Bid Tab Sheet (Unofficial)
85 KB Posted
- Attached to
- Hays State Prison Underground Heating Loop Repl.
- Solicitation number
- GDC-21-HAYS-SP-016
- Issued by
- Georgia
About this file
This is an unofficial Bid Tab Sheet for the Hays State Prison Underground Heating Loop Replacement project, administered by the Georgia State Financing and Investment Commission (GSFIC) on behalf of the Georgia Department of Corrections. The project involves replacing the underground heating loop and associated pumps at Hays State Prison, including heating water supply and return piping, domestic water piping, and PVC insulation jacketing on existing piping systems within the Central Energy Plant building. The base bid encompasses piping work extending from station HW6+74.88 to station HW15+12.94 and connections to Units F, G, H, and J, along with rock excavation and unsuitable soil removal services priced on a unit basis for work exceeding 150 cubic yards included in the base bid. The bid opening occurred on March 24, 2023 at 2:00 PM.
Two bidders submitted proposals: Mann Mechanical Company, Inc. (contact: John Kraus, jkraus@mannmechanical.com) and Martin Mechanical Contractors, Inc. (contact: Jack Dunagan, jdunagan@martinmechanical.com). Mann Mechanical Company submitted a base bid total of $2,241,119.00 with additive alternates totaling $4,851,151.00, yielding a combined project cost of $7,092,270.00. Martin Mechanical Contractors submitted a base bid total of $2,717,591.00 with additive alternates totaling $5,503,629.00, for a combined project cost of $8,221,220.00. Unit pricing for rock excavation was quoted at $650.00 per bank cubic yard by Mann Mechanical and $500.00 by Martin Mechanical, while unsuitable soil removal was priced at $325.00 and $150.00 per bank cubic yard respectively.
Text of this file
Project:
Bid Open Date:
Description Quantity UoM Unit Cost Total Cost Unit Cost Total Cost
1 Base Bid - Replace Underground Heating Loop 0.00 2,241,119.00 0.00 2,717,591.00 2,241,119.00 2,717,591.00
Heating water supply, heating water return and domestic water piping extending from STA HW6+74.88 to STA HW15+12.94 0.00 2,823,694.00 0.00 1,732,790.00
Heating water supply, heating water return and domestic water piping extending from STA HW15+12.94 through connections to Units F, G, H and J 0.00 1,891,087.00 0.00 1,605,767.00
Provide PVC insulation jacketing on all the existing piping systems within the Central Energy Plant building 0.00 136,370.00 0.00 2,165,072.00
4,851,151.00 5,503,629.00
Rock excavation, hauling and disposal (in excess of 150 cubic yards included in base bid) 1 BCY 650.00 650.00 500.00 500.00
Unsuitable soil removal, hauling and disposal (in excess of 150 cubic yards included in base bid) 1 BCY 325.00 325.00 150.00 150.00
975.00 650.00
2,241,119.00 2,717,591.00
Mann Mechanical Company, Inc. Martin Mechanical Contractors, Inc.
GDC-21-HAYS-SP-016, Hays State Prison Underground Heating Loop John Kraus Jack Dunagan
03.24.2023 2:00 PM jkraus@mannmechanical.com jdunagan@martinmechanical.com
Base Bid
Base Bid Cost Total Additive Alternates
Additive Alternates Cost Total Unit Prices
Unit Prices Cost Total
Bidder Qualification Notes See Attached
Bid Summary Base Bid Total
GDC-21-HAYS-SP-016, Hays State
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Sign-In Sheet | — | |
| e-Builder User Guide | — | |
| Invitation To Bid | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .