Bid_Scope_Materials_List.docx

DOCX document 18 KB Posted

Attached to
NED Home Rehab - 7870 Herrington Dr
Solicitation number
NED-S-7870-040726
Issued by
Escambia County, Florida

About this file

This is a Bid Scope Materials List for a residential rehabilitation project issued by Escambia County, Florida under the State Housing Initiatives Partnership (SHIP) program for the property at 7870 Herrington Drive. The scope encompasses comprehensive home renovation work including mandatory roofing replacement with 30-year architectural shingles, electrical rewiring and LED lighting installation, and optional plumbing work with walk-in shower installation. The project requires specific branded fixtures and appliances including a GE range and cooktop, Delta faucets, Whirlpool refrigerator, American Standard toilet, Shaw flooring (luxury vinyl plank and carpet), Hunter ceiling fan, CertainTeed roofing materials, and various lighting fixtures from Hampton Bay and Commercial Electric. The mandatory pre-bid meeting and on-site walk-through is scheduled for April 14, 2026, at 11:00 AM, with questions due by April 21, 2026, at 1:00 PM and quote submissions due April 22, 2026, at 1:00 PM through the OpenGov Procurement portal. Contractor selection is anticipated for April 23, 2026, with a 60-day completion timeline from notice to proceed.

Pricing shall be submitted as firm unit costs including all packing, handling, shipping, and delivery within Escambia County. Payment structure varies by bid amount: bids under $15,000 receive lump sum payment upon project completion, while bids exceeding $15,000 receive a 40% draw upon confirmation of 50% work completion followed by substantial completion and final draws. Projects valued at $25,000 or higher require 100% Performance and Payment Bonds. Eligible bidders must be licensed, insured, and in good standing with Escambia County, with new county contractors required to submit a letter of insurability. All contractors must provide proof of Sunbiz registration, W-9 forms, valid state contractor licenses, Escambia County competency board licenses, EPA RRP certifications, worker's compensation insurance or exemption, and Commercial General Liability insurance with $1,000,000 coverage. The bid contains no specific set-aside designations for disadvantaged enterprises. Liquidated damages are assessed at $150 per day for delays beyond the 60-day completion period. The county reserves the right to award line items individually for emergency services limited to roofing and septic or sewer work.

View the file

Other files

File Type Posted
NED_Home_Rehab_-_7870_Herrington_Dr.pdf PDF
SCOPE_-_SHIP_-_7870_Herrington_Dr_-_Hutchins_C.docx DOCX document
Bid_Scope_Materials_List.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.

File details come from the government source that posted it. Updated .