Bid_Schedule_-_Beach_Access_Upgrades.pdf
PDF 155 KB Posted
- Attached to
- Beach Access Upgrades Federal contract opportunity
- Solicitation number
- 140P6425B0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_-_Construction_Contract_Admin.pdf | ||
| Attachment_-_Drawings-Plans.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Sol_140P6425B0014.pdf | ||
| Bid_Schedule_-_Beach_Access_Upgrades.xlsx | XLSX spreadsheet | |
| Wage_Determination_-_Bayfield_Co.pdf | ||
| Attachment_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Attachment_-_Submittal_List.pdf | ||
| Specifications_-_Beach_Access_Upgrades.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Quantity Price/ Unit Subtotal
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
LS 1 -$
OPTION #3 - PLANTINGS/LANDSCAPING UPGRADES and all associated work/items
- Materials
- Labor
Overhead Profit
Grand Total (Base Bid + Option #1 + Option #2 + Option #3)
- Equipment
Bonds
Grand Total (OPTION #3)
415 Washington Ave Bayfield, WI 54814
Construction Items
National Park Service U.S. Department of Interior
Apostle Islands National Lakeshore
Facility Management Division
BID SCHEDULE
BASE BID - SITE EARTHWORK and all associated work/items
PROJECT: Beach Access Upgrades
BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items
- Equipment
BASE BID - SITE WALKS AND PATHWAY and all associated work/items
BASE BID - Mobilization/Demobilization
- Mob/Demob Costs
- Materials
- Labor
- Equipment
- Materials
- Labor
BASE BID - SITE EROSION CONTROL and all associated work/items
- Materials
- Equipment
- Labor
- Labor
- Materials
- Labor
- Equipment
BASE BID - SITE WALLS AND STAIRCASE and all associated work/items
- Materials
- Labor
- Equipment
BASE BID - SEEDING and all associated work/items
- Materials
- Equipment
- Equipment
OPTION #2 - CONCRETE ACCESSIBLE PATHWAY (In lieu of aggregate) and all associated work/items
Grand Total (BASE BID)
Overhead
SUBTOTAL
Bonds Profit
OPTION #1 - STAIRCASE UPGRADE (Concrete in lieu of wood) and all associated work/items
- Materials
- Labor
Overhead
SUBTOTAL
SUBTOTAL
SUBTOTAL
- Labor
- Equipment
Profit Bonds
Grand Total (OPTION #1)
- Materials
Overhead Profit Bonds
Grand Total (OPTION #2)
BLANK BID SCHEDULE
File details come from the government source that posted it. Updated .