Bid_Scope_Materials_List.docx

DOCX document 18 KB Posted

Attached to
NED Home Rehab - 2217 N. L St
Solicitation number
NED-S-2217-032526
Issued by
Escambia County, Florida

About this file

This is a Bid Scope Materials List for residential rehabilitation work being conducted by Escambia County, Florida for a homeowner at 2217 North L Street in Pensacola, Florida. The scope encompasses replacement and installation of kitchen appliances including a double bowl aluminum sink, Delta Savile faucet, GE range and cooktop, GE vented microwave, and Broan hood vent; bathroom fixtures including a round ceramic vanity sink, Delta faucets for bathroom sink and tub, American Standard tub and toilet, Sterling tub surround, Aquatic shower unit, and Broan exhaust fan; flooring materials consisting of Shaw LVP and carpet with specified pad; mechanical systems including an A.O. Smith 50-gallon water heater, Hunter ceiling fan, and HVAC system with specified SEER rating; lighting fixtures from Commercial Electric and Hampton Bay brands with LED bulbs; roofing materials from CertainTeed with aluminum gutters and downspouts; vinyl impact windows; and various finishing materials and supplies. The mandatory pre-quote walkthrough is scheduled for March 31, 2026, at 9:00 AM, with written questions due by April 8, 2026, at 1:00 PM and quote submissions required by April 9, 2026, at 1:00 PM through the OpenGov procurement portal. Award selection is set for April 10, 2026, and all work must be completed within a 60-day contract period with liquidated damages of $150 per day for delays.

The materials list includes detailed specifications and construction standards requiring new braided supply lines for plumbing, proper finishing of trim with putty, caulk, and paint, complete drywall finishing including tape and mud work, EnergyStar approved electrical appliances with LED bulbs, square-edged laminate countertops with 4-inch backsplash, and cabinetry constructed of plywood or better with solid hardwood fronts and side-mounted drawer guides. All pricing must be submitted on a firm, fixed-price basis with individual line items and a lump sum total incorporating labor, overhead, permits, insurance, and profit. Projects valued at $25,000 or higher require 100% Performance and Payment Bonds; projects under $15,000 require payment upon completion, while those exceeding $15,000 are eligible for a 40% draw at 50% completion with final payment upon substantial completion. All licensed and insured general contractors in good standing with Escambia County are eligible to bid, with no set-asides or disadvantaged enterprise restrictions identified. Required qualifications include Commercial General Liability and Automobile Liability coverage of $1,000,000, current worker's compensation insurance, state licensure, county licensing, and EPA RRP certifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.

File details come from the government source that posted it. Updated .