The document is a bid tabulation and quantities spreadsheet for the City of Pasadena's Annual Citywide Street Resurfacing and ADA Improvement Program for Fiscal Years 2023 and 2024. The spreadsheet details comprehensive road improvement work across 23 different streets, including treatments such as full width milling, microsurfacing, overlay, crack sealing, and various concrete repairs. The project involves multiple street segments throughout Pasadena, with specific quantities listed for each street, including asphalt quantities (in tons), linear feet of key cutting, sidewalk and curb replacements, ADA improvements, traffic control, and additional infrastructure enhancements like adjusting manholes, valves, and installing traffic loops and pavement markers.
The bid tabulation provides granular details on quantitative requirements for each street segment, with total citywide quantities summarized at the bottom of the document. Work includes surface treatments ranging from 6,900 to 264,000 square feet per street segment, with additional specifications for dig-out locations, concrete replacements, and miscellaneous infrastructure improvements. The project appears to be a comprehensive urban infrastructure renewal effort, with multiple construction and rehabilitation techniques applied across various streets to improve road conditions, accessibility, and traffic infrastructure. The spreadsheet serves as a detailed accounting of expected work volumes, which would be critical for potential contractors in preparing accurate bids and understanding the full scope of the municipal improvement project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TREATMENT STREET AREA
COLD PLAN 2"
AC
ARHM GG-
D PG 64-16
AC D2 PG 64-10
(1/2"
LEVELING)
DOUBLE
MICROSURF
ACING WITH
BLACK
ROCK AND
CRACK
SEAL
KEYCUT
(5'; 1-3/4")
KEYCUT
(12'; 1-
3/4")
DIG-OUT REMOVE &
REPLACE 4" AC
R&R
SIDEWALK
R&R CURB &
GUTTER
R&R CURB
ONLY
R&R GUTTER
ONLY
R&R DWY
APRON
R&R
SPANDREL
R&R CROSS
GUTTER
ADA
CURB
RAMP
REMOVE & INSTALL
NEW DETECTABLE
"CAST-IN-PLACE"
DETECTABLE
WARNING SURFACE
(3'X4') PER CITY OF
PASADENA STD S414
REMOVE &
REPLACE
CL TIE
MONUMENT
REMOVE &
REPLACE
SURVEY
MONUMENT
REMOVE &
REPLACE
BENCHMARK
R&R CURB
DRAIN
(INCLUDING
R&R
HARDSCAPE,
PARKWAY,
AND ETC TO
COMPLETE
THE WORK)
ADJUST SSMH/
SDMH/TELEPHON
MH TO GRADE
ADJUST
WATER/GAS
VALVE TO
GRADE
TRAFFIC
CONTROL
STORM WATER
POLLUTION
PREVENTION
PLAN - BMP
MOBILIZATION,
BONDS, INSURANCE &
CONSTRUCTION AND
DEMOLITION (C&D)
ADMINISTRATION FEE
REMOVE &
INSTALL SPEED
HUMP PER
PASADENA
STANDDARD
PLAN S-707
REMOVE &
INSTALL
PERMANENT
TRAFFIC LOOP
INSTALL
RPMs
SANDBLASTING
EXISTING STRIPING
(STOP
BAR/CROSSWALK/)
PER PLAN
SANDBLASTING
EXISTING STRIPING
(STOP OR WORD
PAVEMENT OR
ARROW MARKING)
PER PLAN
12" LIMIT
WHITE LINE
(STOP LINE
THERMO)/ 12"
WHITE LINE
PAVEMENT
MARKINGS
CROSSWALK -
YELLOW OR WHITE
PER PLAN
(THERMO)
PAVEMENT
MARKINGS
WORDS AND/OR
ARROW
(THERMO)
6" EDGELINES
/6" WHITE LEAD
IN/OUT LANE
LINE (THERMO)
SHARROW
PAVEMENT
MARKINGS
(THERMO)
6" WHITE
LANELINE
STRIPING -
THERMO &
MARKERS
8" WHITE LANE
DROP (A20C -
DETAIL 37B)
AND/OR 8" WHITE
CHANNELIZING
LINE (A20D -
DETAIL 38) -
THERMO &
MARKERS
NO PASSING ZONE -
TWO DIRECTION
(DOUBLE YELLOW
CENTER LINE - A20A
DETAIL 22) AND
MEDIAN ISLAND
(A20B DETAIL 29) -
THERMO & MARKERS
SKIP-DASH CENTERLINE
(A20A DETAIL 2 &
DETAIL 9- THERMO &
MARKERS)
Grind the asphalt to make it level with the concrete where it meets the asphalt on the current street (locations vary), and all miscellaneous item to complete this item
(SF) (SF) (TON) (TON) (TON) (LF) (LF) (SF) (SF) (LF) (LF) (SF) (SF) (SF) (SF) (EA) (EA) (EA) (EA) (EA) (EA) (EA) (EA) (LS) (LS) (LS) (EA) (EA) (EA) (LF) (EA) (LF) (SF) (EA) (LF) (EA) (LF) (LF) (LF) (LF) (SF)
ARDEN ROAD
(From Lake Ave to
Rosalind Road)
BIRCH LANE
(From Kirkwood Ave to
Cul-De-Sac)
CATALINA AVE
(From Elizabeth St to
Washington Blvd)
CHURCH ST
(From Ave 64 to Brentnal
Road)
EL NIDO AVE
(From Del Mar Blvd to
San Pasqual St)
ELM LANE
(From Birch Lane to
South Lane)
EUCALYPTUS LANE
(From Kirkwood Ave to
Kirdwood Ave)
GLORIETA ST
(From Sunset Ave to
Morton Ave)
HOWARD ST
(From Lake Ave to
Catalina Ave)
KIRKWOOD AVE
(From Hammond St to
South End)
LINDA VISTA AVE
(From Wabash St to Holy
St)
MAGNOLIA AVE
(From California Ave to
Alpine St)
POPLAR LANE
(From Kirkwood Ave to
West End)
RIO GRANDE ST
(From Catalina Ave to
Mar Vista Ave)
SALVIA CANON ROAD
(From Linda Vista Ave to
West Drive)
SAN JUAN PLACE
(From San Pasqual St to
North End)
LAS LUNAS ST
(From Palo Verde Ave to
N. Oak Ave)
PALOS VERDE AVE
(From E. Villa St to E.
Orange Grove Blvd)
N OAK AVE
(From E Villa St to E.
Orange Grove Blvd)
MONTE VISTA ST
(From N. Allen Ave to N.
Oak Ave)
SPRUCE LANE
(From North End to
South End)
SUNSET AVE
(From Washington Blvd to Hammond St)
CITYWIDE - DIG OUT
LOCATIONS
4,000 4,000 1,500 600 600 4,000 1 2 1 1 5 1 1 1 3 1 4,000 7,000 2,000 3,000 4,000
TOTAL = 1,168,355 339,045 17,281 5,106 3,641 78,755 3,650 47,399 39,067 5,878 1,200 1,836 6,263 780 854 42 10 2 17 2 4 178 163 1 1 1 26 25 20 54,129 111 5,553 34,780 111 41,092 16 27,840 3,948 34,932 8,400 4,000
5 200 55 15 1004,966 1,265 320 50 50 90
1 20 1
FULL WIDTH
MILL
22 48,000 48,000 780 195
4 2 20130 1,655 85
1 115 4 4
MICROSURF
ACING
21 19,800 358 1,300
50 50 1 1 6 62,205 100 20 100 200
MICROSURF
ACING
20 73,549 1,328 4,082 300
2 46 2 13 250 50 7 1 4 31,900 150 20 50 100
MICROSURF
ACING
19 40,918 739 3,380 300
3 2 1 85 4100 100 300 50 50 0451 3,125 420 580 200
OVERLAY &
MICROSURF
ACING
18 40,231 249 62
0 0 33 1 10
OVERLAY 17 40,000 650 163 2,132 300
4 3 1 20 1 2060 200 70 105 2
8 4,000 200 2,500 2,900
MICROSURF
ACING
16 19,600 354 1,820
4 10,000 25 300 25 8,6007,800 345 2,083 355 6
2,870 4 40 8,140 4
OVERLAY 15 110,800 1,801 450
20 2 4 1 2
2 2
FULL WIDTH
MILL
14 24,000 24,000 390 98 423 265
70 16 225 52 1OVERLAY 13 8,500 138 35 1,300
5 1 80 5 80 5330 65 6 10
1,030 26,250
OVERLAY 12 84,000 1,365 341 6,500 65 7,115
300 12,800 30 25,600 8 19,20056 55 8 20 38,400 3020 5 5300 7,550 634
80 4
OVERLAY 11 264,000 4,290 1,073 23,400
8 10 80 41,385 170
OVERLAY 10 45,600 741 185 3,640 220 4,680
3 2 2 20 1 201,976 1,220 46 600 269 2
FULL WIDTH
MILL
9 22,440 22,440 365 91
2 40 2 40 25 62,340 351 2,000 155
5 1
OVERLAY 8 27,000 439 110
2,340 91 5,330 200 538OVERLAY 7 32,500 528 132
60 510 25 1 2
100 2 40 2 60
MICROSURF
ACING
6 6,900 125 650
10 6 5 6
2 3
FULL WIDTH
MILL
5 65,000 65,000 1,056 264 803 59
6,338 50 1
FULL WIDTH
MILL
4 15,875 15,875 258 64
100 4,840 12 0 1002 2 4 1,820 121 2 1 4 106,977 1,400 50 40 30 107
FULL WIDTH
MILL
3 82,050 82,050 1,333 333
2 2 2
1,100
MICROSURF
ACING
2 15,912 287 1,820 30 555 357
300 2,000 8 60 2003 19 25 4 300 8500 457 3 1 13,497 3,953 252 170 153
FULL WIDTH
MILL
1 81,680 81,680 1,327 332