Addendum 1.pdf

PDF 119 KB Posted

Attached to
Highway 49 Water Extension- Phase 3
Solicitation number
PE-68400-NONST-2026-000000018
Issued by
Jefferson County, Georgia

About this file

This is Addendum No. 1 to the Plans, Specifications, and Contract Documents for the Highway 49 Water System Extension Phase 3 project, issued by Jones County, Georgia. The addendum revises the bid date for sealed bids to February 17, 2026, at 11:00 a.m. local prevailing time. The project involves constructing a water system extension that includes furnishing materials and constructing 16-inch and 12-inch water mains, road bores, gate valves, fire hydrants, water services, and miscellaneous appurtenances as part of an expansion of the water distribution system. Bids will be received at the Jones County Board of Commissioners, 166 Industrial Blvd., Gray, Georgia 31032, and publicly opened and read in the Commission Chambers. All contractors must be licensed by the State of Georgia with license numbers written on the bid envelope. No bid may be withdrawn for sixty (60) calendar days following the closing time for receipt of bids.

Contract documents are available for review at the Jones County Board of Commissioners office and the Dodge Plan Room. Bidders must obtain bidding documents from Ingram & Associates Consulting Engineers, L.L.C., 332 New Street, Macon, Georgia 31201, at a cost of $200.00 per hard copy set or $75.00 per digital set (non-refundable). Contact information for document acquisition is provided through Ashley Chancey at (478) 745-3996 or ashley@ingrameng.com. Bidders are required to acquire bidding documents from the engineer to participate in the bid process for this project.

View the file

Other files

File Type Posted
Addendum 2.pdf PDF
00100_REVISED Executed Advertisement for Bid.pdf PDF
Bid Tab Phase 3.pdf PDF
Award Letter_ Hwy 49 Phase 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS

PROJECT: Hwy 49 Water System Extension Phase 3

I&A Project No.: 1160-092-03

OWNER: Jones County, Georgia

BID DATE: February 17, 2026 @ 11:00 am

Item 1: REVISION OF BID DATE: Bids for Hwy 49 Water System Extension

Phase 3 will be received until February 17th at 11:00 am, local prevailing time.

END ADDENDUM NO. 1