The document is a bid tabulation and quantities spreadsheet for the City of Pasadena's Annual Citywide Street Resurfacing and ADA Improvement Program for Fiscal Years 2023 and 2024. The spreadsheet details comprehensive road improvement work across 23 different streets, including treatments such as full width milling, microsurfacing, overlay, crack sealing, and various concrete repairs. The project involves multiple street segments throughout Pasadena, with specific quantities listed for each street, including asphalt quantities (in tons), linear feet of key cutting, sidewalk and curb replacements, ADA improvements, traffic control, and additional infrastructure enhancements like adjusting manholes, valves, and installing traffic loops and pavement markers.

The bid tabulation provides granular details on quantitative requirements for each street segment, with total citywide quantities summarized at the bottom of the document. Work includes surface treatments ranging from 6,900 to 264,000 square feet per street segment, with additional specifications for dig-out locations, concrete replacements, and miscellaneous infrastructure improvements. The project appears to be a comprehensive urban infrastructure renewal effort, with multiple construction and rehabilitation techniques applied across various streets to improve road conditions, accessibility, and traffic infrastructure. The spreadsheet serves as a detailed accounting of expected work volumes, which would be critical for potential contractors in preparing accurate bids and understanding the full scope of the municipal improvement project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TREATMENT STREET AREA

COLD PLAN 2"

AC

ARHM GG-

D PG 64-16

AC D2 PG 64-10

(1/2"

LEVELING)

DOUBLE

MICROSURF

ACING WITH

BLACK

ROCK AND

CRACK

SEAL

KEYCUT

(5'; 1-3/4")

KEYCUT

(12'; 1-

3/4")

DIG-OUT REMOVE &

REPLACE 4" AC

R&R

SIDEWALK

R&R CURB &

GUTTER

R&R CURB

ONLY

R&R GUTTER

ONLY

R&R DWY

APRON

R&R

SPANDREL

R&R CROSS

GUTTER

ADA

CURB

RAMP

REMOVE & INSTALL

NEW DETECTABLE

"CAST-IN-PLACE"

DETECTABLE

WARNING SURFACE

(3'X4') PER CITY OF

PASADENA STD S414

REMOVE &

REPLACE

CL TIE

MONUMENT

REMOVE &

REPLACE

SURVEY

MONUMENT

REMOVE &

REPLACE

BENCHMARK

R&R CURB

DRAIN

(INCLUDING

R&R

HARDSCAPE,

PARKWAY,

AND ETC TO

COMPLETE

THE WORK)

ADJUST SSMH/

SDMH/TELEPHON

MH TO GRADE

ADJUST

WATER/GAS

VALVE TO

GRADE

TRAFFIC

CONTROL

STORM WATER

POLLUTION

PREVENTION

PLAN - BMP

MOBILIZATION,

BONDS, INSURANCE &

CONSTRUCTION AND

DEMOLITION (C&D)

ADMINISTRATION FEE

REMOVE &

INSTALL SPEED

HUMP PER

PASADENA

STANDDARD

PLAN S-707

REMOVE &

INSTALL

PERMANENT

TRAFFIC LOOP

INSTALL

RPMs

SANDBLASTING

EXISTING STRIPING

(STOP

BAR/CROSSWALK/)

PER PLAN

SANDBLASTING

EXISTING STRIPING

(STOP OR WORD

PAVEMENT OR

ARROW MARKING)

PER PLAN

12" LIMIT

WHITE LINE

(STOP LINE

THERMO)/ 12"

WHITE LINE

PAVEMENT

MARKINGS

CROSSWALK -

YELLOW OR WHITE

PER PLAN

(THERMO)

PAVEMENT

MARKINGS

WORDS AND/OR

ARROW

(THERMO)

6" EDGELINES

/6" WHITE LEAD

IN/OUT LANE

LINE (THERMO)

SHARROW

PAVEMENT

MARKINGS

(THERMO)

6" WHITE

LANELINE

STRIPING -

THERMO &

MARKERS

8" WHITE LANE

DROP (A20C -

DETAIL 37B)

AND/OR 8" WHITE

CHANNELIZING

LINE (A20D -

DETAIL 38) -

THERMO &

MARKERS

NO PASSING ZONE -

TWO DIRECTION

(DOUBLE YELLOW

CENTER LINE - A20A

DETAIL 22) AND

MEDIAN ISLAND

(A20B DETAIL 29) -

THERMO & MARKERS

SKIP-DASH CENTERLINE

(A20A DETAIL 2 &

DETAIL 9- THERMO &

MARKERS)

Grind the asphalt to make it level with the concrete where it meets the asphalt on the current street (locations vary), and all miscellaneous item to complete this item

(SF) (SF) (TON) (TON) (TON) (LF) (LF) (SF) (SF) (LF) (LF) (SF) (SF) (SF) (SF) (EA) (EA) (EA) (EA) (EA) (EA) (EA) (EA) (LS) (LS) (LS) (EA) (EA) (EA) (LF) (EA) (LF) (SF) (EA) (LF) (EA) (LF) (LF) (LF) (LF) (SF)

ARDEN ROAD

(From Lake Ave to

Rosalind Road)

BIRCH LANE

(From Kirkwood Ave to

Cul-De-Sac)

CATALINA AVE

(From Elizabeth St to

Washington Blvd)

CHURCH ST

(From Ave 64 to Brentnal

Road)

EL NIDO AVE

(From Del Mar Blvd to

San Pasqual St)

ELM LANE

(From Birch Lane to

South Lane)

EUCALYPTUS LANE

(From Kirkwood Ave to

Kirdwood Ave)

GLORIETA ST

(From Sunset Ave to

Morton Ave)

HOWARD ST

(From Lake Ave to

Catalina Ave)

KIRKWOOD AVE

(From Hammond St to

South End)

LINDA VISTA AVE

(From Wabash St to Holy

St)

MAGNOLIA AVE

(From California Ave to

Alpine St)

POPLAR LANE

(From Kirkwood Ave to

West End)

RIO GRANDE ST

(From Catalina Ave to

Mar Vista Ave)

SALVIA CANON ROAD

(From Linda Vista Ave to

West Drive)

SAN JUAN PLACE

(From San Pasqual St to

North End)

LAS LUNAS ST

(From Palo Verde Ave to

N. Oak Ave)

PALOS VERDE AVE

(From E. Villa St to E.

Orange Grove Blvd)

N OAK AVE

(From E Villa St to E.

Orange Grove Blvd)

MONTE VISTA ST

(From N. Allen Ave to N.

Oak Ave)

SPRUCE LANE

(From North End to

South End)

SUNSET AVE

(From Washington Blvd to Hammond St)

CITYWIDE - DIG OUT

LOCATIONS

4,000 4,000 1,500 600 600 4,000 1 2 1 1 5 1 1 1 3 1 4,000 7,000 2,000 3,000 4,000

TOTAL = 1,168,355 339,045 17,281 5,106 3,641 78,755 3,650 47,399 39,067 5,878 1,200 1,836 6,263 780 854 42 10 2 17 2 4 178 163 1 1 1 26 25 20 54,129 111 5,553 34,780 111 41,092 16 27,840 3,948 34,932 8,400 4,000

5 200 55 15 1004,966 1,265 320 50 50 90

1 20 1

FULL WIDTH

MILL

22 48,000 48,000 780 195

4 2 20130 1,655 85

1 115 4 4

MICROSURF

ACING

21 19,800 358 1,300

50 50 1 1 6 62,205 100 20 100 200

MICROSURF

ACING

20 73,549 1,328 4,082 300

2 46 2 13 250 50 7 1 4 31,900 150 20 50 100

MICROSURF

ACING

19 40,918 739 3,380 300

3 2 1 85 4100 100 300 50 50 0451 3,125 420 580 200

OVERLAY &

MICROSURF

ACING

18 40,231 249 62

0 0 33 1 10

OVERLAY 17 40,000 650 163 2,132 300

4 3 1 20 1 2060 200 70 105 2

8 4,000 200 2,500 2,900

MICROSURF

ACING

16 19,600 354 1,820

4 10,000 25 300 25 8,6007,800 345 2,083 355 6

2,870 4 40 8,140 4

OVERLAY 15 110,800 1,801 450

20 2 4 1 2

2 2

FULL WIDTH

MILL

14 24,000 24,000 390 98 423 265

70 16 225 52 1OVERLAY 13 8,500 138 35 1,300

5 1 80 5 80 5330 65 6 10

1,030 26,250

OVERLAY 12 84,000 1,365 341 6,500 65 7,115

300 12,800 30 25,600 8 19,20056 55 8 20 38,400 3020 5 5300 7,550 634

80 4

OVERLAY 11 264,000 4,290 1,073 23,400

8 10 80 41,385 170

OVERLAY 10 45,600 741 185 3,640 220 4,680

3 2 2 20 1 201,976 1,220 46 600 269 2

FULL WIDTH

MILL

9 22,440 22,440 365 91

2 40 2 40 25 62,340 351 2,000 155

5 1

OVERLAY 8 27,000 439 110

2,340 91 5,330 200 538OVERLAY 7 32,500 528 132

60 510 25 1 2

100 2 40 2 60

MICROSURF

ACING

6 6,900 125 650

10 6 5 6

2 3

FULL WIDTH

MILL

5 65,000 65,000 1,056 264 803 59

6,338 50 1

FULL WIDTH

MILL

4 15,875 15,875 258 64

100 4,840 12 0 1002 2 4 1,820 121 2 1 4 106,977 1,400 50 40 30 107

FULL WIDTH

MILL

3 82,050 82,050 1,333 333

2 2 2

1,100

MICROSURF

ACING

2 15,912 287 1,820 30 555 357

300 2,000 8 60 2003 19 25 4 300 8500 457 3 1 13,497 3,953 252 170 153

FULL WIDTH

MILL

1 81,680 81,680 1,327 332