Bid_Scope_Materials_List.docx

DOCX document 18 KB Posted

Attached to
SHIP - NED Home Rehab - 8110 Imperial Ct
Solicitation number
PD 25-26.055
Issued by
Escambia County, Florida

About this file

This is a Bid Scope Materials List for a residential rehabilitation project issued by Escambia County, Florida under the State Housing Initiatives Partnership (SHIP) repair program for a single-family owner-occupied residence located at 8110 Imperial Court in Pensacola. The project encompasses comprehensive rehabilitation services including electrical rewiring, mechanical HVAC system installation, plumbing fixture upgrades, kitchen appliance installation, cabinetry and countertop replacement, interior drywall repairs, exterior porch post replacement, and foundation stabilization work. The scope specifies brand-name products and materials such as GE kitchen appliances, Delta and American Standard plumbing fixtures, Shaw flooring, Whirlpool refrigerator, Broan ventilation, CertainTeed roofing, and Hunter ceiling fans, with three optional scope items consisting of attic insulation, garage door replacement, and gutter installation. A mandatory pre-bid meeting is scheduled for March 25, 2026 at 9:00 a.m. at the project site, with a deadline for submitting questions by March 27, 2026 at 12:00 p.m., and electronic bid submission required by April 6, 2026 at 2:00 p.m. Eligible bidders must be licensed Division One General Contractors, insured, and in good standing with Escambia County, holding a current Certificate of Authority to do business in Florida. Substantial completion is required within 60 consecutive calendar days, with final completion within an additional 30 days, and liquidated damages assessed at $300 per calendar day for failure to meet deadlines.

Bids must be submitted on a lump sum basis with all pricing broken down, and bidders must provide a 5 percent bid bond, certified check, or cashier's check as surety, along with separate Performance and Payment bonds covering up to 100 percent of the award amount. Insurance requirements include workers' compensation with statutory limits, general liability with minimum $1,000,000 per occurrence and $2,000,000 annual aggregate, business auto liability of $1,000,000 per accident, and contractor's pollution liability of at least $1,000,000 per occurrence. No specific set-aside designations are identified for disadvantaged, women-owned, minority-owned, or small businesses. Federal compliance provisions require Davis-Bacon Act wage requirements for construction contracts exceeding $2,000, debarment and suspension verification through the System for Award Management (SAM), E-Verify employment verification, domestic preference for United States-produced materials, and restrictions on procurement of covered telecommunications equipment from specified foreign entities. All work must comply with federal, state, and local building codes and 2 CFR 200 requirements applicable to federally-funded contracts. The scope materials list includes detailed specifications and installation requirements, including use of EnergyStar-approved electrical appliances with LED bulbs, square-edged laminate countertops with 4-inch backsplash, plywood or better cabinetry with solid hardwood fronts, and braided supply lines for plumbing fixtures. Additional work beyond the defined scope may be authorized upon written county approval and allocated funding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.

File details come from the government source that posted it. Updated .