Bid_Schedule_-_Beach_Access.pdf

PDF 153 KB Posted

Attached to
Beach Access Upgrades
Solicitation number
140P6425B0007
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

- Materials

- Labor

Site Improvements / Beach Access Upgrades and all associated work/items

PROJECT: Beach Access Upgrades

Site Preparation / Site Demolition and all associated work/items

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

- Materials

- Equipment

- Equipment

415 Washington Ave Bayfield, WI 54814

Construction Items

National Park Service U.S. Department of Interior

Apostle Islands National Lakeshore

Facility Management Division

BID SCHEDULE

Grand Total (Base Bid)

Overhead

Subtotal

Bonds Profit

Option #1 - Staircase Upgrade (Wood/Metal Grate Treads in lieu of just Wood/Wood Treads) and all associated work/items

- Materials

- Labor

Option #2 - Staircase Upgrade (Concrete in lieu of Wood/Metal Grate Treads and Wood/Wood Treads) and all associated work/items

Overhead Profit Bonds

Grand Total (Option #1)

- Materials

- Labor

Overhead Profit Bonds

Grand Total (Option #2)

Option #3 - Concrete Accessible Pathway (in lieu of just aggregate gravel) and all associated work/items

- Materials

- Materials

- Labor

Overhead Profit

Grand Total (Base Bid + Option #1 + Option #2 + Option #3 + Option #4)

Bonds

Grand Total (Option #4)

- Labor

Option #4 - Prefabricated Overlook Deck and all associated work/items

Overhead Profit Bonds

Grand Total (Option #3)

Sheet1

File details come from the government source that posted it. Updated .