The document is a bid detail report for Marion County Public Works, specifically for the Salmon Falls Park Habitat Enhancement Project (Contract #2025-350). The project aims to reestablish ecological and hydrological functions in a park area damaged by the 2020 Beachie Creek fire, with multiple bidders including North Santiam Paving Co, O'Malley Brothers Corporation, Paramount Ironworks, Bent LLC, and Siegmund Excavation & Construction Inc. The contract involves various environmental restoration activities such as erosion control, temporary seeding, wood chip pile removal, general excavation, and large woody debris (LWD) habitat restoration, with work scheduled to be completed by 03-06-2025.
The bid detail report shows significant variation in unit pricing among bidders, with total project costs ranging from $116,350 to $427,884. The most comprehensive bid appears to be from Siegmund Excavation & Construction Inc. at $427,884, which likely indicates a more extensive scope of work. Key line items include mobilization, temporary work access, erosion control, matting, hydromulch, turbidity monitoring, and habitat log pile installation. The project is focused on environmental restoration and habitat enhancement, with specific attention to mitigating fire damage and restoring ecological functions at the Salmon Falls County Park in Oregon.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OregonBuys - PW1615-25.pdf | ||
| Notice of Intent to Award Letter - PW1615-25~1.pdf | ||
| Q and A Presentation.pdf | ||
| PW1615-25 - Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH SANTIAM
PAVING CO
O'Malley Brothers Corporation
Paramount Ironworks BENT LLCSIEGMUND
EXCAVATION &
CONSTRUCTION
INC
UNIT UNIT UNIT UNIT UNIT
03-06-2025 Page 1
2025-350CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SALMON FALLS PARK
1PROJECT #: 0
1.00 16000.000 16000.00 110000.000 110000.0025000.000 25000.0017500.000 17500.0043000.000 43000.00MOBILIZATION210.100
1.00 13280.000 13280.00 75000.000 75000.003950.000 3950.0010000.000 10000.0015000.000 15000.00TEMPORARY WORK ACCESS AND
CONTAINMENT
253.100
1.00 12500.000 12500.00 6500.000 6500.0010556.000 10556.007500.000 7500.0015000.000 15000.00EROSION CONTROL280.100
280.00 6.750 1890.00 7.500 2100.008.800 2464.0032.500 9100.009.000 2520.00MATTING, TYPE A280.582
1.60 3000.000 4800.00 3740.000 5984.008481.250 13570.008000.000 12800.003300.000 5280.00TEMPORARY MULCHING, HYDROMULCH
280.700
1.00 1200.000 1200.00 500.000 500.007500.000 7500.002500.000 2500.00200.000 200.00POLLUTION CONTROL PLAN290.100
1.00 3000.000 3000.00 1500.000 1500.005000.000 5000.0010000.000 10000.002500.000 2500.00TURBIDITY MONITORING290.190
220.00 17.500 3850.00 85.000 18700.0085.000 18700.0024.500 5390.0040.000 8800.00WOOD CHIP PILE REMOVAL (AND
DISPOSE ONSITE)
320.210
1260.00 35.500 44730.00 131.000 165060.00131.000 165060.0024.500 30870.0032.000 40320.00GENERAL EXCAVATION (AND
DISPOSE ONSITE)
330.110
1.60 5750.000 9200.00 6900.000 11040.004940.000 7904.006500.000 10400.003800.000 6080.00TEMPORARY SEEDING, REGREEN1030.252
7.00 500.000 3500.00 3000.000 21000.00300.000 2100.008500.000 59500.00400.000 2800.00LWD APEX LOG JAM1091.050
3.00 800.000 2400.00 3500.000 10500.00300.000 900.005000.000 15000.00400.000 1200.00LWD HABITAT LOG PILE1091.060
116,350.00 142,700.00 190,560.00 262,704.00 427,884.00PROJECT SUBTOTAL:
116,350.00 142,700.00 190,560.00 262,704.00 427,884.00CUMULATIVE TOTAL:
116,350.00 142,700.00 190,560.00 262,704.00 427,884.00CONTRACT TOTAL:
CONTRACT #: 2025-350 PROJECT #: 1 SALMON FALLS PARK