ-B-I" of P UNI/PdR 26.1:2017. The total estimated cost for the work is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 191T7024Q0031 - Questions and Answers.docx | DOCX document | |
| RFQ - 191T7024Q0031.docx | DOCX document | |
| Technical Specifications - 191T7024Q0031.pdf | ||
| Cover Letter - 191T7024Q0031.pdf | ||
| SF-1442 - 191T7024Q0031.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. DESCRIPTION UM QUANTITY UNITY COST € TOTAL COST €
Supply of a georadar technology for the ground subsurface investigations using, including site set-up and removal, that allows the execution of mapping of the subsurface at a depth that depends on the dielectic characteristics local soil, by means of electromagnetic survey performed with multichannel radar equipment, with single or arrayed antennas, of frequencies between 200 MHz and 600 MHz. The result of the survey includes cartographies the georeferenced planimetric course of the subservices surveyed at a scale of 1:100, the location of existing references, and information about other concentrated anomalies (e.g., stubs, small cavities, manholes, etc.), linear anomalies (e.g., walls or foundations) and anomalies extensive (e.g., stratifications, large structures, etc.); including sections schematic, performed at each point of significant variation in planoaltimetric layout. The cartographies and any other elaborate graphics will be produced in digital form, accompanied by a technical report summarizing of the various stages of investigation; including any other charges for surveys, personnel and means of work and including traffic regulation, the prior placement of no-parking signs in the areas affected by the survey and any regulation of traffic flow during the phase of data acquisition. All stages of the survey, from data acquisition to interpretation and return of the final elaboarates, shall comply with the requirements by the Quality Level "LQ-B-I" of P UNI/PdR 26.1:2017.
sqm 60 € -
Provide an archeologist, licensed to the profession and registered, with the task of supervising all earthmoving operations and documenting in detail with photos, surveys and work log during the entire duration of the excavation work.
lump sum 1 € -
Preparation of the construction area through the use of temporary and removable bollards and/or fences, equipped with a fastened sight occlusion net or plastic sheet, lightings for night road signaling and relatives workplace safety signs. Supply and install cabinets, boxes or similar items where storage dangerous materials and tackle in order to prevent their use from third parties. Access to the worksite shall occur using a door installed on the fence perimeter and locked by a chain with a padlock. A copy of the padlock's keys shall be handed in to the COR.
Supply of certified construction site electrical panel, connected by the electrician, including grounding with drafting of declaration of conformity and whatever is required by law for the execution of the work described and to give the work finished and in a workmanlike manner.
lump sum 1 € -
Removal of porphyry or flint paving cubes, by hand and/or with the aid of mechanical means, including all labor and equipment, with storage of the cubes at the site area, including their cleaning from mortar and sand, with removal of the bedding sand and cleaning of the bottom, for cubes with dimensions of 8x8cm up to 12cm x 12cm cubes.
sqm 25 € -
Demolition of concrete and/or concrete floor subfloors with a thickness of 10cm, with reinforcement including mesh, by using any means, including the cost of execution even in small areas, transport, stacking within the construction site.
sqm 20 € -
Cross-sectional excavation, on roads in the presence of vehicular traffic to a depth of 2.00 m from the overburden or, in the absence of this, from the edge of the hollow, of soils in rocks with resistance greater than 8 N/mmq performed by any means except mines, both in dry and wet, even in the presence of water stabilizing in the cable up to the height of 0.20 m excluding water from the water table, also including the flattening and configuration of the bottom, pulling up to the edge of the cable and in any case in a safe position, including the work of securing the excavation (paneling and shoring of the walls of the excavation).
sqm 10.5 € -
Drilling performed with core drills or other similar mean, with electric engine, for sampling, drilling of building structures, for laboratory tests, testing, inspection, restoration, carried out on reinforced concrete and with core diameter of at least 200mm and a lenght of 1.00mt.
m 1.5 € -
Supply and installation of inspection manholes in prefabricated concrete elements: bottom element of height 100 cm with footprints of thickness reduction for the introduction of the crossing pipe. Slab driveway cover. The elements will be laid on a concrete slab 20 cm thick, reinforced with electro-welded mesh mesh 20x20, with dimensions 20 cm larger than the external dimensions of the manhole. The elements will be sealed and grouted between them with the interposition of cement mortar. The manufacturing company shall provide upon request of the Construction Management the calculations of static verification of the elements. Internal section 100cmX100cmX140cm, with a wall thickness of 18cm. Inspection manhole, supplied and installed, in standard ductile cast iron , suitable for severe and intense traffic conditions,coated with protective synthetic paint and square shaped frame with side not less than 1000 mm, height not less at 100 mm, with fixing holes and slots and equipped with shock absorber joint continuous in high resistance elastomer, housed in a special seat, with self-centering function for the lid. Equipped with lifting rings during installation.
lump sum 1 € -
Supply and installation of a self-extinguishing rigid thermoplastic pipe for cable conduits, heavy series (crushing greater than 750 N) to CEI standards, with IMQ quality mark, for underground cable protection, in place, with an outer diameter of 160mm, buried inside a layer of sand that has to sorround the pipe for a minimum of 10cm each side and provide a protection layer material to be place on the to be installed on the top. See D.M. LL.PP. 12/12/1985 concerning the guidelines necessaries to follow for installing buried pipelines.
m 15 € -
Backfilling or filling of cables or holes for works in urban areas through the use of mechanical or manual means with material from the excavations, previously selected, including leveling, compaction and piling in layers not exceeding 0.30 m, wetting and necessary reloading , the movements of materials for the above by using both mechanical or manual means.
mc 1 € -
Execution of the stabilized granular mix road foundation with type 325 cement, including the protective bitumening to the extent of 1 kg/sq.m. of ER 50 emulsion, including the supply of materials, laboratory testing, processing and compaction of the layer with suitable machines including all work and charges to give the work finished in the prescribed manner and in a workmanlike manner, including reinforcing iron .
mc 1 € -
VIA FRIULI NEW MEDIUM VOLTAGE PIPILINE
New paving performed by repositioning in place, on the new reinforced concrete surface, the cobblestones removed previously. The installation will be done with the use of sand and cement and the surface of the new pavement should be as as flat, compact and homogeneous as possible. To complete the work, the following is required grouting/sealing of the cobblestones with material fibrolelastic material of the polymer sand type.
sqm 25 € -
Miscellaneous charges and supplies to complete the works such as: small recoveries on plasters, recoveries of paintwork, interventions and supplies not assessable in quantity such as freight and scaffolding, the removal to public landfill of all materials from waste, the final cleaning of the site and whatever else is necessary to give the work finished in a workmanlike manner. It is included the painting of the wall involved inside the power building.
lump sum 1 € -
14 Cost for safety lump sum 1 € 1,500.00 € 1,500.00
Total € -