The file is a bid schedule for the Beach Access Upgrades project at Apostle Islands National Lakeshore, prepared by the U.S. Department of Interior National Park Service. The bid schedule outlines a comprehensive construction project with a base bid and four additional optional upgrades, including site preparation, demolition, site improvements, staircase upgrades (wood/metal grate and concrete options), an accessible concrete pathway, and a prefabricated overlook deck.
The related federal contract opportunity (Solicitation Number: 140P6425B0007) is a firm-fixed price construction project valued between $500,000 and $750,000, scheduled to begin in May/June 2025. The project is 100% set aside for small businesses under NAICS Code 237990, with a size standard of $45 million. Contractors must have a UEI number and be registered in SAM. The project requires removal and installation of beach access infrastructure, including parking areas, pathways, staircases, and retaining walls, with construction wage rate requirements specific to Bayfield County, Wisconsin. The point of contact is Craig D Bryant, Contracting Officer, who can be reached at craig_bryant@nps.gov or 330-468-2500 x6.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Apostle Islands National Lakeshore | ||
| U.S. Department of Interior | 415 Washington Ave |
Bayfield, WI 54814 National Park Service Facility Management Division
PROJECT: Beach Access Upgrades
BID SCHEDULE
Construction Items Unit Quantity Price/ Unit Subtotal
| Mobilization/Demobilization | ||||
| - Mob/Demob Costs | LS | 1 | $ - 0 | $ - 0 |
| Site Preparation / Site Demolition and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| Site Improvements / Beach Access Upgrades and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
Subtotal $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (Base Bid) $ - 0
| Option #1 - Staircase Upgrade (Wood/Metal Grate Treads in lieu of just Wood/Wood Treads) and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (Option #1) $ - 0
| Option #2 - Staircase Upgrade (Concrete in lieu of Wood/Metal Grate Treads and Wood/Wood Treads) and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (Option #2) $ - 0
| Option #3 - Concrete Accessible Pathway (in lieu of just aggregate gravel) and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (Option #3) $ - 0
| Option #4 - Prefabricated Overlook Deck and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (Option #4) $ - 0
Grand Total (Base Bid + Option #1 + Option #2 + Option #3 + Option #4) $ - 0