Bid_Scope_Materials_List.docx

DOCX document 18 KB Posted

Attached to
NED Home Rehab - 1207 W Cross St
Solicitation number
NED-S-1207-062326
Issued by
Escambia County, Florida

About this file

This Bid Scope Materials List document pertains to a residential rehabilitation project in Escambia County, Florida, managed by the Northeast Florida Economic Development (NED) organization for the property located at 1207 W Cross Street. The scope encompasses comprehensive kitchen, bathroom, and general home improvements including specific brand and model appliances such as a GE range, Whirlpool refrigerator, and Delta faucets; bathroom fixtures including an American Standard toilet and tub with Sterling surround; flooring materials specified as Shaw LVP and carpet; HVAC components; roofing by CertainTeed; aluminum guttering; windows; and lighting fixtures from Hampton Bay and Commercial Electric. The project requires licensed, inscontractors in good standing with Escambia County to submit bids through OPENGOV; new contractors must provide a letter of insurability. Emergency line-item awards are limited to roofing and septic/sewer services. Interested parties should contact Scott Sanchez at NED for questions regarding the project scope and requirements.

The scope document includes detailed specifications for materials and installation standards, requiring contractors to use braided supply lines for plumbing fixtures, ensure proper finishing for trim and drywall work, and install square-edged laminate countertops with four-inch backsplashes. All cabinetry must be constructed from three-quarter-inch plywood or better with solid hardwood fronts and frames, excluding particle board. All electrical appliances must be EnergyStar approved with LED bulbs. The document specifies that contractors are obligated to use like, similar, or equal-valued products when exact specifications are unavailable. Contractors bear responsibility for moving furniture while homeowners retain responsibility for contents. All surfaces, furniture, and homeowner property must be protected from damage throughout the project. No pricing information, contract term dates, or funding sources are specified in this materials list document.

View the file

Other files

File Type Posted
NED_Home_Rehab_-_1207_W_Cross_St.pdf PDF
SCOPE_-_SHIP_-_1207_W_Cross_St_-_Warren_P.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.

File details come from the government source that posted it. Updated .