File Type Posted
Attachment_-_Construction_Contract_Admin.pdf PDF
Attachment_-_Drawings-Plans.pdf PDF
Attachment_-_Notice_to_Contractors.pdf PDF
Sol_140P6425B0014.pdf PDF
Bid_Schedule_-_Beach_Access_Upgrades.xlsx XLSX spreadsheet
Wage_Determination_-_Bayfield_Co.pdf PDF
Attachment_-_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
Attachment_-_Submittal_List.pdf PDF
Specifications_-_Beach_Access_Upgrades.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

LS 1 -$

OPTION #3 - PLANTINGS/LANDSCAPING UPGRADES and all associated work/items

- Materials

- Labor

Overhead Profit

Grand Total (Base Bid + Option #1 + Option #2 + Option #3)

- Equipment

Bonds

Grand Total (OPTION #3)

415 Washington Ave Bayfield, WI 54814

Construction Items

National Park Service U.S. Department of Interior

Apostle Islands National Lakeshore

Facility Management Division

BID SCHEDULE

BASE BID - SITE EARTHWORK and all associated work/items

PROJECT: Beach Access Upgrades

BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items

- Equipment

BASE BID - SITE WALKS AND PATHWAY and all associated work/items

BASE BID - Mobilization/Demobilization

- Mob/Demob Costs

- Materials

- Labor

- Equipment

- Materials

- Labor

BASE BID - SITE EROSION CONTROL and all associated work/items

- Materials

- Equipment

- Labor

- Labor

- Materials

- Labor

- Equipment

BASE BID - SITE WALLS AND STAIRCASE and all associated work/items

- Materials

- Labor

- Equipment

BASE BID - SEEDING and all associated work/items

- Materials

- Equipment

- Equipment

OPTION #2 - CONCRETE ACCESSIBLE PATHWAY (In lieu of aggregate) and all associated work/items

Grand Total (BASE BID)

Overhead

SUBTOTAL

Bonds Profit

OPTION #1 - STAIRCASE UPGRADE (Concrete in lieu of wood) and all associated work/items

- Materials

- Labor

Overhead

SUBTOTAL

SUBTOTAL

SUBTOTAL

- Labor

- Equipment

Profit Bonds

Grand Total (OPTION #1)

- Materials

Overhead Profit Bonds

Grand Total (OPTION #2)