This is a Bidder Questions & Answers document for Michigan's Department of Transportation (MDOT) RFP 260000002057 concerning Winter Maintenance Truck Components. The solicitation addresses the procurement of pre-wet systems and associated components for MDOT winter maintenance trucks, including hydraulic systems, pumps, motors, flow meters, nozzle kits, and liquid tanks. The document provides clarifications on nine key specifications and requirements, establishing that vendors must supply controllers for ground speed-controlled pre-wet systems, with hydraulic motors directly coupled to pumps meeting Model 4211-035 PENTAIR specifications. Tank requirements specify existing MDOT part numbers (PN 00012640 for 100-gallon and PN 00012641 for 75-gallon units) that must fit both combination bodies and slide-in material spreaders.
Critical specifications include mandatory stainless steel hydraulic lines with bulkhead fittings (zinc plated alternatives are not acceptable), discharge-side strainers with optional suction-side additions, and Dickey-John flow meters or acceptable alternatives such as Micro track FM500/Turbine units. The document confirms that pre-wet electric controls with 15-amp drivers will be controlled by the vendor-supplied controller rather than existing truck controllers. Tank kits must include one-piece stainless steel trays mounted to slide-in hopper assemblies, and nozzles may be provided with or without steel guards at vendor discretion. These specifications establish baseline requirements for bidders responding to the winter maintenance truck components solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Specifications.xlsx | XLSX spreadsheet | |
| Confidential Treatment Form.docx | DOCX document | |
| Schedule B - Pricing.xlsx | XLSX spreadsheet | |
| Proposal Instructions.docx | DOCX document | |
| Amendment 1.docx | DOCX document | |
| Standard Contract Terms.docx | DOCX document | |
| Schedule C - Insurance Requirements.docx | DOCX document | |
| Schedule A - Statement of Work.docx | DOCX document | |
| Schedule D - Service Level Agreement.docx | DOCX document | |
| Vendor Questions Worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
BIDDER QUESTIONS & ANSWERS
RFP: 260000002057
Winter Maintenance Truck Components Bidders who have questions for the above Solicitation must fill the sections below and attach the document in an email to the Solicitation Manager, as described in the Instruction to Bidders.
| Q # |
| Document and Section |
| Page # |
| Bidder Question |
| Answer (to be completed by the State) |
| 1 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Basic Requirements, 1.1 |
| Clarification: Units shall provide a ground speed controlled pre-wet systems to be mounted on MDOT winter maintenance trucks |
Question: Is a controller needed or will truck already have a viable controller?
Controller is needed. Will be required to be supplied by vendor.
| 2 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Basic Requirements, 1.2 |
| Clarification: Pre-wet liquid pump shall be directly coupled to the hydraulic motor |
Question: Will A coupled pump/motor be accepted?
Yes. As long as the pump meets the requirements. Model 4211-035 PENTAIR
| 3 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Basic Requirements, 1.6 |
| Clarification: A Dickey-John flow meter shall also be mounted in the enclosure. |
Question: Will A Micro track FM500 / Turbine be accepted?
Yes
| 4 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Basic Requirements, 1.7 |
| Clarification: Stainless steel hydraulic lines for the pump motor shall be plumbed to bulkhead fittings mounted on the side of the enclosure. |
Question: Will Zinc Plated be accepted?
No
| 5 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Basic Requirements, 1.9 |
| Clarification: Prewet electric controls including 15amp driver and all necessary cables. |
Question: Per the controller Spec, will this not be controlled with an existing controller?
Will be controlled by controller provided by WMT components vendor
| 6 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Nozzle Kit, 2.3 |
| Clarification: Strainers shall be included in line in the discharge lines. |
Question: Will Strainer on Suction side be accepted?
Strainer has to be on discharge side, but an additional is acceptable on suction side.
| 7 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Nozzle Kit, 2.4 |
| Clarification: Stainless steel guards to be installed with the nozzles. |
Question: Can you please supply specs for this?
Nozzles can come with or without steel guards
| 8 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Liquid Tanks, 3.6 |
| Clarification: Tanks shall fit existing MDOT combination bodies and slide in material spreaders. |
Question: Please send drawings so we can verify Tanks currently used: PN 00012640 100 gallon PN 00012641 75 gallon
| 9 |
| Attachment 1 – Specifications |
| Section 4 - Pre-Wet Systems – Liquid Tanks, 3.11 |
| Clarification: Tank kits for the combination bodies and the slide in bodies shall include a one (1) piece stainless steel tray that is as long as the tank |
Question: IS the required if our tank does not need them? If so, please supply a spec / drawing Yes. The tanks will need to be mounted to a slide-in hopper assembly.