Bid sheet 052225.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 246-25-Q-0067r1
About this file
The document is a bid sheet for the CIHC Coating Roof Decks Project (#5OK3CLA09C6) issued by the Indian Health Service. The solicitation (RFQ 246-25-Q-0067r1) is a 100% Indian-owned business set-aside under NAICS code 238160, seeking a contractor to apply coating on roof terraces at the Clinton Indian Health Center in Clinton, Oklahoma to prevent rainwater infiltration. The project has a 90-calendar day performance period, with quotes due by September 10, 2025 at 5:00 p.m. CST, to be submitted via email to jeffrey.earnest@ihs.gov or in a sealed envelope.
The bid sheet includes line items for testing, coating, weep hole assembly changes, mobilization, clean-up, and de-mobilization, with provisions for overhead and profit. The solicitation requires contractors to submit a firm, fixed-price quote on SF18 form, a completed bid sheet, technical specifications, an acceptable materials list, and two relevant past performance references. The estimated contract value is not explicitly stated, but the document provides a template for pricing and contract line items.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE
| PROJECT TITLE: | CIHC Coating Roof Decks Project #5OK3CLA09C6 |
| Contractor: |
Contract Line Item Description Base Period
| Quantity | Unit | Unit Price | Total Price | |
| Contractor to perform testing to include plugging the roof drains from roof to basement as necessary, run water to 1" above roof surface and check roof drains for leaks for at least 30 minutes. Intent is to pinpoint, as much as possible, leaks to be addressed. | ||||
| Labor and materials | ||||
| Coating quote | ||||
| Weep hole assembly change |
| General Requirement and Administrative | included |
| Mobilization | included |
| Clean up and De-Mobilize | included |
| Line Item Subtotal | $ - 0 |
| Overhead | included |
| Total Cost | |
| Fee/Profit | included |
| Total | |
| TOTAL ESTIMATED VALUE OF CONTRACT |