Bid Schedule Summary: Palm River Public Utility Renewal Areas 3, 5, and 6

This Bid Schedule document is a cost estimation template prepared by Collier County, Florida for the Palm River Areas 3, 5, and 6 Public Utilities Renewal project. The schedule itemizes infrastructure replacement work across three geographic areas spanning twelve streets in the Palm River neighborhood, including potable water system improvements (water main piping ranging from 6-inch to 10-inch in diameter, gate valves, fire hydrants, water services, and meter installations), wastewater system improvements (gravity sewer pipe replacement, sanitary sewer service laterals, precast concrete manholes, force main piping, and pump station rehabilitation), stormwater drainage improvements (various pipe sizes and catch basins), general construction activities (mobilization, maintenance of traffic, clearing and grubbing, tree removal and replacement, driveway restoration, and sidewalk installation), and roadway restoration including asphalt paving and curb work. Bids are due August 10, 2026, with a non-mandatory pre-bid conference scheduled for July 20, 2026. The project anticipates a contract duration of 940 calendar days from Notice to Proceed to substantial completion, with final completion required within 60 days thereafter. One contract will be awarded to cover all work across all three areas.

The bid schedule format presents unit prices and estimated quantities for each line item across four sections per area (General, Water System, Wastewater System, and Stormwater System), with all unit prices currently showing $0.00 pending contractor submission. The anticipated total project budget is $32.25 million, with an additional $600,000 Owner's Allowance allocated per area for unforeseen conditions, totaling $1.8 million in contingency reserves. The schedule requires bidders to provide certified bid bonds equal to 5% of the total bid amount, performance and payment bonds at 100% of the contract award amount, and comprehensive insurance coverage including worker's compensation and liability policies up to $5,000,000. Collier County is utilizing local vendor preference for this solicitation. Liquidated damages of $5,146 per calendar day apply for failure to achieve substantial completion. Bidders must hold Florida State Contractor and General Contractor licenses, provide five similar project references completed within the past five years, submit OSHA Class II Asbestos certifications, and demonstrate Florida Trench Safety Act compliance. Electronic bid submission is required through the OpenGov procurement portal.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid

ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 1: AREA 3 GENERAL
1.1Mobilization/Demobilization (Maximum 5% base bid)LS1$0.00
1.2Maintenance of TrafficLS1$0.00
1.3Survey Layout & Record DrawingsLS1$0.00
1.4Pre-Construction Video & PhotographsLS1$0.00
1.5Post-Construction VideoLS1$0.00
1.6Clearing & GrubbingLS1$0.00
1.7Vibratory MonitoringLS1$0.00
1.8Remove, Dispose, and Replace MailboxesEA125$0.00
1.9Remove and Dispose Concrete, Asphalt and Gravel DrivewaySY3,655$0.00
1.10Remove and Store Brick Paver DrivewaySY2,290$0.00
1.11Install Driveway
i.ConcreteSY3,055$0.00
ii.AsphaltSY600$0.00
iii.Brick PaversSY2,290$0.00
1.12Driveway Coatings and FinishesSY340$0.00
1.13Sidewalk
i.Removal and Replacement of Existing SidewalkSY860$0.00
ii.Temporary Sidewalk InstallationSY860$0.00
iii.New SidewalkSY1,640$0.00
1.14Detectable WarningsSY12$0.00
1.15Private Property Tree RemovalEA33$0.00
1.16Private Property Tree ReplacementEA33$0.00
SECTION 1 (GENERAL) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 2: AREA 3 WATER SYSTEM
2.1Water Main Pipelines
i.6-inch C900 DR18 PVCLF270$0.00
ii.8-inch C900 DR18 PVCLF3,150$0.00
iii.8-inch DR11 HDPELF0$0.00
iv.10-inch C900 DR18 PVCLF3,055$0.00
v.10-inch DR11 HDPELF0$0.00
2.2Gate Valves
i.6-inch Gate ValveEA1$0.00
ii.8-inch Gate ValveEA10$0.00
iii.10-inch Gate ValveEA10$0.00
2.3Fire Hydrant AssembliesEA14$0.00
2.4Water Services
i.Short Single ServiceEA26$0.00
ii.Short Double ServiceEA16$0.00
iii.Long Single ServiceEA29$0.00
iv.Long Double ServiceEA16$0.00
2.5Water Meters, Meter Boxes, and Backflow Devices
i.New Meter Box and New Backflow (Relocate Existing Meter)EA143$0.00
ii.New Meter Box (Relocate Existing Meter and Existing Backflow)EA29$0.00
2.6Connection to Existing Water Main
i.Cocohatchee Boulevard 10-inch WMEA0$0.00
ii.Saddlebrook Lane 8-inch WMEA1$0.00
iii.Viking Way & Palm River Boulevard 8-inch WMEA0$0.00
iv.Palm River Boulevard 8-inch WMEA0$0.00
v.Palm River Boulevard (Area 1) 8-inch WMEA0$0.00
vi.La Playa Golf Club 6-inch WMEA0$0.00
2.7Permanent Bacteriological Sample PointsEA1$0.00
2.8Air Release ValvesEA2$0.00
2.9Conflict Avoidance (Deflections not shown on drawings)EA4$0.00
2.10Removal and Disposal of Asbestos Concrete Water MainLF4,780$0.00
2.11Removal and Disposal of PVC, DI and CI Water MainLF1,790$0.00
2.12Grout Existing Water MainCY0$0.00
2.13Private Property Water ServiceEA0$0.00
SECTION 2 (WATER SYSTEM) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 3: AREA 3 WASTEWATER SYSTEM
3.1Gravity Sewer Pipe (Remove, Dispose & Replace)
i.8-inch SDR-26 PVCLF6,010$0.00
ii.10-inch SDR-26 PVCLF0$0.00
3.2Sanitary Sewer Service Lateral (Remove, Dispose, Replace, Reconnect)
i.Single Sanitary Sewer Service LateralEA85$0.00
ii.Double Sanitary Sewer Service LateralEA15$0.00
3.3Private Property Sewer Service Lateral ReplacementLF1,100$0.00
3.4Relocate Driveway Sanitary Service LateralEA10$0.00
3.5Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA21$0.00
3.6Grout and Abandon Existing Gravity Sewer MainCY0$0.00
3.7Connect Existing Gravity Sewer Main to New Sanitary MainEA0$0.00
3.8Remove and Dispose of PVC, DI, CI Force MainLF0$0.00
3.9Sanitary Sewer Force Main
i.4-inch C900 DR18 PVCLF0$0.00
ii.8-inch C900 DR18 PVCLF0$0.00
iii.10-inch DR11 HDPELF0$0.00
3.10Plug Valves
i.4-inchEA0$0.00
ii.8-inchEA0$0.00
3.11Connection to Existing Wastewater Force Main (at Viking and Palm River)EA0$0.00
3.12Air Release ValvesEA2$0.00
3.13Pump Station 103.09 Replacement and AbandonmentLS0$0.00
3.14Complete Pump Station RehabilitationLS0$0.00
3.15Road Restoration - Stabilized SubgradeSY1,575$0.00
3.16Road Restoration - Limerock Base
i.6-inchSY6,970$0.00
ii.8-inchSY7,120$0.00
3.17Road Restoration - 2-1/2" Asphalt (Two Lifts)SY13,500$0.00
3.18Final Pavement Striping, Marking, and SignsLS1$0.00
3.19Remove, Dispose & Replace Concrete Curb
i.Valley GutterLF1,905$0.00
iii.Type-E CurbLF155$0.00
3.20Milling and ResurfacingSY4,395$0.00
3.21Area 5 Pre and Post Bathymetric SurveyLS0$0.00
3.22Fiber Optic ConduitLF0$0.00
SECTION 3 (WASTEWATER SYSTEM) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 4: AREA 3 STORMWATER SYSTEM
4.114" X 23" ERCPLF55$0.00
4.218" RCPLF120$0.00
4.318" HDPE PipeLF9,015$0.00
4.419" X 30" ERCPLF116$0.00
4.524" RCPLF125$0.00
4.624" HDPE PipeLF890$0.00
4.724" X 38" ERCPLF0$0.00
4.830" HDPE PipeLF0$0.00
4.930" RCPLF80$0.00
4.1036" HDPELF0$0.00
4.1136" RCPLF0$0.00
4.12Catch Basin (Type-C)EA40$0.00
4.13Catch Basin (Type-D)EA9$0.00
4.14Catch Basin (Type-J)EA1$0.00
4.15Catch Basin (Type X)EA17$0.00
4.16Inline DrainEA72$0.00
4.17Junction BoxEA0$0.00
4.18Valley Gutter InletEA4$0.00
4.19Private Property Yard DrainEA20$0.00
4.20Mitered End SectionEA2$0.00
4.21Flared End SectionEA2$0.00
4.22Swale Grading (not associated with the above pay items)LF200$0.00
4.23Root BarrierLF200$0.00
4.24Retaining WallLF0$0.00
4.25Clean, Televise and Inspect Existing Stormwater Outfalls
i.Between Old Tamiami Trail and Westwood DriveEA0$0.00
ii.Between Westwood Drive and Forestwood DriveEA0$0.00
iii.Between Forestwood Drive and LakeEA0$0.00
iv.Between Existing Lake and Oakwood Drive (STA 2+00)EA0$0.00
v.Between Existing Lake and Oakwood Drive (STA 4+75)EA0$0.00
vi.Between Julie-Fe/Country Club Drive (North End) and LakeEA0$0.00
vii.Between Country Club Lane (East End) and Country Club Drive (South End)EA0$0.00
viii.Between Country Club Lane (West End) and LakeEA0$0.00
ix.Between Cypress Way West (STA 24+00) and LakeEA2$0.00
xBetween Cypress Way West (STA 20+00) and LakeEA2$0.00
xi.Between Cypress Way West (STA 15+00) and LakeEA2$0.00
SECTION 4 (STORMWATER SYSTEM) SUBTOTAL:$0.00
SUMMARY - AREA 3
Section 1: Area 3 General$0.00
Section 2: Area 3 Water System$0.00
Section 3: Area 3 Wastewater System$0.00
Section 4: Area 3 Stormwater System$0.00
SUBTOTAL - AREA 3:$0.00
Staff has allocated $600,000 in Owner's Allowance - for Owner's Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owner's Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 1: AREA 5 GENERAL
1.1Mobilization/Demobilization (Maximum 5% base bid)LS1$0.00
1.2Maintenance of TrafficLS1$0.00
1.3Survey Layout & Record DrawingsLS1$0.00
1.4Pre-Construction Video & PhotographsLS1$0.00
1.5Post-Construction VideoLS1$0.00
1.6Clearing & GrubbingLS1$0.00
1.7Vibratory MonitoringLS1$0.00
1.8Remove, Dispose, and Replace MailboxesEA142$0.00
1.9Remove and Dispose Concrete, Asphalt and Gravel DrivewaySY3,805$0.00
1.10Remove and Store Brick Paver DrivewaySY2,735$0.00
1.11Install Driveway
i.ConcreteSY3,185$0.00
ii.AsphaltSY620$0.00
iii.Brick PaversSY2,735$0.00
1.12Driveway Coatings and FinishesSY280$0.00
1.13Sidewalk
i.Removal and Replacement of Existing SidewalkSY0$0.00
ii.Temporary Sidewalk InstallationSY0$0.00
iii.New SidewalkSY1,030$0.00
1.14Detectable WarningsSY16$0.00
1.15Private Property Tree RemovalEA50$0.00
1.16Private Property Tree ReplacementEA50$0.00
SECTION 1 (GENERAL) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 2: AREA 5 WATER SYSTEM
2.1Water Main Pipelines
i.6-inch C900 DR18 PVCLF3,280$0.00
ii.8-inch C900 DR18 PVCLF2,015$0.00
iii.8-inch DR11 HDPELF0$0.00
iv.10-inch C900 DR18 PVCLF3,590$0.00
v.10-inch DR11 HDPELF0$0.00
2.2Gate Valves
i.6-inch Gate ValveEA4$0.00
ii.8-inch Gate ValveEA6$0.00
iii.10-inch Gate ValveEA7$0.00
2.3Fire Hydrant AssembliesEA16$0.00
2.4Water Services
i.Short Single ServiceEA16$0.00
ii.Short Double ServiceEA38$0.00
iii.Long Single ServiceEA20$0.00
iv.Long Double ServiceEA23$0.00
2.5Water Meters, Meter Boxes, and Backflow Devices
i.New Meter Box and New Backflow (Relocate Existing Meter)EA116$0.00
ii.New Meter Box (Relocate Existing Meter and Existing Backflow)EA34$0.00
2.6Connection to Existing Water Main
i.Cocohatchee Boulevard 10-inch WMEA1$0.00
ii.Saddlebrook Lane 8-inch WMEA0$0.00
iii.Viking Way & Palm River Boulevard 8-inch WMEA1$0.00
iv.Palm River Boulevard 8-inch WMEA0$0.00
v.Palm River Boulevard (Area 1) 8-inch WMEA0$0.00
vi.La Playa Golf Club 6-inch WMEA0$0.00
2.7Permanent Bacteriological Sample PointsEA1$0.00
2.8Air Release ValvesEA11$0.00
2.9Conflict Avoidance (Deflections not shown on drawings)EA4$0.00
2.10Removal and Disposal of Asbestos Concrete Water MainLF7,945$0.00
2.11Removal and Disposal of PVC, DI and CI Water MainLF0$0.00
2.12Grout Existing Water MainCY0$0.00
2.13Private Property Water ServiceEA3$0.00
SECTION 2 (WATER SYSTEM) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 3: AREA 5 WASTEWATER SYSTEM
3.1Gravity Sewer Pipe (Remove, Dispose & Replace)
i.8-inch SDR-26 PVCLF8,050$0.00
ii.10-inch SDR-26 PVCLF200$0.00
3.2Sanitary Sewer Service Lateral (Remove, Dispose, Replace, Reconnect)
i.Single Sanitary Sewer Service LateralEA150$0.00
ii.Double Sanitary Sewer Service LateralEA0$0.00
3.3Private Property Sewer Service Lateral ReplacementLF1,100$0.00
3.4Relocate Driveway Sanitary Service LateralEA20$0.00
3.5Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA30$0.00
3.6Grout and Abandon Existing Gravity Sewer MainCY7$0.00
3.7Connect Existing Gravity Sewer Main to New Sanitary MainEA0$0.00
3.8Removal and Disposal of PVC, DI, CI Force MainLF2,560$0.00
3.9Sanitary Sewer Force Main
i.4-inch C900 DR18 PVCLF22$0.00
ii.8-inch C900 DR18 PVCLF290$0.00
iii.10-inch DR11 HDPELF2,275$0.00
3.10Plug Valves
i.4-inchEA2$0.00
ii.8-inchEA1$0.00
3.11Connection to Existing Wastewater Force Main (at Viking and Palm River)EA1$0.00
3.12Air Release ValvesEA1$0.00
3.13Pump Station 103.09 Replacement and AbandonmentLS0$0.00
3.14Complete Pump Station RehabilitationLS1$0.00
3.15Road Restoration - Stabilized SubgradeSY23,615$0.00
3.16Road Restoration - Limerock Base
i.6-inchSY13,540$0.00
ii.8-inchSY7,050$0.00
3.17Road Restoration - 2-1/2" Asphalt (Two Lifts)SY20,175$0.00
3.18Final Pavement Striping, Marking, and SignsLS1$0.00
3.19Remove, Dispose & Replace Concrete Curb
i.Valley GutterLF0$0.00
ii.Type-E CurbLF0$0.00
3.20Milling and ResurfacingSY0$0.00
3.21Area 5 Pre and Post Bathymetric SurveyLS1$0.00
3.22Fiber Optic ConduitLF2,400$0.00
SECTION 3 (WASTEWATER SYSTEM) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 4: AREA 5 STORMWATER SYSTEM
4.114" X 23" ERCPLF0$0.00
4.218" RCPLF445$0.00
4.318" HDPE PipeLF5,300$0.00
4.419" X 30" ERCPLF25$0.00
4.524" RCPLF112$0.00
4.624" HDPE PipeLF302$0.00
4.724" X 38" ERCPLF46$0.00
4.830" HDPE PipeLF22$0.00
4.930" RCPLF76$0.00
4.1036" HDPELF40$0.00
4.1136" RCPLF53$0.00
4.12Catch Basin (Type-C)EA30$0.00
4.13Catch Basin (Type-D)EA2$0.00
4.14Catch Basin (Type-J)EA0$0.00
4.15Catch Basin (Type X)EA4$0.00
4.16Inline DrainEA39$0.00
4.17Junction BoxEA3$0.00
4.18Valley Gutter InletEA10$0.00
4.19Private Property Yard DrainEA0$0.00
4.20Mitered End SectionEA0$0.00
4.21Flared End SectionEA0$0.00
4.22Swale Grading (not associated with the above pay items)LF220$0.00
4.23Root BarrierLF220$0.00
4.24Retaining WallLF0$0.00
4.25Clean, Televise and Inspect Existing Stormwater Outfalls
i.Between Old Tamiami Trail and Westwood DriveEA2$0.00
ii.Between Westwood Drive and Forestwood DriveEA2$0.00
iii.Between Forestwood Drive and LakeEA2$0.00
iv.Between Existing Lake and Oakwood Drive (STA 2+00)EA2$0.00
v.Between Existing Lake and Oakwood Drive (STA 4+75)EA2$0.00
vi.Between Julie-Fe/Country Club Drive (North End) and LakeEA0$0.00
vii.Between Country Club Lane (East End) and Country Club Drive (South End)EA0$0.00
viii.Between Country Club Lane (West End) and LakeEA0$0.00
ix.Between Cypress Way West (STA 24+00) and LakeEA0$0.00
xBetween Cypress Way West (STA 20+00) and LakeEA0$0.00
xi.Between Cypress Way West (STA 15+00) and LakeEA0$0.00
SECTION 4 (STORMWATER SYSTEM) SUBTOTAL:$0.00
SUMMARY - AREA 5
Section 1: Area 5 General$0.00
Section 2: Area 5 Water System$0.00
Section 3: Area 5 Wastewater System$0.00
Section 4: Area 5 Stormwater System$0.00
SUBTOTAL - AREA 5:$0.00
Staff has allocated $600,000 in Owner's Allowance - for Owner's Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owner's Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 1: AREA 6 GENERAL
1.1Mobilization/Demobilization (Maximum 5% base bid)LS1$0.00
1.2Maintenance of TrafficLS1$0.00
1.3Survey Layout & Record DrawingsLS1$0.00
1.4Pre-Construction Video & PhotographsLS1$0.00
1.5Post-Construction VideoLS1$0.00
1.6Clearing & GrubbingLS1$0.00
1.7Vibratory MonitoringLS1$0.00
1.8Remove, Dispose, and Replace MailboxesEA40$0.00
1.9Remove and Dispose Concrete, Asphalt and Gravel DrivewaySY1,665$0.00
1.10Remove and Store Brick Paver DrivewaySY290$0.00
1.11Install Driveway
i.ConcreteSY1,215$0.00
ii.AsphaltSY450$0.00
iii.Brick PaversSY290$0.00
1.12Driveway Coatings and FinishesSY250$0.00
1.13Sidewalk
i.Removal and Replacement of Existing SidewalkSY180$0.00
ii.Temporary Sidewalk InstallationSY180$0.00
iii.New SidewalkSY0$0.00
1.14Detectable WarningsSY3$0.00
1.15Private Property Tree RemovalEA33$0.00
1.16Private Property Tree ReplacementEA33$0.00
SECTION 1 (GENERAL) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 2: AREA 6 WATER SYSTEM
2.1Water Main Pipelines
i.6-inch C900 DR18 PVCLF1,455$0.00
ii.8-inch C900 DR18 PVCLF2,450$0.00
iii.8-inch DR11 HDPELF0$0.00
iv.10-inch C900 DR18 PVCLF0$0.00
v.10-inch DR11 HDPELF484$0.00
2.2Gate Valves
i.6-inch Gate ValveEA12$0.00
ii.8-inch Gate ValveEA15$0.00
iii.10-inch Gate ValveEA0$0.00
2.3Fire Hydrant AssembliesEA10$0.00
2.4Water Services
i.Short Single ServiceEA20$0.00
ii.Short Double ServiceEA4$0.00
iii.Long Single ServiceEA5$0.00
iv.Long Double ServiceEA4$0.00
2.5Water Meters, Meter Boxes, and Backflow Devices
i.New Meter Box and New Backflow (Relocate Existing Meter)EA57$0.00
ii.New Meter Box (Relocate Existing Meter and Existing Backflow)EA24$0.00
2.6Connection to Existing Water Main
i.Cocohatchee Boulevard 10-inch WMEA0$0.00
ii.Saddlebrook Lane 8-inch WMEA0$0.00
iii.Viking Way & Palm River Boulevard 8-inch WMEA0$0.00
iv.Palm River Boulevard 8-inch WMEA1$0.00
v.Palm River Boulevard (Area 1) 8-inch WMEA1$0.00
vi.La Playa Golf Club 6-inch WMEA1$0.00
2.7Permanent Bacteriological Sample PointsEA2$0.00
2.8Air Release ValvesEA2$0.00
2.9Conflict Avoidance (Deflections not shown on drawings)EA4$0.00
2.10Removal and Disposal of Asbestos Concrete Water MainLF3,670$0.00
2.11Removal and Disposal of PVC, DI and CI Water MainLF0$0.00
2.12Grout Existing Water MainCY8$0.00
2.13Private Property Water ServiceEA0$0.00
SECTION 2 (WATER SYSTEM) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 3: AREA 6 WASTEWATER SYSTEM
3.1Gravity Sewer Pipe (Remove, Dispose & Replace)
i.8-inch SDR-26 PVCLF2,840$0.00
ii.10-inch SDR-26 PVCLF0$0.00
3.2Sanitary Sewer Service Lateral (Remove, Dispose, Replace, Reconnect)
i.Single Sanitary Sewer Service LateralEA14$0.00
ii.Double Sanitary Sewer Service LateralEA20$0.00
3.3Private Property Sewer Service Lateral ReplacementLF550$0.00
3.4Relocate Driveway Sanitary Service LateralEA10$0.00
3.5Precast Polymer Concrete Manholes (Remove, Dispose, Replace)EA19$0.00
3.6Grout and Abandon Existing Gravity Sewer MainCY10$0.00
3.7Connect Existing Gravity Sewer Main to New Sanitary MainEA6$0.00
3.8Removal and Disposal of PVC, DI, CI Force MainLF1,165$0.00
3.9Sanitary Sewer Force Main
i.4-inch C900 DR18 PVCLF1,075$0.00
ii.8-inch C900 DR18 PVCLF0$0.00
iii.10-inch DR11 HDPELF0$0.00
3.10Plug Valves
i.4-inchEA1$0.00
ii.8-inchEA0$0.00
3.11Connection to Existing Wastewater Force Main (at Viking and Palm River)EA0$0.00
3.12Air Release ValvesEA1$0.00
3.13Pump Station 103.09 Replacement and AbandonmentLS1$0.00
3.14Complete Pump Station RehabilitationLS0$0.00
3.15Road Restoration - Stabilized SubgradeSY11,680$0.00
3.16Road Restoration - Limerock Base
i.6-inchSY9,890$0.00
ii.8-inchSY0$0.00
3.17Road Restoration - 2-1/2" Asphalt (Two Lifts)SY9,900$0.00
3.18Final Pavement Striping, Marking, and SignsLS1$0.00
3.19Remove, Dispose & Replace Concrete Curb
i.Valley GutterLF6,220$0.00
ii.Type-E CurbLF110$0.00
3.20Milling and ResurfacingSY0$0.00
3.21Area 5 Pre and Post Bathymetric SurveyLS0$0.00
3.22Fiber Optic ConduitLF1,100$0.00
SECTION 3 (WASTEWATER SYSTEM) SUBTOTAL:$0.00
ITEM NO.DESCRIPTIONUNITUNIT PRICEEST. QTY.AMOUNT ($)
SECTION 4: AREA 6 STORMWATER SYSTEM
4.114" X 23" ERCPLF0$0.00
4.218" RCPLF150$0.00
4.318" HDPE PipeLF1,000$0.00
4.419" X 30" ERCPLF0$0.00
4.524" RCPLF0$0.00
4.624" HDPE PipeLF0$0.00
4.724" X 38" ERCPLF0$0.00
4.830" HDPE PipeLF0$0.00
4.930" RCPLF0$0.00
4.1036" HDPELF0$0.00
4.1136" RCPLF0$0.00
4.12Catch Basin (Type-C)EA0$0.00
4.13Catch Basin (Type-D)EA1$0.00
4.14Catch Basin (Type-J)EA0$0.00
4.15Catch Basin (Type X)EA2$0.00
4.16Inline DrainEA0$0.00
4.17Junction BoxEA0$0.00
4.18Valley Gutter InletEA10$0.00
4.19Private Property Yard DrainEA0$0.00
4.20Mitered End SectionEA0$0.00
4.21Flared End SectionEA0$0.00
4.22Swale Grading (not associated with the above pay items)LF200$0.00
4.23Root BarrierLF200$0.00
4.24Retaining WallLF10$0.00
4.25Clean, Televise and Inspect Existing Stormwater Outfalls
i.Between Old Tamiami Trail and Westwood DriveEA0$0.00
ii.Between Westwood Drive and Forestwood DriveEA0$0.00
iii.Between Forestwood Drive and LakeEA0$0.00
iv.Between Existing Lake and Oakwood Drive (STA 2+00)EA0$0.00
v.Between Existing Lake and Oakwood Drive (STA 4+75)EA0$0.00
vi.Between Julie-Fe/Country Club Drive (North End) and LakeEA1$0.00
vii.Between Country Club Lane (East End) and Country Club Drive (South End)EA1$0.00
viii.Between Country Club Lane (West End) and LakeEA1$0.00
ix.Between Cypress Way West (STA 24+00) and LakeEA0$0.00
xBetween Cypress Way West (STA 20+00) and LakeEA0$0.00
xi.Between Cypress Way West (STA 15+00) and LakeEA0$0.00
SECTION 4 (STORMWATER SYSTEM) SUBTOTAL:$0.00
SUMMARY - AREA 6
Section 1: Area 6 General$0.00
Section 2: Area 6 Water System$0.00
Section 3: Area 6 Wastewater System$0.00
Section 4: Area 6 Stormwater System$0.00
SUBTOTAL - AREA 6:$0.00
Staff has allocated $600,000 in Owner's Allowance - for Owner's Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owner's Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
SUBTOTAL - AREA 3:$0.00
SUBTOTAL - AREA 5:$0.00
SUBTOTAL - AREA 6:$0.00
GRAND TOTAL ALL AREAS$0.00

&G &"-,Bold"BID SCHEDULE

COLLIER COUNTY

PALM RIVER PUBLIC UTILITY RENEWAL

AREAS 3, 5, and 6

PALM RIVER PUBLIC UTILITY RENEWAL &P Section III-&P image1.tiff

File details come from the government source that posted it. Updated .