Bid_Scope_Materials_List.docx
DOCX document 18 KB Posted
- Attached to
- NED Home Rehab - 1953 Lansing Dr
- Solicitation number
- NED-S-1953-112125
- Issued by
- Escambia County, Florida
About this file
This is a Bid Scope Materials List for a residential rehabilitation project managed by Escambia County, Florida, through its Neighborhood Enterprise Development (NED) program located at 1953 Lansing Drive in Pensacola. The project encompasses comprehensive home rehabilitation including kitchen and bathroom fixture replacements, flooring installation, HVAC system updates, roofing, guttering, window replacements, and septic system overhaul. Specific materials are detailed for kitchen components (sink, faucet, range, cooktop, microwave, hood vent, and refrigerator), bathroom fixtures (vanity sink, faucets, tub, shower, toilet, and exhaust fan), flooring (LVP and carpet), hot water heater, ceiling fans, lighting fixtures, roofing materials, and windows. A mandatory pre-quote site walkthrough is scheduled for December 2, 2025, at 10:00 am, with questions accepted until December 9, 2025, at 1:00 pm. Quotes are due December 10, 2025, at 1:00 pm via the OpenGov procurement portal. The project has a 60-day completion timeline with liquidated damages of $150 per day for work extending beyond the contract period.
Only licensed, insured general contractors in good standing with Escambia County are eligible to bid. New contractors must submit a letter of insurability, proof of Sunbiz registration, a W-9 form, current contractor licensure, and business tax receipts. For projects valued at $25,000 or higher, 100% Performance and Payment Bonds are mandatory. Contractors must maintain Commercial General Liability insurance with $1,000,000 coverage naming Escambia County as an additional insured, and provide Worker's Compensation coverage or exemption. The county reserves the right to award line items individually for emergency roofing or septic/sewer services. The scope specifies that all electrical appliances must be ENERGY STAR approved with LED bulbs, all products must be new braided supply lines for plumbing fixtures, and cabinetry shall be constructed of plywood or better with solid hardwood fronts and frames. Contractors bear responsibility for moving furniture, while homeowners retain responsibility for its contents. The evaluation will identify the lowest, most responsive, and most responsible bidder, with payment structured based on project value.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NED_Home_Rehab_-_1953_Lansing_Dr.pdf | ||
| PERMIT_-_1953_Lansing_Dr_-_Akpatsu_DC.pdf | ||
| Bid_Scope_Materials_List.docx | DOCX document | |
| SCOPE_-_1953_Lansing_Dr_-_Akpatsu_DC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Scope Materials List
| Kitchen Sink | Double bowl aluminum drop-in. | ||
| Kitchen Faucet | Delta, Savile pull-down | ||
| Range | GE, JB645RKSS | ||
| Cooktop | GE, JP3030DJBB | ||
| Micro-Vented | GE, JVM3160RFSS | ||
| Hood Vent | Broan, BCSEK 30-in, 250cfm | ||
| Refrigerator | Whirlpool, WRT348FMES | ||
| Vanity Sink | Round ceramic drop-in | ||
| Bathroom Faucet | Delta, Woodhurst 1.5-gpm centerset | ||
| Tub Faucet | Delta, T13420-SS | ||
| Shower Faucet | Delta, T13220-SS | ||
| Tub | American Standard Solar, (60x30) | ||
| Tub Surround | Sterling, 61044100-0 (60x31.5) with corresponding tub | ||
| Shower | Aquatic, AX160304PS-WH | ||
| Toilet | American Standard Cadet 3, comfort height, elongated 1.28-GPF | ||
| Bathroom Fan | Broan QK60s, 60cfm | ||
| Flooring – LVP | Shaw, Torino Plus Floorte 500RG | ||
| Carpet | Shaw, Burghley 2 - 60oz. – 6lbs. Pad | ||
| Hot Water Heater | A.O. Smith Signature 900, 50-gallon | ||
| Ceiling Fan | Hunter, Anisten 52-in | ||
| Kitchen Light | Commercial Electric, 54663141 | ||
| Bathroom Light | Hampton Bay, V1124-79 | ||
| Hall Light | Hampton Bay, FZP8012-A | ||
| Coach Light | Hampton Bay, 245 746 | ||
| Ext. Ceiling Light | Hampton Bay, WB0325 | ||
| Light Bulbs | LED | ||
| Roofing | CertainTeed, Landmark | ||
| Gutter | 6” Aluminum with 4” downspouts |
Windows HVAC seer
· When repairing or replacing plumbing fixtures always use new braded supply lines.
· When repairing or replacing trim always putty, caulk, and paint.
· When repairing or replacing drywall always tape, mud, texture, and paint.
· When repairing or replacing electrical wiring always repair the drywall.
· Counter tops are to be square-edged, laminate with a 4” backsplash.
· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.
· Moving furniture is the contractor’s responsibility, its contents are the homeowners.
· All electrical appliances are to be EnergyStar approved with LED bulbs.
· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.
“Contractors are obligated to use like, similar, or equal valued products”.
File details come from the government source that posted it. Updated .