This is a Bid Scope Materials List for a residential rehabilitation project issued by Escambia County, Florida under the State Housing Initiatives Partnership (SHIP) repair program for a single-family owner-occupied residence at 8110 Imperial Court in Pensacola. The project encompasses comprehensive home rehabilitation including electrical rewiring, mechanical HVAC system installation, flooring replacement with specified Shaw LVP and carpet products, plumbing fixture upgrades from manufacturers including American Standard, Delta, Sterling, and Aquatic, kitchen appliance installation featuring GE, Whirlpool, Broan, and Delta brands, cabinetry and countertop replacement with laminate and hardwood specifications, interior drywall repairs, exterior porch post replacement, and foundation stabilization work. The scope materials list provides detailed brand names and model numbers for all fixtures and appliances, including kitchen and bathroom faucets, ranges, cooktops, refrigerators, tubs, showers, toilets, lighting fixtures, roofing materials, windows, and HVAC systems. A mandatory pre-bid meeting is scheduled for March 25, 2026 at 9:00 a.m. at the project site, with a deadline for submitting questions by March 27, 2026 at 12:00 p.m., and electronic bid submission required by April 6, 2026 at 2:00 p.m. Substantial completion must occur within 60 consecutive calendar days, with final completion within an additional 30 days.

Bidders must submit proposals on a lump sum basis with all pricing itemized and must provide a 5 percent bid bond, certified check, or cashier's check as surety, along with separate Performance and Payment bonds covering up to 100 percent of the award amount. Eligible bidders are licensed Division One General Contractors who are insured, in good standing with Escambia County, and hold a current Certificate of Authority to do business in Florida. Liquidated damages are assessed at $300 per calendar day for failure to meet project deadlines. Insurance requirements include workers' compensation with statutory limits, general liability with minimum $1,000,000 per occurrence and $2,000,000 annual aggregate, business auto liability of $1,000,000 per accident, and contractor's pollution liability of at least $1,000,000 per occurrence. All work must comply with federal, state, and local building codes and 2 CFR 200 requirements, Davis-Bacon Act wage requirements, E-Verify employment verification, and domestic preference for United States-produced materials. The scope materials list specifies that contractors shall use like, similar, or equal valued products if exact brand-name items are unavailable, that all electrical appliances must be EnergyStar approved with LED bulbs, and that contractors are responsible for protecting all surfaces and property from damage while the homeowner retains responsibility for furniture contents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.