This is a specification document for a playground installation project issued by the Tennessee Department of Facilities Management for Big Cypress Tree State Park located at 295 Big Cypress Road in Greenfield, Tennessee. The project requires contractors to furnish all materials, equipment, supplies, and labor necessary to install a commercial playground based on a Kompan configuration as reflected in Site Plan K1.0 (dated 01/19/2025). The scope of work includes removal and disposal of existing playground equipment, site preparation with grading and a four-inch gravel base, installation of a composite multi-level tower playground structure, a four-seat swing frame eight feet high, an ADA-compliant full ramp system, ancillary play components including a Custom Triple Tower Wackle, custom signage, agora bench, approximately 58 pieces of twelve-inch plastic playground border, and approximately 2,640 square feet of engineered wood fiber (EWF) surfacing at twelve-inch compacted depth with filter fabric. All work must be completed between contract execution and December 30th, 2026. The project requires a pre-construction meeting and final inspection before work begins and payment is authorized.
Contractors and applicable subcontractors must possess an active specialty Tennessee Building Contractor license (BC-b(sm), BC-B, BC-7, or BC-C) prior to bid submission, with all licenses verified through the Tennessee Commerce and Insurance database. Contractors must submit a Declaration of Intended Use of Subcontractor(s) form with their bid, and any subcontractor substitutions after award require written Facilities Management approval. All work must comply with state-approved versions of the International Building Code, ASTM F1487, CPSC Public Playground Safety Handbook standards, and ADA accessibility requirements. The contractor is responsible for all permits and associated fees. Approved playground equipment brands include Kompan, Landscape Structures, Superior Recreational Products, Bliss Products, Henderson, Play and Park, Burke, Gametime, Playworld, Playcore, and Carnes Recreation, with equivalent products requiring pre-approval. Work shall be performed Monday through Friday, 8:00 a.m. to 4:30 p.m., unless otherwise approved, and workmanship is warranted for not less than one year from the date of final inspection. The successful contractor must be registered with the Tennessee Department of Revenue for sales and use tax collection before contract execution. Invoices must be submitted no later than ten days after project completion and acceptance to Susan Blankenship at the address provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Playground Installation
Big Cypress Tree State Park
295 Big Cypress Road
Greenfield, Tennessee 38230
This request for bids is for a Contract to furnish all material, equipment, supplies, and labor necessary to install a commercial playground.
General Conditions
1. On-Site work shall be performed between receipt of signed Contract or Purchase
Order and December 30th, 2026, unless a written exception is granted by the
Facilities Management Regional Manager.
2. For this project, the Contractor and applicable subcontractors shall possess an active specialty license for Playground Installation, BC-b(sm), BC-B, BC-7 or BC-C Tennessee
Building Contractor license prior to submitting a bid. Failure of the Contractor and applicable subcontractors to provide copies of their appropriate license shall result in the disqualification of the bid. All licenses shall be verified via Tennessee Commerce and Insurance database before project award.
3. The Contractor shall not assign this Contract or enter into a subcontract for this project without prior written approval of Facilities Management. The Contractor’s bid shall include a Declaration of Intended Use of Subcontractor(s) form that clearly states the intent to use a subcontractor, along with their name and license number.
Facilities Management reserves the right to reject a bid in whole or a subcontractor, based upon failure to possess an appropriate active TN builder’s license. After project award, any proposed substitution or addition of a subcontractor shall require written Facilities Management acceptance and approval before being allowed on-site or perform any work under this Contract. All subcontractors are required to have an active TN Building Contractor license for the applicable work to be performed before and throughout the project. Any proposed subcontractors failing to meet these requirements are not allowed to perform work on any portion of this project.
4. All work shall comply with State-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer’s recommendation, and best practices. The
Contractor is responsible for all permits and associated fees.
5. Only the Facilities Management Project Manager or Facilities Management Regional
Manager can approve any alterations, modifications, and substitutions of the specifications or requirements of the project. No additional work shall be authorized unless pre-approved by either the Project Manager or Regional Manager in writing.
Park/Hospitality management and staff are not authorized to make any changes, deletions, or additions to the project or accept any portion of the work. This Contract
Greenfield, Tennessee 38230 shall be modified only by a written agreement signed by all parties. Any work performed outside of the written scope with any written change orders will be the responsibility of the Contractor or others and not Facilities Management. All questions, directives, and acceptance shall come only from either the Facilities
Management Regional Manager and/or Project Manager.
6. The Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner.
7. All color selections shall be provided to the Contractor by the Facilities Management
Project Manager.
8. All material substitutions must be pre-approved prior to bid acceptance.
9. All materials shall be installed per manufacturers’ recommendation, industry best practice, and applicable code. Installers shall provide documentation of training and certification from the manufacturer of the playground equipment.
10. All dimensions listed are approximate. The Contractor is solely responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to a bidder neglecting to visit the site and verifying dimensions and conditions.
11. All work performance under this Contract shall be under the full-time direction of the
Contractor. The Contractor shall be responsible for work and performance, and damages of any subcontractors and/or independent contractors or laborers hired in connection with the work under this Contract.
12. Basis of Design: Kompan playground configuration as reflected in Site Plan K1.0
(dated 01/19/2025).
13. Bidders may submit equivalent products meeting or exceeding the performance, dimensional, structural, capacity, and accessibility requirements outlined herein. All proposed equals must be reviewed and approved by Facilities Management prior to award.
14. All playground equipment shall comply with ASTM F1487, CPSC Public Playground
Safety Handbook standards, and all applicable ADA accessibility requirements.
15. All materials shall be new and in good condition. Installation shall be in accordance with manufacturer specifications and industry standards
Description of Demolition or Associated Work
1. The Contractor shall remove and dispose of all existing playground equipment, plastic boarder and mulch.
General Scope of Work
1. The Contractor shall prepare designated playground area for installation of new equipment. This includes removal of existing playground, topsoil, grade work to level site, and a four (4) inch gravel base. The site shall have a one percent (1%) slope to allow for proper drainage. The Contractor shall compact any fill-in areas appropriately.
2. The Contractor shall provide and install composite multi-level tower playground structure consistent with the attached site plan.
3. The Contractor shall provide and install a four (4) seat swing frame, that is eight
(8) feet high.
4. The Contractor shall provide and install an ADA full ramp system providing accessible entry.
5. The Contractor shall provide and install ancillary play components including
Custom Triple Tower Wackle, Custom Sign, ADA Full Ramp, Custom Swing, Agora Bench and associated play features as reflected in the attached site plan.
6. The Contractor shall provide and install approximately 58 pieces of twelve (12) inch plastic playground border system.
7. The Contractor shall provide and install approximately two thousand six hundred and forty (2,640) square feet of engineered wood fiber (EWF) surfacing at twelve (12) inch compacted depth with one (1) layer of filter fabric, in accordance with manufacturer and safety standards. The EWF shall conform with ASTM F2075, ASTM F1292, and ASTM F1951 standards.
8. The Contractor shall install all support posts encased in concrete per manufacturer requirements.
9. The Contractor shall provide a complete installation including equipment assembly, surfacing placement, finish grading, and final site cleanup.
10. Final layout orientation and placement within the approved footprint shall be confirmed at the pre-construction meeting.
Approved Brands and Specifics (or Pre-approved
Equal) Item Approved Brand or Pre-
Approved Equal
Specific Requirements
Playground and equipment
Kompan, Landscape
Structures, Superior
Recreational Products, Bliss
Products, Henderson, Play and Park, Burke, Gametime, Playworld, Playcore and
Carnes Recreation (Burke)
Equal brand shall require approval prior to project bid acceptance.
Engineered wood fiber
Shall consist of clean, virgin softwood or hardwood fibers that have been processed to create a uniform, interlocking material. Fibers shall be free of bark, twigs, leaf debris, and other organic contaminants that could accelerate decomposition
Additional Terms and Conditions
1) All aspects of this job shall be left in a finished condition: All finish work, interior and exterior walls and trim, finish painting, caulking and final cleanup are included in this
Contract.
2) The Contractor shall be responsible for determining where all utilities are on the job site and care should be taken to protect the utilities from any damage caused by the demolition/construction. This shall include any underground utilities around the job site area. If damage occurs, it shall be repaired within a twenty-four (24) hour period from the time damage occurs.
3) The Contractor shall perform work on regular time and shall invoice work time and material not to exceed the quoted price. Any variance in quote shall be addressed only with a representative of the Facilities Management Regional Office before any additional work is undertaken or materials ordered.
4) Work shall be scheduled to avoid any interference with normal operation of the park as much as possible. During the construction period, coordinate construction schedules and operations with the Park Manager. Work shall be conducted during the normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., unless an alternate schedule is approved by Facilities Management.
5) The successful Contractor shall schedule and attend a pre-construction conference where a pre-construction form shall be signed by Facilities Management, Contractor and Park Manager or park representative before work can begin. The Contractor shall also schedule and attend a final inspection where a final inspection form shall be signed by Facilities Management, Contractor and Park Manager or park representative before final invoice shall be paid.
6) The Contractor shall protect areas adjacent to his work and shall be required to repair any damage they may cause. The Contractor shall protect work of other trades. The
Contractor shall correct any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by Facilities Management. The Contractor shall leave residences and other buildings in a habitable manner after hours by securing unfinished openings.
7) Workmanship shall be warrantied for not less than one (1) year from date of final inspection. Materials shall be warrantied as per manufacturer’s warranty.
8) Unless otherwise indicated, all materials, equipment, and supplies shall be new and in good condition, UL listed when applicable, and all work accomplished in a manner acceptable to Facilities Management.
9) Clean up of the project site shall be the responsibility of the Contractor. The Contractor shall assure that job site is clean of nails, debris, etc., at end of each day to ensure safety. The Contractor shall clean up and haul away all scrap when work is completed to an approved location off state property.
Greenfield, Tennessee 38230
10) At all times, the Contractor shall have a copy of project specifications, permits, and
Certificate of Insurance on-site.
11) The Contractors and all subcontractors are not authorized to day laborers or temporary labor on this project without the express written permission of Facilities Management.
12) Note: Before the Contract resulting from this Invitation to Bid is signed, the apparent successful proposer shall be registered with the Department of Revenue for the collection of Tennessee sales and use tax. The State shall not approve a Contract unless the proposer provides proof of such registration. The foregoing is a mandatory requirement of an award of a Contract pursuant to this solicitation.
13) Invoice shall be submitted for payment not before project completion and final project acceptance but also no later than ten (10) days after project completion and acceptance. A copy of the invoice shall be submitted to: Susan Blankenship 21540
Natchez Trace Road Wildersville, TN 38388 731-968-6608 susan.blankenship@tn.gov
14) Facilities Management Regional Contacts for this project are:
Facilities Construction Specialist 3: Roger Blankenship cell 731-307-9715 roger.blankenship@tn.gov
Assistant Director: Tim Stewart cell 615-741-4998 tim.stewart@tn.gov mailto:roger.blankenship@tn.gov
File details come from the government source that posted it. Updated .