Bid Sheet-ER Corridor door assemblies installation with camera monitoring system 9-27-2022.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Contractor shall furnish and install ER cross corridor door assemblies with monitoring cameras for the ER department at the Claremore Indian Hospital in accordance with the statement of work.
Solicitation number
246-22-Q-0160
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

PROJECT TITLE:Install two ER Corridor Door Assemblies with Camera Monitoring System and Access Controls project
Detailed Price Summary
Contract Line Item DescriptionBase PeriodOption Year 1, Year TwoOption Year 2, Year ThreeOption Year 3, Year FourOption Year 4, Year Five
QuantityUnitUnit PriceTotal PriceQuantityUnitUnit PriceTotal PriceQuantityUnitUnit PriceTotal PriceQuantityUnitUnit PriceTotal PriceQuantityUnitUnit PriceTotal Price
Access controls: Install 4 card readers, cabling, door magloks, controls, power supplies, supporting components, programming required to for 2 sets of double corridor doors with card readers on both sides of each door assembly.1.00eaeach$ - 0eachERROR:#REF!ERROR:#REF!1.00eachERROR:#REF!ERROR:#REF!1.00eachERROR:#REF!ERROR:#REF!
HID RPKCL-40-P keypad card reader x 4ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$ - 0
Door sensor kits x 4ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$ - 0
Rex motion detector x 2ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
J-hooks to hang CAT 6 cablingERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
CAT-6 cabling blue, plenum rated, 1000 ft roll (700' installed in labor)ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Interface controller cards x 3ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
As-built printsERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Misc. supplies, PPE, hardware, etc.
Labor to install cabling, hardware, programming, travel hrs, etc.
Maglocks on all doors (4) and push-to-exit buttons (2)
Camera system - 16 channel max, 6 cameras (4 MP) network1.00ea
4 MP digital POE color cameras (6)
Network hardware, power supply, misc. components including electrical enclosure
LED monitor w/wall mounted bracket
Cabling 300 ft (500 ft roll)
Labor to install cabling, hardware, programming, travel hrs, etc.
General Construction:
Two 7'x7' door frame assemblies with hardware, push & kick plates, door closers, side light glazing.1.00ea
Construct two 7'10"Wx9'H cross-corridor walls for the two door assemblies, remove door entrance to 245 in the 2 hr fire barrier.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Infection control/construction barriers (2 per doorway)-material and laborERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Floor repair - 16 sqaure feetERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Automatic door operator for dual egress, includes install & programming1.00ea
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Electrical:1.00ea
LED Exit sign installation (4) including wiring to existing circuit.
Install 2 new 20 amp circuits for automatic door operator and camera system
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

Site Superintendent - max expected hours 32.00 hr

Line Item SubtotalERROR:#VALUE!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total CostERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
TOTAL ESTIMATED VALUE OF CONTRACTERROR:#REF!

&F&D&T

File details come from the government source that posted it. Updated .