Bid Schedule Durango Irrigation Raw Water Line Replacement.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Durango Irrigation Raw Water Line Replacement
Solicitation number
2025-0039
Issued by
La Plata County, Colorado

About this file

This is a bid schedule spreadsheet for the City of Durango's Raw Water Line Replacement project #0014, running from Schneider Park Pumphouse to Greenmount Cemetery. The project involves installing a 10-inch HDPE raw water irrigation line from the existing pump shed at 950 Roosa Avenue to Greenmount Cemetery at 900 Cemetery Road, with key quantities including 1,280 linear feet of HDPE pipe, 225 square yards of asphalt patching, 175 cubic yards of flow-fill, and various connection points and fittings. The scope encompasses mobilization, construction surveying, record drawings, quality control testing, erosion control, traffic control, miscellaneous dirt work, pipe installation with bedding and backfill, sidewalk and curb replacement, irrigation connections, and temporary fencing.

The bid schedule is structured with general items and civil waterline installation components, plus two add alternates for parking lot repaving: Add Alternate 1 covers 1,110 square yards for the Maintenance Shop Parking Lot, and Add Alternate 2 covers 555 square yards for Schneider Park Parking Lot. The spreadsheet template requires contractors to fill in unit costs for each line item, with all cost fields currently showing zero as placeholders. Contractors must provide their company information, contact details, and submission date, with the document serving as the formal pricing submission format for this Colorado municipal infrastructure project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Tab

CITY OF DURANGO
RAW WATERLINE REPLACEMENT #0014
SCHNEIDER PARK PUMPHOUSE TO GREENMOUNT CEMETERY
BID SCHEDULE - FILL HIGHLIGHTED AREAS ONLY
Item #ITEM DescriptionUNITQuantityUnit CostTOTAL COST
General
101MobilizationLS1$ - 0
102Construciton SurveyingLS1$ - 0
103Record DrawingsLS1$ - 0
104Quality Control/TestingLS1$ - 0
105Erosion Control/Storm Water ManagementLS1$ - 0
106Traffic ControlLS1$ - 0
Subtotal (A):$ - 0
Civil - Waterline Installation
203Misc. dirt work and flat work at pump houseLS1$ - 0
204HDPE Pipe in Trench 10" DR9 (Includes bedding and native backfill, irrigation wire, Sidewalk and curb & gutter replacement)LF1280$ - 0
205HDPE Pipe Fitting - 45 Degree BendEach2$ - 0
206Asphalt Patching (Includes Base Course and Compaction)SY225$ - 0
207Flow-fill (pipe encasement and backfill at roads)CY175$ - 0
2082' Irrigation stub and pipe connection, 2" diameter line with 2" gate valveEach1$ - 0
209Connection 1 - PumphouseEach1$ - 0
210Connection 2 - Irrigation System at CemeteryEach1$ - 0
211Temporary FencingLS1$ - 0

Subtotal (B): $ - 0

Add Alternate 1 - Repave Maintenance Shop Parking Lot
300Remove asphalt, Install Base Course and Asphalt Per planSY1110$ - 0
Add Alternate #1 Total Cost:$ - 0
Add Alternate 2 - Schneider Park Parking Lot
301Remove asphalt, Install Base Course and Asphalt Per planSY555$ - 0
Add Alternate #2 Total Cost:$ - 0
Project Total (A+B):$ - 0
Contractor Name _______________________________________
Contact _______________________________________________
Address _______________________________________________
Telephone __________________ Email ____________________
Date__________________________
(end of bid schedule)