About this file
This is a bid sheet for Group 1 of a Station Maintenance Request for Bids (RFB 04-28-23) covering four districts (Districts 1, 2, 3, and 4). The project encompasses the furnishing, installation, and maintenance of electrical and traffic control infrastructure across multiple districts. Work items include bore and jack piping, conduit installation in various sizes, electrical service installation, cabinet installation (pad mount and pole mount), junction box installation (multiple types), piezoelectric sensors, wooden poles, trenching and backfill, cable and loop wire installation, ground wire installation, wood posts, sidewalk removal and replacement, saw slot and fill operations, lane and shoulder closures, and loop testing. District 1 and District 2 have identical quantities, while Districts 3 and 4 have scaled quantities appropriate to their individual needs. District 1 and 2 each require 50 linear feet of 2-inch pipe, 400 linear feet of 1-inch conduit, and 8,000 linear feet of loop wire, among other items. District 3 requires larger quantities in most categories, including 500 linear feet of 1-inch conduit and 10,000 linear feet of loop wire. District 4 has the smallest scope, with 250 linear feet of 1-inch conduit and 5,000 linear feet of loop wire.
The bid sheet provides line items with unit prices and extended prices to be completed by bidders for each district. Bidders are expected to submit unit prices for each item listed, with totals calculated for each individual district and a consolidated Group 1 total. The document does not specify pricing terms, payment schedules, set-asides, incumbent information, funding sources, or contract duration within the provided content, as these details would typically appear in separate RFB documents or contract specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to Submit an Online Response - March 2023.pdf | ||
| Final_RFB_605_2300000780_1_SO_FORM.PDF | ||
| Annual Affidavit for Bidders, Offerors and Contractors - Jan 2023.docx | DOCX document | |
| District Map.pdf | ||
| Bid Sheet Group 2.pdf | ||
| Bid Sheets Group 3.pdf | ||
| Bid Sheets Group 4.pdf | ||
| FHWA-1273.pdf | ||
| Drawings.pdf | ||
| Final_RFB_605_2300000780_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Group 1 – Districts 1, 2, 3, and 4
Group 1: District 1
Item Description Unit D01 Quantity
D01 Unit Price
D01 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 400
3 Furnish and Install Conduit 2 Inch LIN FT 200
4 Furnish and Install Electrical Service EACH 2
5 Furnish and Install Galvanized Steel Cabinet EACH 2
6 Install Pad Mount Cabinet EACH 2
7 Install Pole Mount Cabinet EACH 2
8 Furnish and Install Junction Box 10x8x4 EACH 2
9 Furnish and Install Junction Box Type A EACH 12
10 Furnish and Install Junction Box Type B EACH 12
11 Saw Slot and Fill LIN FT 1400
12 Furnish, Install and Remove Lane Closure EACH 16
13 Furnish, Install and Remove Shoulder Closure EACH 8
14 Furnish and Install Piezoelectric Sensor EACH 12
15 Install Piezoelectric Sensor EACH 12
16 Furnish and Install 35’ Wooden Pole EACH 2
17 Excavate Trench and Backfill LIN FT 600
18 Furnish and Install Cable No. 14/1 Pair LIN FT 400
19 Furnish and Install Loop Wire LIN FT 8000
20 Furnish and Install Ground Wire LIN FT 40
21 Furnish and Install Wood Post EACH 6
22 Remove and Replace Sidewalk SQYD 1
23 Loop Test EACH 1
Group 1: District 1 Total
Group 1: District 2
Item Description Unit D02 Quantity
D02 Unit Price
D02 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 400
3 Furnish and Install Conduit 2 Inch LIN FT 200
4 Furnish and Install Electrical Service EACH 2
5 Furnish and Install Galvanized Steel Cabinet EACH 2
6 Install Pad Mount Cabinet EACH 2
7 Install Pole Mount Cabinet EACH 2
8 Furnish and Install Junction Box 10x8x4 EACH 2
9 Furnish and Install Junction Box Type A EACH 12
10 Furnish and Install Junction Box Type B EACH 12
11 Saw Slot and Fill LIN FT 1400
12 Furnish, Install and Remove Lane Closure EACH 16
13 Furnish, Install and Remove Shoulder Closure EACH 8
14 Furnish and Install Piezoelectric Sensor EACH 12
15 Install Piezoelectric Sensor EACH 12
16 Furnish and Install 35’ Wooden Pole EACH 2
17 Excavate Trench and Backfill LIN FT 600
18 Furnish and Install Cable No. 14/1 Pair LIN FT 400
19 Furnish and Install Loop Wire LIN FT 8000
20 Furnish and Install Ground Wire LIN FT 40
21 Furnish and Install Wood Post EACH 6
22 Remove and Replace Sidewalk SQYD 1
Group 1: District 2 Total
Group 1: District 3
Item Description Unit D03 Quantity
D03 Unit Price
D03 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 500
3 Furnish and Install Conduit 2 Inch LIN FT 250
4 Furnish and Install Electrical Service EACH 2
5 Furnish and Install Galvanized Steel Cabinet EACH 3
6 Install Pad Mount Cabinet EACH 2
7 Install Pole Mount Cabinet EACH 2
8 Furnish and Install Junction Box 10x8x4 EACH 2
9 Furnish and Install Junction Box Type A EACH 15
10 Furnish and Install Junction Box Type B EACH 15
11 Saw Slot and Fill LIN FT 1750
12 Furnish, Install and Remove Lane Closure EACH 20
13 Furnish, Install and Remove Shoulder Closure EACH 10
14 Furnish and Install Piezoelectric Sensor EACH 15
15 Install Piezoelectric Sensor EACH 15
16 Furnish and Install 35’ Wooden Pole EACH 2
17 Excavate Trench and Backfill LIN FT 750
18 Furnish and Install Cable No. 14/1 Pair LIN FT 500
19 Furnish and Install Loop Wire LIN FT 10000
20 Furnish and Install Ground Wire LIN FT 50
21 Furnish and Install Wood Post EACH 8
22 Remove and Replace Sidewalk SQYD 1
Group 1: District 3 Total
Group 1: District 4
Item Description Unit D04 Quantity
D04 Unit Price
D04 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 250
3 Furnish and Install Conduit 2 Inch LIN FT 125
4 Furnish and Install Electrical Service EACH 1
5 Furnish and Install Galvanized Steel Cabinet EACH 1
6 Install Pad Mount Cabinet EACH 1
7 Install Pole Mount Cabinet EACH 1
8 Furnish and Install Junction Box 10x8x4 EACH 1
9 Furnish and Install Junction Box Type A EACH 7
10 Furnish and Install Junction Box Type B EACH 7
11 Saw Slot and Fill LIN FT 875
12 Furnish, Install and Remove Lane Closure EACH 10
13 Furnish, Install and Remove Shoulder Closure EACH 5
14 Furnish and Install Piezoelectric Sensor EACH 10
15 Install Piezoelectric Sensor EACH 10
16 Furnish and Install 35’ Wooden Pole EACH 1
17 Excavate Trench and Backfill LIN FT 375
18 Furnish and Install Cable No. 14/1 Pair LIN FT 250
19 Furnish and Install Loop Wire LIN FT 5000
20 Furnish and Install Ground Wire LIN FT 25
21 Furnish and Install Wood Post EACH 3
22 Remove and Replace Sidewalk SQYD 1
Group 1: District 4 Total
Group 1: Districts 1, 2, 3 and 4
District 1 Total
District 2 Total
District 3 Total
District 4 Total
Group 1 Total Bid