About this file

This is a bid sheet for Group 1 of a Station Maintenance Request for Bids (RFB 04-28-23) covering four districts (Districts 1, 2, 3, and 4). The project encompasses the furnishing, installation, and maintenance of electrical and traffic control infrastructure across multiple districts. Work items include bore and jack piping, conduit installation in various sizes, electrical service installation, cabinet installation (pad mount and pole mount), junction box installation (multiple types), piezoelectric sensors, wooden poles, trenching and backfill, cable and loop wire installation, ground wire installation, wood posts, sidewalk removal and replacement, saw slot and fill operations, lane and shoulder closures, and loop testing. District 1 and District 2 have identical quantities, while Districts 3 and 4 have scaled quantities appropriate to their individual needs. District 1 and 2 each require 50 linear feet of 2-inch pipe, 400 linear feet of 1-inch conduit, and 8,000 linear feet of loop wire, among other items. District 3 requires larger quantities in most categories, including 500 linear feet of 1-inch conduit and 10,000 linear feet of loop wire. District 4 has the smallest scope, with 250 linear feet of 1-inch conduit and 5,000 linear feet of loop wire.

The bid sheet provides line items with unit prices and extended prices to be completed by bidders for each district. Bidders are expected to submit unit prices for each item listed, with totals calculated for each individual district and a consolidated Group 1 total. The document does not specify pricing terms, payment schedules, set-asides, incumbent information, funding sources, or contract duration within the provided content, as these details would typically appear in separate RFB documents or contract specifications.

View the file

Other files

File Type Posted
How to Submit an Online Response - March 2023.pdf PDF
Final_RFB_605_2300000780_1_SO_FORM.PDF PDF
Annual Affidavit for Bidders, Offerors and Contractors - Jan 2023.docx DOCX document
District Map.pdf PDF
Bid Sheet Group 2.pdf PDF
Bid Sheets Group 3.pdf PDF
Bid Sheets Group 4.pdf PDF
FHWA-1273.pdf PDF
Drawings.pdf PDF
Final_RFB_605_2300000780_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group 1 – Districts 1, 2, 3, and 4

Group 1: District 1

Item Description Unit D01 Quantity

D01 Unit Price

D01 Extended

Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50

2 Furnish and Install Conduit 1¼ Inch LIN FT 400

3 Furnish and Install Conduit 2 Inch LIN FT 200

4 Furnish and Install Electrical Service EACH 2

5 Furnish and Install Galvanized Steel Cabinet EACH 2

6 Install Pad Mount Cabinet EACH 2

7 Install Pole Mount Cabinet EACH 2

8 Furnish and Install Junction Box 10x8x4 EACH 2

9 Furnish and Install Junction Box Type A EACH 12

10 Furnish and Install Junction Box Type B EACH 12

11 Saw Slot and Fill LIN FT 1400

12 Furnish, Install and Remove Lane Closure EACH 16

13 Furnish, Install and Remove Shoulder Closure EACH 8

14 Furnish and Install Piezoelectric Sensor EACH 12

15 Install Piezoelectric Sensor EACH 12

16 Furnish and Install 35’ Wooden Pole EACH 2

17 Excavate Trench and Backfill LIN FT 600

18 Furnish and Install Cable No. 14/1 Pair LIN FT 400

19 Furnish and Install Loop Wire LIN FT 8000

20 Furnish and Install Ground Wire LIN FT 40

21 Furnish and Install Wood Post EACH 6

22 Remove and Replace Sidewalk SQYD 1

23 Loop Test EACH 1

Group 1: District 1 Total

Group 1: District 2

Item Description Unit D02 Quantity

D02 Unit Price

D02 Extended

Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50

2 Furnish and Install Conduit 1¼ Inch LIN FT 400

3 Furnish and Install Conduit 2 Inch LIN FT 200

4 Furnish and Install Electrical Service EACH 2

5 Furnish and Install Galvanized Steel Cabinet EACH 2

6 Install Pad Mount Cabinet EACH 2

7 Install Pole Mount Cabinet EACH 2

8 Furnish and Install Junction Box 10x8x4 EACH 2

9 Furnish and Install Junction Box Type A EACH 12

10 Furnish and Install Junction Box Type B EACH 12

11 Saw Slot and Fill LIN FT 1400

12 Furnish, Install and Remove Lane Closure EACH 16

13 Furnish, Install and Remove Shoulder Closure EACH 8

14 Furnish and Install Piezoelectric Sensor EACH 12

15 Install Piezoelectric Sensor EACH 12

16 Furnish and Install 35’ Wooden Pole EACH 2

17 Excavate Trench and Backfill LIN FT 600

18 Furnish and Install Cable No. 14/1 Pair LIN FT 400

19 Furnish and Install Loop Wire LIN FT 8000

20 Furnish and Install Ground Wire LIN FT 40

21 Furnish and Install Wood Post EACH 6

22 Remove and Replace Sidewalk SQYD 1

Group 1: District 2 Total

Group 1: District 3

Item Description Unit D03 Quantity

D03 Unit Price

D03 Extended

Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50

2 Furnish and Install Conduit 1¼ Inch LIN FT 500

3 Furnish and Install Conduit 2 Inch LIN FT 250

4 Furnish and Install Electrical Service EACH 2

5 Furnish and Install Galvanized Steel Cabinet EACH 3

6 Install Pad Mount Cabinet EACH 2

7 Install Pole Mount Cabinet EACH 2

8 Furnish and Install Junction Box 10x8x4 EACH 2

9 Furnish and Install Junction Box Type A EACH 15

10 Furnish and Install Junction Box Type B EACH 15

11 Saw Slot and Fill LIN FT 1750

12 Furnish, Install and Remove Lane Closure EACH 20

13 Furnish, Install and Remove Shoulder Closure EACH 10

14 Furnish and Install Piezoelectric Sensor EACH 15

15 Install Piezoelectric Sensor EACH 15

16 Furnish and Install 35’ Wooden Pole EACH 2

17 Excavate Trench and Backfill LIN FT 750

18 Furnish and Install Cable No. 14/1 Pair LIN FT 500

19 Furnish and Install Loop Wire LIN FT 10000

20 Furnish and Install Ground Wire LIN FT 50

21 Furnish and Install Wood Post EACH 8

22 Remove and Replace Sidewalk SQYD 1

Group 1: District 3 Total

Group 1: District 4

Item Description Unit D04 Quantity

D04 Unit Price

D04 Extended

Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50

2 Furnish and Install Conduit 1¼ Inch LIN FT 250

3 Furnish and Install Conduit 2 Inch LIN FT 125

4 Furnish and Install Electrical Service EACH 1

5 Furnish and Install Galvanized Steel Cabinet EACH 1

6 Install Pad Mount Cabinet EACH 1

7 Install Pole Mount Cabinet EACH 1

8 Furnish and Install Junction Box 10x8x4 EACH 1

9 Furnish and Install Junction Box Type A EACH 7

10 Furnish and Install Junction Box Type B EACH 7

11 Saw Slot and Fill LIN FT 875

12 Furnish, Install and Remove Lane Closure EACH 10

13 Furnish, Install and Remove Shoulder Closure EACH 5

14 Furnish and Install Piezoelectric Sensor EACH 10

15 Install Piezoelectric Sensor EACH 10

16 Furnish and Install 35’ Wooden Pole EACH 1

17 Excavate Trench and Backfill LIN FT 375

18 Furnish and Install Cable No. 14/1 Pair LIN FT 250

19 Furnish and Install Loop Wire LIN FT 5000

20 Furnish and Install Ground Wire LIN FT 25

21 Furnish and Install Wood Post EACH 3

22 Remove and Replace Sidewalk SQYD 1

Group 1: District 4 Total

Group 1: Districts 1, 2, 3 and 4

District 1 Total

District 2 Total

District 3 Total

District 4 Total

Group 1 Total Bid

Count Station Maintenance RFB 04-28-23.pdf
Item
Item
Item
Item

File details come from the government source that posted it. Updated .