Bid Tab Phase 3.pdf

PDF 266 KB Posted

Attached to
Highway 49 Water Extension- Phase 3
Solicitation number
PE-68400-NONST-2026-000000018
Issued by
Jefferson County, Georgia

About this file

This is a Bid Tabulation document for the Jones County Board of Commissioners' Highway 49 Water System Extension Phase 3 project, managed by Ingram & Associates Consulting Engineers. The project encompasses the construction of water system infrastructure including installation of 12-inch and 16-inch water mains (totaling approximately 37,319 linear feet), directional bore work (600 linear feet combined), fire hydrants, gate valves, service connections, and associated appurtenances. Additional work includes road surface restoration (asphalt, concrete, and gravel driveway replacement), erosion and sedimentation control measures, excavation, and site preparation. Sealed bids were received on February 17, 2026, at 11:00 A.M. at the Jones County Board of Commissioners office in Gray, Georgia. Eight contractors submitted bids for the project, with bid amounts ranging from approximately $3.14 million to $6.31 million for the base bid and alternate bid prices extending from $2.17 million to $5.15 million.

The bid tabulation identifies eight responding contractors: Southeast Connections, LLC; Taylor and Sons, Inc.; Ohmshiv Construction; Helix Grading & Utility, LLC; John R. Walker, Inc.; Legacy Water Group, LLC; UWS, Inc.; and Coggins Construction Company, LLC. Base bid totals ranged from $3,143,468.50 (Southeast Connections, LLC - lowest) to $4,600,948.30 (Helix Grading & Utility, LLC - highest). Alternate bid pricing for directional bore and ductile iron water main substitutions ranged from $2,173,227.40 to $5,151,340.00. Unit pricing variation across line items was substantial, with certain items such as 12-inch directional bore work ranging from $170 to $566 per linear foot. The document certifies all unit prices were received and recorded on February 17, 2026, with notation of mathematical errors in certain submitted bids indicated by asterisks.

View the file

Other files

File Type Posted
Addendum 2.pdf PDF
00100_REVISED Executed Advertisement for Bid.pdf PDF
Addendum 1.pdf PDF
Award Letter_ Hwy 49 Phase 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER: BIDDER: BIDDER: BIDDER:

Southeast Connections, LLC

2720 Dogwood Drive SE

Lawrenceville, GA 30043 ph: 404-987-0020 ph: 478-272-4558 ph: 470-491-4500

UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL

PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE

1 222 LF 6" Ductile Iron Lead 52.00$ 11,544.00$ 48.25$ 10,711.50$ 51.20$ 11,366.40$ 63.00$ 13,986.00$

2 18,940 LF 12" Water Main – C-900 PVC 55.00$ 1,041,700.00$ 50.50$ 956,470.00$ 54.70$ 1,036,018.00$ 67.00$ 1,268,980.00$

3 37 LF 12" Water Main - Ductile Iron 105.00$ 3,885.00$ 95.25$ 3,524.25$ 89.90$ 3,326.30$ 113.00$ 4,181.00$

4 164 LF

12" Water Main - Ductile Iron Restrained

Joints 120.00$ 19,680.00$ 126.95$ 20,819.80$ 239.00$ 39,196.00$ 128.00$ 20,992.00$

5 18,379 LF 16" Water Main – C-905 PVC 50.00$ 918,950.00$ 45.35$ 833,487.65$ 49.90$ 917,112.10$ 63.00$ 1,157,877.00$

6 120 LF 16" Water Main - Ductile Iron (class 350) 160.00$ 19,200.00$ 136.10$ 16,332.00$ 129.70$ 15,564.00$ 149.00$ 17,880.00$

7 120 LF

16" Water Main - Ductile Iron Restrained

Joints 165.00$ 19,800.00$ 194.75$ 23,370.00$ 383.30$ 45,996.00$ 182.00$ 21,840.00$

8 10 LF 18" Steel Casing 196.00$ 1,960.00$ 310.50$ 3,105.00$ 200.00$ 2,000.00$ 400.00$ 4,000.00$

9 80 LF 30" Steel Casing 330.00$ 26,400.00$ 365.00$ 29,200.00$ 493.00$ 39,440.00$ 352.00$ 28,160.00$

10 44 EA Three-Way Fire Hydrant w/ Base Elbow 5,000.00$ 220,000.00$ 6,465.00$ 284,460.00$ 4,387.00$ 193,028.00$ 7,657.00$ 336,908.00$

11 62 EA Service Connection - Short Side 850.00$ 52,700.00$ 1,940.00$ 120,280.00$ 875.00$ 54,250.00$ 2,752.00$ 170,624.00$

12 83 EA Service Connection - Long Side 1,550.00$ 128,650.00$ 2,437.00$ 202,271.00$ 1,437.50$ 119,312.50$ 3,604.00$ 299,132.00$

13 44 EA 6" Gate Valve w/ Box & concrete collar 1,880.00$ 82,720.00$ 2,056.50$ 90,486.00$ 1,774.50$ 78,078.00$ 2,749.00$ 120,956.00$

14 10 EA 12" Gate Valve w/ Box & concrete collar 5,100.00$ 51,000.00$ 5,143.00$ 51,430.00$ 4,773.00$ 47,730.00$ 5,461.00$ 54,610.00$

15 8 EA 16" Gate Valve w/ Box & concrete collar 13,500.00$ 108,000.00$ 8,335.00$ 66,680.00$ 12,218.00$ 97,744.00$ 13,257.00$ 106,056.00$

16 1 EA

12" Watermain Termination Including

Deadman and 12" Plug 4,000.00$ 4,000.00$ 3,730.00$ 3,730.00$ 4,260.00$ 4,260.00$ 12,841.00$ 12,841.00$

17 1 EA

16" Watermain Termination Including

Deadman and 16" Plug 5,700.00$ 5,700.00$ 4,779.00$ 4,779.00$ 5,700.00$ 5,700.00$ 12,841.00$ 12,841.00$

18 956 LF Gravel Driveway Replacement (GABC) 8.00$ 7,648.00$ 12.90$ 12,332.40$ 5.40$ 5,162.40$ 19.00$ 18,164.00$

19 58 LF Concrete Driveway Replacement 35.00$ 2,030.00$ 73.50$ 4,263.00$ 30.00$ 1,740.00$ 283.00$ 16,414.00$

20 211 LF Asphalt Driveway Replacement 40.00$ 8,440.00$ 91.00$ 19,201.00$ 19.00$ 4,009.00$ 131.00$ 27,641.00$

21 134 LF Class "A" Pavement Replacement 35.00$ 4,690.00$ 150.00$ 20,100.00$ 40.00$ 5,360.00$ 268.00$ 35,912.00$

22 10,103 LF Silt Fence Type "A" 2.00$ 20,206.00$ 1.80$ 18,185.40$ 2.37$ 23,944.11$ 2.00$ 20,206.00$

23 727 LF Silt Fence Type "C" 2.50$ 1,817.50$ 3.75$ 2,726.25$ 3.00$ 2,181.00$ 4.00$ 2,908.00$

24 81 EA Haybale Checkdams 50.00$ 4,050.00$ 92.00$ 7,452.00$ 75.00$ 6,075.00$ 113.00$ 9,153.00$

25 1,040 SF Rip Rap 10.00$ 10,400.00$ 6.25$ 6,500.00$ 34.00$ 35,360.00$ 13.00$ 13,520.00$

26 15.1 AC Permanent Grassing 750.00$ 11,325.00$ 2,680.00$ 40,468.00$ 1,870.00$ 28,237.00$ 2,253.00$ 34,020.30$

27 0.2 AC Clearing & Grubbing 10,000.00$ 2,000.00$ 73,500.00$ 14,700.00$ 42,500.00$ 8,500.00$ 23,105.00$ 4,621.00$

28 1 EA

Tie to Existing 16" Water Main on Morris

Stevens Rd. 3,800.00$ 3,800.00$ 2,000.00$ 2,000.00$ 3,500.00$ 3,500.00$ 7,464.00$ 7,464.00$

29 11.5

TON

S DI Fittings

17,000.00$ 195,500.00$ 17,730.00$ 203,895.00$ 16,650.00$ 191,475.00$ 16,532.00$ 190,118.00$

30 5,751 LF 1" 200 PSI SDR 9 Municipex Service Tubing 3.00$ 17,253.00$ 5.75$ 33,068.25$ 11.50$ 66,136.50$ 15.00$ 86,265.00$

31 41 EA Replace Mailbox & Lay GABC (As needed) 120.00$ 4,920.00$ 180.00$ 7,380.00$ 270.00$ 11,070.00$ 743.00$ 30,463.00$

32 1 LS

Mobilization, Bonding, Insurance, Cleanup, Stakeout, Site Preparation, and Disposal of

Debris 60,000.00$ 60,000.00$ 92,000.00$ 92,000.00$ 150,000.00$ 150,000.00$ 356,000.00$ 356,000.00$

33 1 LS

Erosion & Sedimentation Control including all

BMPs not specifically itemized below, inspections, maintenance and temporary grassing/mulching 20,000.00$ 20,000.00$ 9,315.00$ 9,315.00$ 11,450.00$ 11,450.00$ 14,556.00$ 14,556.00$

34 1 LS

NPDES Permit No 100002 Requirements including sampling, inspections, retention of records and reporting for a 6-month period.

1,500.00$ 1,500.00$ 3,675.00$ 3,675.00$ 4,260.00$ 4,260.00$ 5,459.00$ 5,459.00$

35 200 CY Classified Excavation – Blasting Removal 150.00$ 30,000.00$ 153.00$ 30,600.00$ 113.00$ 22,600.00$ 208.00$ 41,600.00$

36 200 CY Classified Excavation – Mechanical Removal 110.00$ 22,000.00$ 122.50$ 24,500.00$ 65.00$ 13,000.00$ 173.00$ 34,600.00$

TOTAL BASE BID

37 300 LF 12” Directional Bore 370.00$ 111,000.00$ 424.00$ 127,200.00$ 235.75$ 70,725.00$ 170.00$ 51,000.00$

38 300 LF 16” Directional Bore 370.00$ 111,000.00$ 566.00$ 169,800.00$ 215.10$ 64,530.00$ 257.00$ 77,100.00$

39 18,940 LF 12” Class 350 Ductile Iron Water Main 105.00$ 1,988,700.00$ 97.00$ 1,837,180.00$ 32.30$ 611,762.00$ 112.00$ 2,121,280.00$

40 18,379 LF 16” Class 350 Ductile Iron Water Main 160.00$ 2,940,640.00$ 139.00$ 2,554,681.00$ 77.60$ 1,426,210.40$ 155.00$ 2,848,745.00$

ALTERNATE BID

I hereby certify that this is a true and accurate record of all unit prices received on February 17, 2026.

* Indicates a mathmatical error in bid submitted

Conyers, GA 30013

30 Industrial Drive

4,600,948.30$

BID TABULATION FOR ALL BIDDERS

JONES COUNTY BOARD OF COMMISSIONERS

DESCRIPTION

3,143,468.50$

I&A Project No.: 1160-092-03

1925 GA Hwy 29 South

East Dublin, GA 31027

3,273,497.50$ 3,304,181.31$

805 Progress Ct, NE

Taylor and Sons, Inc.

QUANT.

Zebulon, GA 30295

Tim Ingram, P.E. #20644

INGRAM & ASSOCIATES

CONSULTING ENGINEERS

332 NEW STREET

MACON, GA 31201

Ohmshiv Construction

Hwy 49 Phase 3

ITEM # UNIT

ph: 678-898-6426

Helix Grading & Utility, LLC

Alternate Bid:

5,151,340.00$ 4,688,861.00$ 2,173,227.40$ 5,098,125.00$

Stephanie Line

Stephanie Line

BIDDER: BIDDER: BIDDER: BIDDER:

ph: 706-938-0493 ph: 678-712-2132 ph: 478-474-3197 Trion, GA 30753 ph: 706-734-0577

UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL

PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE

61.64$ 13,684.08$ 38.00$ 8,436.00$ 72.29$ 16,048.38$ 60.00$ 13,320.00$

62.64$ 1,186,401.60$ 74.00$ 1,401,560.00$ 71.00$ 1,344,740.00$ 64.06$ 1,213,296.40$

99.01$ 3,663.37$ 160.00$ 5,920.00$ 122.00$ 4,514.00$ 140.00$ 5,180.00$

193.46$ 31,727.44$ 9.00$ 1,476.00$ 142.00$ 23,288.00$ 140.00$ 22,960.00$

59.24$ 1,088,771.96$ 72.00$ 1,323,288.00$ 71.00$ 1,304,909.00$ 66.01$ 1,213,197.79$

149.43$ 17,931.60$ 137.00$ 16,440.00$ 182.00$ 21,840.00$ 200.00$ 24,000.00$

281.51$ 33,781.20$ 28.00$ 3,360.00$ 340.00$ 40,800.00$ 250.00$ 30,000.00$

1,265.41$ 12,654.10$ 185.00$ 1,850.00$ 1,026.00$ 10,260.00$ 1,600.00$ 16,000.00$

863.94$ 69,115.20$ 185.00$ 14,800.00$ 571.00$ 45,680.00$ 950.00$ 76,000.00$

5,118.50$ 225,214.00$ 6,625.00$ 291,500.00$ 7,292.00$ 320,848.00$ 5,000.00$ 220,000.00$

1,466.64$ 90,931.68$ 1,560.00$ 96,720.00$ 2,861.00$ 177,382.00$ 750.00$ 46,500.00$

1,407.57$ 116,828.31$ 2,150.00$ 178,450.00$ 4,014.00$ 333,162.00$ 950.00$ 78,850.00$

2,081.25$ 91,575.00$ 1,960.00$ 86,240.00$ 3,927.00$ 172,788.00$ 1,750.00$ 77,000.00$

5,553.50$ 55,535.00$ 5,245.00$ 52,450.00$ 6,934.00$ 69,340.00$ 5,000.00$ 50,000.00$

8,273.75$ 66,190.00$ 13,430.00$ 107,440.00$ 15,914.00$ 127,312.00$ 15,000.00$ 120,000.00$

4,350.31$ 4,350.31$ 2,780.00$ 2,780.00$ 15,468.00$ 15,468.00$ 10,000.00$ 10,000.00$

5,303.29$ 5,303.29$ 4,335.00$ 4,335.00$ 24,468.00$ 24,468.00$ 10,000.00$ 10,000.00$

15.97$ 15,267.32$ 10.00$ 9,560.00$ 30.00$ 28,680.00$ 20.00$ 19,120.00$

136.01$ 7,888.58$ 320.00$ 18,560.00$ 295.00$ 17,110.00$ 150.00$ 8,700.00$

40.06$ 8,452.66$ 120.00$ 25,320.00$ 124.00$ 26,164.00$ 150.00$ 31,650.00$

281.18$ 37,678.12$ 180.00$ 24,120.00$ 289.00$ 38,726.00$ 150.00$ 20,100.00$

4.51$ 45,564.53$ 2.00$ 20,206.00$ 3.00$ 30,309.00$ 3.00$ 30,309.00$

6.93$ 5,038.11$ 3.50$ 2,544.50$ 5.50$ 3,998.50$ 3.00$ 2,181.00$

190.35$ 15,418.35$ 120.00$ 9,720.00$ 200.00$ 16,200.00$ 150.00$ 12,150.00$

17.24$ 17,929.60$ 15.00$ 15,600.00$ 15.00$ 15,600.00$ 20.00$ 20,800.00$

2,697.30$ 40,729.23$ 2,300.00$ 34,730.00$ 3,000.00$ 45,300.00$ 5,298.01$ 79,999.95$

32,200.00$ 6,440.00$ 75,000.00$ 15,000.00$ 12,500.00$ 2,500.00$ 10,000.00$ 2,000.00$

6,335.00$ 6,335.00$ 5,125.00$ 5,125.00$ 34,000.00$ 34,000.00$ 25,000.00$ 25,000.00$

34,789.22$ 400,076.03$ 1.00$ 11.50$ 12,000.00$ 138,000.00$ 0.01$ 0.12$

32.02$ 184,147.02$ 20.00$ 115,020.00$ 14.75$ 84,827.25$ 30.00$ 172,530.00$

1,107.50$ 45,407.50$ 40.00$ 1,640.00$ 800.00$ 32,800.00$ 100.00$ 4,100.00$

180,004.59$ 180,004.59$ 165,000.00$ 165,000.00$ 93,121.00$ 93,121.00$ 100,000.00$ 100,000.00$

25,000.00$ 25,000.00$ 1,600.00$ 1,600.00$ 6,500.00$ 6,500.00$ 100,000.00$ 100,000.00$

8,460.00$ 8,460.00$ 4,500.00$ 4,500.00$ 6,500.00$ 6,500.00$ 15,000.00$ 15,000.00$

125.00$ 25,000.00$ 110.00$ 22,000.00$ 165.00$ 33,000.00$ -$ -$

145.00$ 29,000.00$ 130.00$ 26,000.00$ 215.00$ 43,000.00$ 150.00$ 30,000.00$

276.02$ 82,806.00$ 250.00$ 75,000.00$ 342.00$ 102,600.00$ 200.00$ 60,000.00$

350.96$ 105,288.00$ 375.00$ 112,500.00$ 507.00$ 152,100.00$ 250.00$ 75,000.00$

99.01$ 1,875,249.40$ 110.00$ 2,083,400.00$ 120.00$ 2,272,800.00$ 127.00$ 2,405,380.00$

149.43$ 2,746,373.97$ 153.00$ 2,811,987.00$ 141.50$ 2,600,628.50$ 205.00$ 3,767,695.00$

3,899,944.26$

P.O. Box 516

John R. Walker, Inc.

Macon, GA 31210 16048 Hwy 27

Legacy Water Group, LLC

10130 Bob Williams Pkwy

Covington, GA 30014

UWS, Inc.

1415 Hwy 19 South

Coggins Construction Company, LLC

4,113,302.00$

4038 475-Industrial Blvd

4,749,183.13$

Thomaston, GA 30286

4,217,494.78$

5,082,887.00$ 5,128,128.50$ 6,308,075.00$ 4,809,717.37$