About this file
This Bidders Instructions document is issued by the Massachusetts National Guard for the Taunton Readiness Center Fence Installation project (FMO26282). The project involves the installation of a new security fence at the Taunton Readiness Center facility. Bidders must submit sealed bids in response to the solicitation, with specific instructions regarding bid preparation, submission procedures, and documentation requirements. A pre-bid site visit and bidders' conference are scheduled to allow potential contractors to view the project site and clarify specifications. All bids must be received by the stated deadline, with award anticipated following evaluation of compliant submissions. The contract will cover the complete design and installation of the fence system in accordance with the project specifications and drawings provided in the solicitation documents.
Pricing shall be submitted on a lump-sum basis for the complete fence installation project. Bidders are required to provide detailed cost breakdowns, proof of insurance, and evidence of contractor licensing and qualifications. The solicitation specifies any applicable preferences or set-asides, if applicable under Massachusetts procurement regulations. All work must comply with prevailing wage requirements and applicable state and federal regulations. The funding source is the Massachusetts National Guard budget allocated for facility improvements and maintenance at the Taunton Readiness Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Real ID Requirements_final~32.pdf | ||
| AuthorizedSignatory~87.pdf | ||
| Non-Collusion 1~40.pdf | ||
| ARN43787-ATP_3-39.32-001-WEB-2.pdf | ||
| Wage Rate Instructions_new~43.pdf | ||
| UFC_4-022-03.pdf | ||
| Addendum Form 1.docx | DOCX document | |
| FMO26282 FORM FOR GENERAL BID.docx | DOCX document | |
| Taunton Fence Installation FMO26282 SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maura Healey Governor
Kim Driscoll Lieutenant Governor
KARYN E. POLITO
The Commonwealth of Massachusetts
Executive Office of Public Safety & Security
Military Division 2 Randolph Road
Hanscom AFB, Massachusetts 01731-3001 Tel: (339) 202-3900 www.mass.gov/guard
Gina K. Kwon Secretary of Public Safety & Security
Major General Gary W. Keefe The Adjutant General
June 10, 2026
FMO26282 Taunton Armory Fence Repair
Bidders Instructions
Concept: The Awarding Authority seeks a Limited User Contract to award one (1) contractor to perform a fence installation and all subsequent items in the included specifications
FMO26282 Taunton Armory Fence Repairs at 125 Gordon Owens Pkwy. Taunton, MA 02780.
Applicable Procurement Law: M.G.L. c. 149 44 A-J
Scope of Work: Proposal will include all labor, tools, and equipment necessary to complete the following Scope of Work:
Work will include but not be limited to:
Installation of front fence line at the Taunton Readiness Center, along with the installation of one pedestrian swing gate, one double swing gate, and one mechanical operating sliding gate. The boundary fence located along the front perimeter of Taunton
Readiness Center shall be newly installed in accordance with ATP 3-39.32 and
UFC_4_022_03 to meet the Army regulations for physical security.
Please refer to the Statement of Work forms included in the attachments section of the bid solicitation for more details regarding project scope/specifications.
Acquisition Method: Fee For Service. The Awarding Authority will discuss progress payments for the awarded project amount to be paid with Electronic Funds Transfer (EFT).
The Massachusetts Military Division is a tax-exempt entity. The awarded contractor will produce Liability Insurance information naming the Commonwealth as additionally insured prior to work commencing.
Wages: Prevailing wages will be required for this project. Certified payroll is required prior to progress or final payment.
Insurance: The awarded contractor will be responsible for producing a certificate of liability insurance, naming the MA National Guard as additionally insured.
A Payment Bond to the amount of 50% of the project value will also be required should the project value exceed $25,000. Payment Bonds and Performance Bonds in the amount of 100% of the project cost will be required for bids over $150K. Contractors are advised to include the costs of such a bond in their quotes.
Site Visit: A site visit is mandatory for all participating contractors. A site visit has been scheduled for Thursday June 19 at 12:30PM. Interested contractors should email Jimmy
Pereira at jimmy.pereira2.nfg@army.mil to announce their intent to attend.
Bid Submission: Participating vendors shall submit a completed General Bid Form with a lump sum cost for the project scope of work. A 5% bid bond must accompany a completed general bid form.
Only electronic quotes submitted via COMMBUYS will be accepted in response to this ITB.
Responses must be sent via the “Create Quote” functionality in COMMBUYS.
Additional statutory forms to be included are the Commonwealth Authorized Signatory and
Non- Collusion Forms.
Contractors with questions can submit them via email to the contracting officer Nick Haddad at nicholas.haddad@mass.gov. Responses to questions will come in the form of an addendum, posted in the CommBuys solicitation prior to the bid closing date.
It is the Bidder’s responsibility to verify receipt of questions. It is the responsibility of the prospective Bidder and awarded Contractor to maintain an active registration in COMMBUYS and to keep current the email address of the Bidder’s contact person and prospective contract manager, if awarded a contract, and to monitor that email inbox for communications from the
Purchasing Department, including requests for clarification. The Purchasing Department and the Commonwealth assume no responsibility if a prospective Bidder’s/awarded Contractor’s designated email address is not current, or if technical problems, including those with the prospective Bidder’s/awarded Contractor’s computer, network, or internet service provider
(ISP) cause email communications sent to/from the prospective Bidder/Awarded contractor and the Purchasing Department to be lost or rejected by any means including email or spam filtering. Bidders may not rely upon oral communications or interpretations from the Awarding
Authority or the Designer and the Awarding Authority shall not be bound by them.
Bid due date: Bids will be submitted electronically on www.commbuys.com no later than
Thursday June 25 at 10:00AM with an award from the Awarding Authority immediately following. A lump sum bid will be evaluated using M.G.L. c. 149 by the Awarding Authority.
Estimated Procurement Calendar:
Announcement of Intent to Procure: June 10
Bid Release Date: June 10
Site Visit Date: June 18 (12:30PM)
Deadline for Quotes/Bid Responses: June 25 (10:00AM)
Notification of Apparent Successful Bidders: June 30
Estimated Contract Start Date : July 13 mailto:jimmy.pereira2.nfg@army.mil mailto:nicholas.haddad@mass.gov http://www.commbuys.com/
Pay Discount (PPD): Prompt Payment Discounts negotiated with OSD at the time of the TRD
Contract award will be applicable for this project. All discounts offered will be taken in cases where the payment issue date is within the specified number of days listed by vendor and in accordance with the Commonwealth’s Bill Paying Policy. Payment days will be measured from the date an invoice is received by the Commonwealth. The date of payment “issue” occurs when the invoice is processed and scheduled by the Awarding Authority Accounts
Payable department. EFT arrival dates can vary from bank to bank. The length of time a bank takes to accept an EFT is not something an Awarding Authority has control over.
Pursuant to M.G.L. 30, §39S(a) (2) all employees to be employed on the project must have successfully completed a course in construction safety and health approved by OSHA and of at least 10 hours in duration.
The Contractor must provide written verification as detailed in the General Conditions at
Article X, of compliance with Massachusetts and federal laws with respect to the employment of workers and Federal Department of Homeland Security Requirements, including, but not limited to, the Employment Eligibility Verification (Form I-9) Process.
SECTION I - BIDDER'S REPRESENTATION
Each general bidder or sub-bidder (hereinafter sometimes referred to as "Bidder) by making a bid or sub-bid (hereinafter sometimes referred to as "Bid") represents and warrants that Bidder has visited and examined the Site and the Contract Documents, that Bidder is familiar with the local conditions under which the Work is to be performed, that Bidder has correlated personal observations with the requirements of the Contract Documents, and that where the Contract
Documents require, in any part of the Work, a given result to be produced, the Contract
Documents are adequate and that Bidder will produce the required result within the Bid price and that the Bid is made in accordance therewith.
Failure to so examine the Contract Documents and the Site will not relieve any Bidder from any obligation under the Bid as submitted. Neither the Commonwealth nor the Designer will be responsible for errors, omissions and/or charges for extra work arising from Bidder's failure to familiarize itself with the Contract Documents or existing conditions.
It is the sole responsibility of the Bidder to ascertain the existence of any addenda issued by the
Awarding Authority, whether or not the same are received by the Bidder.
PREPARATION OF BIDS; ALTERNATES
Where so indicated on the bid form, sums shall be expressed in both words and numerals.
Where there is a discrepancy between the Bid sum expressed in words and the Bid sum expressed in figures, the Bid sum expressed in words shall control unless the intention of the
Bidder clearly is otherwise as determined by the Awarding Authority in its sole discretion.
Each General Bidder shall acknowledge all required alternates in Part C on the Form for
General Bid by entering the dollar amount of addition or subtraction necessitated by each alternate. General Bidders shall enter on the Form for General Bid a single amount for each alternate that shall consist of the sub-bidders' amounts and the amount for work performed by the General Bidder.
The lowest Bidder will be determined on the basis of the sum of the base Bid and the alternates accepted by the Awarding Authority.
The applicable minority workforce utilization percentage is 15.3 %.
The applicable women workforce utilization percentage is 6.9 %.
CONTRACT AWARD
"Award" means the determination, selection, and notification of the lowest, responsible and eligible Bidder by the Awarding Authority.
The Awarding Authority will award the Contract within thirty days, Saturdays, Sundays, and legal holidays excluded after the opening of Bids in accordance with M.G.L. c.149 §44A.
The Contract will be awarded to the lowest responsible and eligible Bidder as determined by the Awarding Authority, except in the event of substitution as provided under M.G.L. c.l49, §§44E and 44F, in which cases the procedure as required by said sections shall govern the award of the Contract.
As used herein, the term "lowest responsible and eligible Bidder" shall mean the general bidder whose Bid is the lowest of those Bidders who, in the Awarding Authority's opinion, are ready, willing and able to comply with all requirements of the Contract Documents and demonstrably possess the skill, ability, and integrity necessary for the faithful performance of the Work, based on the determination of past performance and financial soundness under (i) M.G.L. c.l49
§44A and following sections, (ii) the rules, regulations, orders, guidelines and policies promulgated from time to time by the Commissioner of DCAMM and (iii) any other relevant criteria that the Commissioner may prescribe. If the Awarding Authority determines that any non-filed subcontractor chosen by a Bidder is not qualified or responsible, then the Bidder shall obtain another subcontractor satisfactory to Awarding Authority and the contract price shall not be adjusted.
The general bid price shall be the price set forth in paragraph C of the Form for General Bid.
No general Bid shall be rejected (i) because the sum of the prices set forth in Item 1 and 2 does not equal the general bid price set forth in said paragraph C or (ii) because of one or more errors in setting forth the name, the sub-bid price of a sub-bidder, or the total of Item 2, provided that the sub-bidder or sub-bidders designated are clearly identifiable, or (iii) because the plans and specifications do not accompany the Bid or are not submitted with the Bid.
Should the Contract Documents require submission of special data to accompany the Bid, the
Awarding Authority reserves the right to rule the Bidder’s failure to submit such data an informality and to receive said data subsequently within a reasonable time as set by the
Awarding Authority, provided that no such ruling shall result in an unfair advantage to the
Bidder.
The Awarding Authority also reserves the right to reject any sub-bid if it determines that such sub-bid does not represent the Bid of a person competent to perform the work as specified, or if fewer than three sub-bids are received for a sub-trade and the Bid prices are not reasonable for acceptance without further competition.
If the Awarding Authority decides to reject all general bids or if the Awarding Authority does not receive any general bids, the Awarding Authority may retain and use the sub-bids received for a second opening of general bids; provided, however, that there are no changes in the work involved for the subtrades for which the sub-bids are so retained and used; and provided, further, that the Awarding Authority shall obtain the consent of each sub-bidder included in any award of a general Contract made pursuant to the second opening of general bids if such award is not made within ninety days, Saturdays, Sundays and legal holidays excluded, after the opening of such sub-bids.
EXECUTION OF CONTRACTS
If a selected filed sub-bidder fails, within five days, Saturdays, Sundays and legal holidays excluded, after presentation of a Subcontract by the general bidder to which the Contract was awarded, to perform its agreement to execute a Subcontract in the form provided by the
Awarding Authority with such general bidder contingent upon the execution of the general
Contract, and, if requested to do so by such general bidder in the general bid, to furnish a performance and a payment bond as stated in its filed sub-bid, such general bidder and the
Awarding Authority shall select from the other filed sub-bids duly filed with the Awarding
Authority for such subtrade and not rejected the lowest responsible and eligible filed sub-bidder at the amount named in its filed sub-bid as so filed against whose standing and ability the general Contractor makes no objection, and the Contract price shall be adjusted by the difference between the amount of such filed sub-bid and the amount of the sub-bid of the delinquent filed sub-bidder.
Upon receipt of the Award, the general bidder awarded the Contract shall immediately submit properly executed originals of each of the following documents prior to execution of the
Contract by the Awarding Authority. All such documents shall be in the form prescribed by the
Awarding Authority.
-Owner-Contractor Agreement
-Certificate of Corporate Vote
-Certificate of Compliance with State Tax Laws and with Unemployment Compensation
-Performance and Payment Bonds with power of attorney attached
-Certificates of Insurance evidencing coverages in amounts required by the Contract
Documents
-Any other documents that the Awarding Authority may reasonably require in connection with the Contractor's execution of the Contract.
Please note that no part of the General Contractor's work may be subcontracted without the prior written approval of the Awarding Authority. If the General Contractor desires to subcontract any part of the Work, other than work covered by Item 2, filed sub-bidders, the
General Contractor must promptly forward to the Awarding Authority a list in triplicate designating the work to be performed and the name of each proposed subcontractor for approval by the Awarding Authority. Approved subcontractors are eligible for direct payments under M.GL. 30, § 39F, as amended. Material suppliers not involving site labor need not be submitted for approval.
ATTACHMENT A
PREVAILING WAGE SCHEDULE
The minimum wage rates provided in the following pages have been provided by the
Department of Labor Standards of the Massachusetts Department of Labor and Workforce
Development and also include the most recent Davis Bacon and Related Acts Wage Rates from www.sam.gov. The Awarding Authority is not responsible for errors or omissions in such http://www.sam.gov/ wage rates. Prevailing Wage Schedules will be updated annually through the duration of the project.
M.G.L. c. 149, §§ 26 and 27 provide as follows:
". . . Payments by employers to health and welfare plans, pension plans and supplementary unemployment benefit plans under collective bargaining agreements or understandings between organized labor and employers shall be included for the purpose of establishing minimum wage rates as herein provided.
. . . The aforesaid rates of wages in the schedule of wage rates shall include payments by employers to health and welfare plans, pension plans and supplementary unemployment benefit plans as provided in said section twenty-six, and such payments shall be considered as payments to persons under this section performing work as herein provided. Any employer engaged in the construction of such works who does not make payments to a health and welfare plan, a pension plan and a supplementary unemployment benefit plan, where such payments are included in said rates of wages, shall pay the amount of said payments directly to each employee engaged in said construction"
Mass General Laws c. 149, §27, as amended on August 8, 2008 requires annual updates to prevailing wage schedules for all public construction projects lasting longer than one year. The
Contractor is required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The Contractor and all Subcontractors are required to anticipate such annual updated prevailing wage schedules and neither the Contractor nor any
Subcontractors shall be entitled to claim additional compensation for base contract work due to updated prevailing wage schedules.
The minimum wage rates issued by the Department of Labor Standards for this and all other projects are project specific and the rates provided in this bid package and those provided as annual updates for this project will govern the prevailing wages for this project. For general informational purposes contractors and subcontractors may obtain sample current prevailing wage rates for different locations in Massachusetts by accessing the DLS website at www.mass.gov/dols/pw and requesting an “example” copy of a prevailing wage schedule.
MIL requires submission of weekly certified payroll.
File details come from the government source that posted it. Updated .