Bid_Schedule_-_Beach_Access_Upgrades.xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- Beach Access Upgrades Federal contract opportunity
- Solicitation number
- 140P6425B0014
About this file
This document is a Bid Schedule for a Beach Access Upgrades project at Apostle Islands National Lakeshore in Bayfield, Wisconsin. The solicitation (140P6425B0014) is for a firm-fixed price construction contract valued between $500,000 and $750,000, anticipated to begin in March/April 2026. The project involves removing existing structures and vegetation, and constructing a new staircase, pathway, concrete paving, retaining walls, and conducting vegetative surface restoration. The procurement is 100% set aside for Total Small Businesses under NAICS code 237990, with a size standard of $45 million.
The bid schedule includes a base bid and three optional upgrades: Option #1 involves a staircase upgrade using concrete instead of wood, Option #2 proposes a concrete accessible pathway in lieu of aggregate, and Option #3 covers plantings and landscaping upgrades. The bidding document requires offerors to submit pricing for both base and optional line items, with pricing broken down by materials, labor, and equipment for each scope of work. Bidders must be registered in SAM, have a UEI number, and comply with Construction Wage Rate Requirements for Bayfield County, Wisconsin. The contracting officer is Craig D Bryant from the Department of the Interior National Park Service Midwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_-_Construction_Contract_Admin.pdf | ||
| Attachment_-_Drawings-Plans.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Sol_140P6425B0014.pdf | ||
| Bid_Schedule_-_Beach_Access_Upgrades.pdf | ||
| Wage_Determination_-_Bayfield_Co.pdf | ||
| Attachment_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Attachment_-_Submittal_List.pdf | ||
| Specifications_-_Beach_Access_Upgrades.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLANK Price Schedule APIS
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | |||||
| PARK - PMIS: | Apostle Islands National Lakeshore - 313908 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Meyer's Beach, WI | ||||
| Project Title: | Construct ABA Path and Staircase | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Base Bid | 1 | Lump Sum | ||
| 2 | Bid Option 1 | 1 | Lump Sum | ||
| 3 | Bid Option 2 | 1 | Lump Sum | ||
| 4 | Bid Option 3 | 1 | Lump Sum | ||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| TOTAL PROPOSED PRICE - (Contract Line Item Numbers 1 through 4) -------------------------- | |||||
| All measurement and payment information is included in Division 01 Specifications, Item 12 - Definition of Contract Line Items. |
BLANK BID SCHEDULE
| Apostle Islands National Lakeshore | ||
| U.S. Department of Interior | 415 Washington Ave |
Bayfield, WI 54814 National Park Service Facility Management Division
PROJECT: Beach Access Upgrades
BID SCHEDULE
Construction Items Unit Quantity Price/ Unit Subtotal
| BASE BID - Mobilization/Demobilization | |||
| - Mob/Demob Costs | LS | 1 | $ - 0 |
| BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
| BASE BID - SITE EARTHWORK and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
| BASE BID - SITE EROSION CONTROL and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
| BASE BID - SITE WALKS AND PATHWAY and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
| BASE BID - SITE WALLS AND STAIRCASE and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
| BASE BID - SEEDING and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
SUBTOTAL $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (BASE BID) $ - 0
| OPTION #1 - STAIRCASE UPGRADE (Concrete in lieu of wood) and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
SUBTOTAL $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (OPTION #1) $ - 0
| OPTION #2 - CONCRETE ACCESSIBLE PATHWAY (In lieu of aggregate) and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
SUBTOTAL $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (OPTION #2) $ - 0
| OPTION #3 - PLANTINGS/LANDSCAPING UPGRADES and all associated work/items | |||
| - Materials | LS | 1 | $ - 0 |
| - Labor | LS | 1 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 |
SUBTOTAL $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (OPTION #3) $ - 0
Grand Total (Base Bid + Option #1 + Option #2 + Option #3) $ - 0
Printed: &D &T &Z&F
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
image1.png
File details come from the government source that posted it. Updated .