Bid_Schedule_-_Beach_Access.pdf
PDF 153 KB Posted
- Attached to
- Beach Access Upgrades
- Solicitation number
- 140P6425B0007
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Quantity Price/ Unit Subtotal
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
- Materials
- Labor
Site Improvements / Beach Access Upgrades and all associated work/items
PROJECT: Beach Access Upgrades
Site Preparation / Site Demolition and all associated work/items
- Labor
Mobilization/Demobilization
- Mob/Demob Costs
- Materials
- Equipment
- Equipment
415 Washington Ave Bayfield, WI 54814
Construction Items
National Park Service U.S. Department of Interior
Apostle Islands National Lakeshore
Facility Management Division
BID SCHEDULE
Grand Total (Base Bid)
Overhead
Subtotal
Bonds Profit
Option #1 - Staircase Upgrade (Wood/Metal Grate Treads in lieu of just Wood/Wood Treads) and all associated work/items
- Materials
- Labor
Option #2 - Staircase Upgrade (Concrete in lieu of Wood/Metal Grate Treads and Wood/Wood Treads) and all associated work/items
Overhead Profit Bonds
Grand Total (Option #1)
- Materials
- Labor
Overhead Profit Bonds
Grand Total (Option #2)
Option #3 - Concrete Accessible Pathway (in lieu of just aggregate gravel) and all associated work/items
- Materials
- Materials
- Labor
Overhead Profit
Grand Total (Base Bid + Option #1 + Option #2 + Option #3 + Option #4)
Bonds
Grand Total (Option #4)
- Labor
Option #4 - Prefabricated Overlook Deck and all associated work/items
Overhead Profit Bonds
Grand Total (Option #3)
Sheet1
File details come from the government source that posted it. Updated .