Bid Schedule - Attachment 2.xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- Cannon AFB - Protective Painting IDIQ Federal contract opportunity
- Solicitation number
- FA4855
About this file
This document is a pricing schedule, Attachment 2, related to a federal contract opportunity for protective painting and coating services at Cannon Air Force Base in New Mexico.
The pricing schedule lists various line items for interior and exterior painting, pavement marking, epoxy flooring, and miscellaneous surface preparation work, with estimated annual quantities and unit prices. The contract has a 5-year ordering period from July 29, 2024 to July 28, 2029. The government intends this to be a Total Small Business Set-Aside solicitation, with proposals due 30 days after the solicitation opens, estimated to be between June 1-7, 2024. The contractor's unit prices must include overhead, profit, and applicable taxes. Additional details on the contract requirements are provided in the related Statement of Work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Painting Project Summary - Attachment 3.pdf | ||
| Protective Coatings SOW - Attachment 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY24 - Pricing
PRICE LIST
The contractor’s unit prices includes all applicable Overhead, Profit, and Taxes, including NMGRT.
| Item No. | Description | Estimated Annual Qty. | Unit | Unit Price | Estimated Extended Price |
| 1. INTERIOR SURFACES | |||||
| 1A | Prep/Paint Interior Walls and Ceilings | 56,250 | SF | $ - 0 | |
| 1B | Prep/Paint Interior Walls Over 10' Tall | 1,500 | SF | $ - 0 | |
| 1C | Prep/Paint Interior Walls and Ceilings (Brick Masonry, Concrete Masonry Units [CMU] Block) | 2,250 | SF | $ - 0 | |
| 1D | Prep/Paint Interior Walls Over 10' Tall (Brick Masonry, CMU Block) | 1,250 | SF | $ - 0 | |
| 1E | Prep/Paint Interior Doors and Frames | 45 | EA | $ - 0 | |
| 1F | Prep/Paint Interior of Roll-Up or Hangar Doors and Frames | 600 | SF | $ - 0 | |
| 1G | Prep/Paint Interior Windows and Frames | 235 | LF | $ - 0 | |
| 1H | Prep/Stain/Varnish Interior Doors and Frames | 2 | EA | $ - 0 | |
| 1I | Prep/Stain/Varnish Interior Windows and Frames | 1 | EA | $ - 0 | |
| 1J | Prep/Paint Interior Wood/Composite/Plastic Trim (Up to 12" Wide) | 52 | LF | $ - 0 | |
| 1K | Prep/Paint Interior Metal Trim (Up to 12" Wide) | 3,795 | LF | $ - 0 | |
| 1L | Prep/Paint Interior Metal Trim (Over 12" Wide) | 173 | LF | $ - 0 | |
| 1M | Tape, Bed, Texture Interior Walls | 1,523 | SF | $ - 0 | |
| 1N | Remove Wall Coverings | 18 | SF | $ - 0 | |
| 1O | Patch Wall Coverings | 10 | SF | $ - 0 | |
| 1P | Remove, Prep, Furnish and Install Acoustical Material | 7 | SF | $ - 0 | |
| 1Q | Remove Wall Paper | 1,500 | SF | $ - 0 | |
| 1R | Prep/Paint Interior Ceiling/Roofing Open Web Metal Joists | 75 | SF | $ - 0 | |
| 1S | Prep/Paint Interior Steel Beams, Vertical | 82 | SF | $ - 0 | |
| 1T | Prep/Paint Interior Steel Beams, Horizontal | 12 | SF | $ - 0 | |
| 1U | Prep/Paint Interior Concrete Floors (General) | 450 | SF | $ - 0 | |
| 1V | Prep/Paint Interior Piping and Conduits | 375 | LF | $ - 0 | |
| 2. EXTERIOR SURFACES | |||||
| 2A | Prep/Paint Exterior Facility Surfaces (Concrete, Stucco) | 19,500 | SF | $ - 0 | |
| 2B | Prep/Paint Exterior Facility Surfaces (Brick Masonry, CMU Block) | 1,200 | SF | $ - 0 | |
| 2C | Prep/Paint Exterior Facility Surfaces (Miscellaneous Wood) | 225 | SF | $ - 0 | |
| 2D | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (up to 12" Wide) | 1,500 | LF | $ - 0 | |
| 2E | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (over 12" Wide) | 180 | LF | $ - 0 | |
| 2F | Prep/Paint Exterior Surfaces (Steel) | 750 | SF | $ - 0 | |
| 2G | Prep/Paint Exterior Personnel Doors and Frames (Includes Caulking) | 3 | EA | $ - 0 | |
| 2H | Prep/Paint Exterior Roll-Up or Hangar Doors and Frames (Includes Caulking) | 975 | SF | $ - 0 | |
| 2I | Prep/Paint Exterior Windows and Frames (Includes Caulking) | 375 | LF | $ - 0 | |
| 2J | Prep/Paint Miscellaneous Cylindrical Equipment (Includes Fire Hydrants, Post Indicator Valves, Bollards, Round Enclosures) | 450 | SF | $ - 0 | |
| 2K | Prep/Paint Miscellaneous Metal Structures | 1,125 | SF | $ - 0 | |
| 2L | Prep/Paint Miscellaneous Metal Structures (Portions Over 10', Excludes Steel Tanks) | 375 | SF | $ - 0 | |
| 2M | Prep/Paint Steel Tanks, Up to 4,000 Gallon Capacity (Exterior Only) | 225 | SF | $ - 0 | |
| 2N | Prep/Paint Fuel Pipes (Not to Exceed 1" Diameter) | 30 | LF | $ - 0 | |
| 2O | Prep/Paint Exterior Piping and Conduits | 38 | LF | $ - 0 | |
| 3. PAVEMENT MARKINGS | |||||
| 3A | Prep/Paint 4" Wide Street Striping | 15,000 | LF | $ - 0 | |
| 3B | New Pavement Marking Layout | 750 | LF | $ - 0 | |
| 3C | Prep/Paint Parking Lot Striping | 18,000 | LF | $ - 0 | |
| 3D | Prep/Paint Traffic Control Word Marking (per Complete Word, Such as "Stop" or "Yield") | 15 | EA | $ - 0 | |
| 3E | Prep/Paint Standard Blue and White Handicap Symbol | 7 | EA | $ - 0 | |
| 3F | Prep/Paint Miscellaneous Directional Markings (Such as Arrows) | 30 | EA | $ - 0 | |
| 3G | Remove Road/Parking Lot Striping | 7 | LF | $ - 0 | |
| 3H | Remove Road/Parking Lot Markings, including "Blackout" Areas | 30 | SF | $ - 0 | |
| 3I | Prep/"Blackout" Paint Over Existing Pavement Markings (Excludes Striping) | 61 | SF | $ - 0 | |
| 3J | Prep/"Blackout" Paint Over Existing Striping | 30 | LF | $ - 0 | |
| 3K | Prep/Paint Crosswalk (Solid: White Stripes with Black Fill) | 7 | SF | $ - 0 | |
| 3L | Prep/Paint Crosswalk (White Stripes Only, Measured in 4" Wide, LF Stripes) | 60 | LF | $ - 0 | |
| 3M | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 18” Wide | 600 | LF | $ - 0 | |
| 3N | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 24” Wide | 900 | LF | $ - 0 | |
| 3O | Prep/Paint Large Individual Alphabetical or Numerical Pavement Markings (Sized per SF) | 30 | SF | $ - 0 | |
| 3P | Prep/Paint Small Traffic/Parking Control Wording on Curbs or Pavement Edge (Per Word Group, Such as "No Parking" or "Fire Lane", Approximately 4"H x 36"L) | 30 | EA | $ - 0 | |
| 3Q | Prep/Paint Stop Bar | 45 | SF | $ - 0 | |
| 3R | Prep/Paint Curb | 750 | LF | $ - 0 | |
| 4. EPOXY FLOORING | |||||
| 4A | Concrete Floor/Slab: Patch Minor Spalls and Cracks With Epoxy Grout | 210 | SF | $ - 0 | |
| 4B | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove All Coats of Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4C | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove Glue, Adhesive & Tar Substances From Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4D | Concrete Floor/Slab Surface Preparation: Remove Pavement Lines and Markings | 300 | SF | $ - 0 | |
| 4E | Concrete Floor/Slab: Apply Epoxy Primer Coat | 975 | SF | $ - 0 | |
| 4F | Concrete Floor/Slab: Apply Epoxy Base Coat (One Coat) | 825 | SF | $ - 0 | |
| 4G | Concrete Floor/Slab: Apply Epoxy Base Coat (Two Coats) | 2,700 | SF | $ - 0 | |
| 4H | Concrete Floor/Slab: Apply Epoxy Striping, 4" Wide | 75 | LF | $ - 0 | |
| 4I | Concrete Floor/Slab: Apply Epoxy Striping, 6" Wide | 90 | LF | $ - 0 | |
| 4J | Concrete Floor/Slab: Apply Hatched Lines, Safety or Hazard Markings | 375 | SF | $ - 0 | |
| 4K | Concrete Floor/Slab: Apply Non-Skid Granules, Aluminum Oxide | 2,700 | SF | $ - 0 | |
| 4L | Concrete Floor/Slab: Apply Epoxy Top Seal Coat | 2,700 | SF | $ - 0 | |
| 5. MISCELLANEOUS SURFACES AND PREPARATION | |||||
| 5A | Apply Clear Sealer to CMU Block | 150 | SF | $ - 0 | |
| 5B | Install 4" Yellow Retroreflectorized Tape (Bands or Strips) | 25 | LF | $ - 0 | |
| 5C | Prep/Paint Handrails | 150 | LF | $ - 0 | |
| 5D | Prep/Paint Railings | 150 | LF | $ - 0 | |
| 5E | Prep/Paint Stairways (Includes Steps and Support Structure, not Walls or Handrails) | 60 | SF | $ - 0 | |
| 5F | Strip/Sandblast Miscellaneous Surfaces | 150 | SF | $ - 0 | |
| 5G | Water Pressure Cleaning | ||||
| 5,400 | SF | $ - 0 | |||
| 5H | Chemical Stripping | 150 | SF | $ - 0 | |
| Line Item Totals | $ - 0 | ||||
| NS | Estimated Portion of Work Associated with NON-Standard Work Hours (5%) | Estimated Portion of Work, Non-Standard hours (5%) | $0.00 | ||
| Coeffient | Contractor's Coefficient for Work associated with NON-Standard Work Hours | 1.10 | $0.00 | ||
| Adjusted Coefficient price for Non-Standard hrs | $0.00 | ||||
| Annual Total | 0.00 |
FY25 - Pricing
PRICE LIST
The contractor’s unit prices includes all applicable Overhead, Profit, and Taxes, including NMGRT.
| Item No. | Description | Estimated Annual Qty. | Unit | Unit Price | Estimated Extended Price |
| 1. INTERIOR SURFACES | |||||
| 1A | Prep/Paint Interior Walls and Ceilings | 56,250 | SF | $ - 0 | |
| 1B | Prep/Paint Interior Walls Over 10' Tall | 1,500 | SF | $ - 0 | |
| 1C | Prep/Paint Interior Walls and Ceilings (Brick Masonry, Concrete Masonry Units [CMU] Block) | 2,250 | SF | $ - 0 | |
| 1D | Prep/Paint Interior Walls Over 10' Tall (Brick Masonry, CMU Block) | 1,250 | SF | $ - 0 | |
| 1E | Prep/Paint Interior Doors and Frames | 45 | EA | $ - 0 | |
| 1F | Prep/Paint Interior of Roll-Up or Hangar Doors and Frames | 600 | SF | $ - 0 | |
| 1G | Prep/Paint Interior Windows and Frames | 235 | LF | $ - 0 | |
| 1H | Prep/Stain/Varnish Interior Doors and Frames | 2 | EA | $ - 0 | |
| 1I | Prep/Stain/Varnish Interior Windows and Frames | 1 | EA | $ - 0 | |
| 1J | Prep/Paint Interior Wood/Composite/Plastic Trim (Up to 12" Wide) | 52 | LF | $ - 0 | |
| 1K | Prep/Paint Interior Metal Trim (Up to 12" Wide) | 3,795 | LF | $ - 0 | |
| 1L | Prep/Paint Interior Metal Trim (Over 12" Wide) | 173 | LF | $ - 0 | |
| 1M | Tape, Bed, Texture Interior Walls | 1,523 | SF | $ - 0 | |
| 1N | Remove Wall Coverings | 18 | SF | $ - 0 | |
| 1O | Patch Wall Coverings | 10 | SF | $ - 0 | |
| 1P | Remove, Prep, Furnish and Install Acoustical Material | 7 | SF | $ - 0 | |
| 1Q | Remove Wall Paper | 1,500 | SF | $ - 0 | |
| 1R | Prep/Paint Interior Ceiling/Roofing Open Web Metal Joists | 75 | SF | $ - 0 | |
| 1S | Prep/Paint Interior Steel Beams, Vertical | 82 | SF | $ - 0 | |
| 1T | Prep/Paint Interior Steel Beams, Horizontal | 12 | SF | $ - 0 | |
| 1U | Prep/Paint Interior Concrete Floors (General) | 450 | SF | $ - 0 | |
| 1V | Prep/Paint Interior Piping and Conduits | 19 | LF | $ - 0 | |
| 2. EXTERIOR SURFACES | |||||
| 2A | Prep/Paint Exterior Facility Surfaces (Concrete, Stucco) | 19,500 | SF | $ - 0 | |
| 2B | Prep/Paint Exterior Facility Surfaces (Brick Masonry, CMU Block) | 1,200 | SF | $ - 0 | |
| 2C | Prep/Paint Exterior Facility Surfaces (Miscellaneous Wood) | 225 | SF | $ - 0 | |
| 2D | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (up to 12" Wide) | 1,500 | LF | $ - 0 | |
| 2E | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (over 12" Wide) | 180 | LF | $ - 0 | |
| 2F | Prep/Paint Exterior Surfaces (Steel) | 750 | SF | $ - 0 | |
| 2G | Prep/Paint Exterior Personnel Doors and Frames (Includes Caulking) | 3 | EA | $ - 0 | |
| 2H | Prep/Paint Exterior Roll-Up or Hangar Doors and Frames (Includes Caulking) | 975 | SF | $ - 0 | |
| 2I | Prep/Paint Exterior Windows and Frames (Includes Caulking) | 375 | LF | $ - 0 | |
| 2J | Prep/Paint Miscellaneous Cylindrical Equipment (Includes Fire Hydrants, Post Indicator Valves, Bollards, Round Enclosures) | 450 | SF | $ - 0 | |
| 2K | Prep/Paint Miscellaneous Metal Structures | 1,125 | SF | $ - 0 | |
| 2L | Prep/Paint Miscellaneous Metal Structures (Portions Over 10', Excludes Steel Tanks) | 375 | SF | $ - 0 | |
| 2M | Prep/Paint Steel Tanks, Up to 4,000 Gallon Capacity (Exterior Only) | 225 | SF | $ - 0 | |
| 2N | Prep/Paint Fuel Pipes (Not to Exceed 1" Diameter) | 30 | LF | $ - 0 | |
| 2O | Prep/Paint Exterior Piping and Conduits | 38 | LF | $ - 0 | |
| 3. PAVEMENT MARKINGS | |||||
| 3A | Prep/Paint 4" Wide Street Striping | 15,000 | LF | $ - 0 | |
| 3B | New Pavement Marking Layout | 750 | LF | $ - 0 | |
| 3C | Prep/Paint Parking Lot Striping | 18,000 | LF | $ - 0 | |
| 3D | Prep/Paint Traffic Control Word Marking (per Complete Word, Such as "Stop" or "Yield") | 15 | EA | $ - 0 | |
| 3E | Prep/Paint Standard Blue and White Handicap Symbol | 7 | EA | $ - 0 | |
| 3F | Prep/Paint Miscellaneous Directional Markings (Such as Arrows) | 30 | EA | $ - 0 | |
| 3G | Remove Road/Parking Lot Striping | 7 | LF | $ - 0 | |
| 3H | Remove Road/Parking Lot Markings, including "Blackout" Areas | 30 | SF | $ - 0 | |
| 3I | Prep/"Blackout" Paint Over Existing Pavement Markings (Excludes Striping) | 61 | SF | $ - 0 | |
| 3J | Prep/"Blackout" Paint Over Existing Striping | 30 | LF | $ - 0 | |
| 3K | Prep/Paint Crosswalk (Solid: White Stripes with Black Fill) | 7 | SF | $ - 0 | |
| 3L | Prep/Paint Crosswalk (White Stripes Only, Measured in 4" Wide, LF Stripes) | 60 | LF | $ - 0 | |
| 3M | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 18” Wide | 600 | LF | $ - 0 | |
| 3N | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 24” Wide | 900 | LF | $ - 0 | |
| 3O | Prep/Paint Large Individual Alphabetical or Numerical Pavement Markings (Sized per SF) | 30 | SF | $ - 0 | |
| 3P | Prep/Paint Small Traffic/Parking Control Wording on Curbs or Pavement Edge (Per Word Group, Such as "No Parking" or "Fire Lane", Approximately 4"H x 36"L) | 30 | EA | $ - 0 | |
| 3Q | Prep/Paint Stop Bar | 45 | SF | $ - 0 | |
| 3R | Prep/Paint Curb | 750 | LF | $ - 0 | |
| 4. EPOXY FLOORING | |||||
| 4A | Concrete Floor/Slab: Patch Minor Spalls and Cracks With Epoxy Grout | 210 | SF | $ - 0 | |
| 4B | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove All Coats of Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4C | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove Glue, Adhesive & Tar Substances From Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4D | Concrete Floor/Slab Surface Preparation: Remove Pavement Lines and Markings | 300 | SF | $ - 0 | |
| 4E | Concrete Floor/Slab: Apply Epoxy Primer Coat | 975 | SF | $ - 0 | |
| 4F | Concrete Floor/Slab: Apply Epoxy Base Coat (One Coat) | 825 | SF | $ - 0 | |
| 4G | Concrete Floor/Slab: Apply Epoxy Base Coat (Two Coats) | 2,700 | SF | $ - 0 | |
| 4H | Concrete Floor/Slab: Apply Epoxy Striping, 4" Wide | 75 | LF | $ - 0 | |
| 4I | Concrete Floor/Slab: Apply Epoxy Striping, 6" Wide | 90 | LF | $ - 0 | |
| 4J | Concrete Floor/Slab: Apply Hatched Lines, Safety or Hazard Markings | 375 | SF | $ - 0 | |
| 4K | Concrete Floor/Slab: Apply Non-Skid Granules, Aluminum Oxide | 2,700 | SF | $ - 0 | |
| 4L | Concrete Floor/Slab: Apply Epoxy Top Seal Coat | 2,700 | SF | $ - 0 | |
| 5. MISCELLANEOUS SURFACES AND PREPARATION | |||||
| 5A | Apply Clear Sealer to CMU Block | 150 | SF | $ - 0 | |
| 5B | Install 4" Yellow Retroreflectorized Tape (Bands or Strips) | 25 | LF | $ - 0 | |
| 5C | Prep/Paint Handrails | 150 | LF | $ - 0 | |
| 5D | Prep/Paint Railings | 150 | LF | $ - 0 | |
| 5E | Prep/Paint Stairways (Includes Steps and Support Structure, not Walls or Handrails) | 60 | SF | $ - 0 | |
| 5F | Strip/Sandblast Miscellaneous Surfaces | 150 | SF | $ - 0 | |
| 5G | Water Pressure Cleaning | ||||
| 5,400 | SF | $ - 0 | |||
| 5H | Chemical Stripping | 150 | SF | $ - 0 | |
| Line Item Totals | $ - 0 | ||||
| NS | Estimated Portion of Work Associated with NON-Standard Work Hours (5%) | Estimated Portion of Work, Non-Standard hours (5%) | $0.00 | ||
| Coeffient | Contractor's Coefficient for Work associated with NON-Standard Work Hours | 1.10 | $0.00 | ||
| Adjusted Coefficient price for Non-Standard hrs | $0.00 | ||||
| Annual Total | 0.00 |
FY26 - Pricing
PRICE LIST
The contractor’s unit prices includes all applicable Overhead, Profit, and Taxes, including NMGRT.
| Item No. | Description | Estimated Annual Qty. | Unit | Unit Price | Estimated Extended Price |
| 1. INTERIOR SURFACES | |||||
| 1A | Prep/Paint Interior Walls and Ceilings | 56,250 | SF | $ - 0 | |
| 1B | Prep/Paint Interior Walls Over 10' Tall | 1,500 | SF | $ - 0 | |
| 1C | Prep/Paint Interior Walls and Ceilings (Brick Masonry, Concrete Masonry Units [CMU] Block) | 2,250 | SF | $ - 0 | |
| 1D | Prep/Paint Interior Walls Over 10' Tall (Brick Masonry, CMU Block) | 1,250 | SF | $ - 0 | |
| 1E | Prep/Paint Interior Doors and Frames | 45 | EA | $ - 0 | |
| 1F | Prep/Paint Interior of Roll-Up or Hangar Doors and Frames | 600 | SF | $ - 0 | |
| 1G | Prep/Paint Interior Windows and Frames | 235 | LF | $ - 0 | |
| 1H | Prep/Stain/Varnish Interior Doors and Frames | 2 | EA | $ - 0 | |
| 1I | Prep/Stain/Varnish Interior Windows and Frames | 1 | EA | $ - 0 | |
| 1J | Prep/Paint Interior Wood/Composite/Plastic Trim (Up to 12" Wide) | 52 | LF | $ - 0 | |
| 1K | Prep/Paint Interior Metal Trim (Up to 12" Wide) | 3,795 | LF | $ - 0 | |
| 1L | Prep/Paint Interior Metal Trim (Over 12" Wide) | 173 | LF | $ - 0 | |
| 1M | Tape, Bed, Texture Interior Walls | 1,523 | SF | $ - 0 | |
| 1N | Remove Wall Coverings | 18 | SF | $ - 0 | |
| 1O | Patch Wall Coverings | 10 | SF | $ - 0 | |
| 1P | Remove, Prep, Furnish and Install Acoustical Material | 7 | SF | $ - 0 | |
| 1Q | Remove Wall Paper | 1,500 | SF | $ - 0 | |
| 1R | Prep/Paint Interior Ceiling/Roofing Open Web Metal Joists | 75 | SF | $ - 0 | |
| 1S | Prep/Paint Interior Steel Beams, Vertical | 82 | SF | $ - 0 | |
| 1T | Prep/Paint Interior Steel Beams, Horizontal | 12 | SF | $ - 0 | |
| 1U | Prep/Paint Interior Concrete Floors (General) | 450 | SF | $ - 0 | |
| 1V | Prep/Paint Interior Piping and Conduits | 199 | LF | $ - 0 | |
| 2. EXTERIOR SURFACES | |||||
| 2A | Prep/Paint Exterior Facility Surfaces (Concrete, Stucco) | 19,500 | SF | $ - 0 | |
| 2B | Prep/Paint Exterior Facility Surfaces (Brick Masonry, CMU Block) | 1,200 | SF | $ - 0 | |
| 2C | Prep/Paint Exterior Facility Surfaces (Miscellaneous Wood) | 225 | SF | $ - 0 | |
| 2D | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (up to 12" Wide) | 1,500 | LF | $ - 0 | |
| 2E | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (over 12" Wide) | 180 | LF | $ - 0 | |
| 2F | Prep/Paint Exterior Surfaces (Steel) | 750 | SF | $ - 0 | |
| 2G | Prep/Paint Exterior Personnel Doors and Frames (Includes Caulking) | 3 | EA | $ - 0 | |
| 2H | Prep/Paint Exterior Roll-Up or Hangar Doors and Frames (Includes Caulking) | 975 | SF | $ - 0 | |
| 2I | Prep/Paint Exterior Windows and Frames (Includes Caulking) | 375 | LF | $ - 0 | |
| 2J | Prep/Paint Miscellaneous Cylindrical Equipment (Includes Fire Hydrants, Post Indicator Valves, Bollards, Round Enclosures) | 450 | SF | $ - 0 | |
| 2K | Prep/Paint Miscellaneous Metal Structures | 1,125 | SF | $ - 0 | |
| 2L | Prep/Paint Miscellaneous Metal Structures (Portions Over 10', Excludes Steel Tanks) | 375 | SF | $ - 0 | |
| 2M | Prep/Paint Steel Tanks, Up to 4,000 Gallon Capacity (Exterior Only) | 225 | SF | $ - 0 | |
| 2N | Prep/Paint Fuel Pipes (Not to Exceed 1" Diameter) | 30 | LF | $ - 0 | |
| 2O | Prep/Paint Exterior Piping and Conduits | 38 | LF | $ - 0 | |
| 3. PAVEMENT MARKINGS | |||||
| 3A | Prep/Paint 4" Wide Street Striping | 15,000 | LF | $ - 0 | |
| 3B | New Pavement Marking Layout | 750 | LF | $ - 0 | |
| 3C | Prep/Paint Parking Lot Striping | 18,000 | LF | $ - 0 | |
| 3D | Prep/Paint Traffic Control Word Marking (per Complete Word, Such as "Stop" or "Yield") | 15 | EA | $ - 0 | |
| 3E | Prep/Paint Standard Blue and White Handicap Symbol | 7 | EA | $ - 0 | |
| 3F | Prep/Paint Miscellaneous Directional Markings (Such as Arrows) | 30 | EA | $ - 0 | |
| 3G | Remove Road/Parking Lot Striping | 7 | LF | $ - 0 | |
| 3H | Remove Road/Parking Lot Markings, including "Blackout" Areas | 30 | SF | $ - 0 | |
| 3I | Prep/"Blackout" Paint Over Existing Pavement Markings (Excludes Striping) | 61 | SF | $ - 0 | |
| 3J | Prep/"Blackout" Paint Over Existing Striping | 30 | LF | $ - 0 | |
| 3K | Prep/Paint Crosswalk (Solid: White Stripes with Black Fill) | 7 | SF | $ - 0 | |
| 3L | Prep/Paint Crosswalk (White Stripes Only, Measured in 4" Wide, LF Stripes) | 60 | LF | $ - 0 | |
| 3M | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 18” Wide | 600 | LF | $ - 0 | |
| 3N | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 24” Wide | 900 | LF | $ - 0 | |
| 3O | Prep/Paint Large Individual Alphabetical or Numerical Pavement Markings (Sized per SF) | 30 | SF | $ - 0 | |
| 3P | Prep/Paint Small Traffic/Parking Control Wording on Curbs or Pavement Edge (Per Word Group, Such as "No Parking" or "Fire Lane", Approximately 4"H x 36"L) | 30 | EA | $ - 0 | |
| 3Q | Prep/Paint Stop Bar | 45 | SF | $ - 0 | |
| 3R | Prep/Paint Curb | 750 | LF | $ - 0 | |
| 4. EPOXY FLOORING | |||||
| 4A | Concrete Floor/Slab: Patch Minor Spalls and Cracks With Epoxy Grout | 210 | SF | $ - 0 | |
| 4B | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove All Coats of Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4C | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove Glue, Adhesive & Tar Substances From Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4D | Concrete Floor/Slab Surface Preparation: Remove Pavement Lines and Markings | 300 | SF | $ - 0 | |
| 4E | Concrete Floor/Slab: Apply Epoxy Primer Coat | 975 | SF | $ - 0 | |
| 4F | Concrete Floor/Slab: Apply Epoxy Base Coat (One Coat) | 825 | SF | $ - 0 | |
| 4G | Concrete Floor/Slab: Apply Epoxy Base Coat (Two Coats) | 2,700 | SF | $ - 0 | |
| 4H | Concrete Floor/Slab: Apply Epoxy Striping, 4" Wide | 75 | LF | $ - 0 | |
| 4I | Concrete Floor/Slab: Apply Epoxy Striping, 6" Wide | 90 | LF | $ - 0 | |
| 4J | Concrete Floor/Slab: Apply Hatched Lines, Safety or Hazard Markings | 375 | SF | $ - 0 | |
| 4K | Concrete Floor/Slab: Apply Non-Skid Granules, Aluminum Oxide | 2,700 | SF | $ - 0 | |
| 4L | Concrete Floor/Slab: Apply Epoxy Top Seal Coat | 2,700 | SF | $ - 0 | |
| 5. MISCELLANEOUS SURFACES AND PREPARATION | |||||
| 5A | Apply Clear Sealer to CMU Block | 150 | SF | $ - 0 | |
| 5B | Install 4" Yellow Retroreflectorized Tape (Bands or Strips) | 25 | LF | $ - 0 | |
| 5C | Prep/Paint Handrails | 150 | LF | $ - 0 | |
| 5D | Prep/Paint Railings | 150 | LF | $ - 0 | |
| 5E | Prep/Paint Stairways (Includes Steps and Support Structure, not Walls or Handrails) | 60 | SF | $ - 0 | |
| 5F | Strip/Sandblast Miscellaneous Surfaces | 150 | SF | $ - 0 | |
| 5G | Water Pressure Cleaning | ||||
| 5,400 | SF | $ - 0 | |||
| 5H | Chemical Stripping | 150 | SF | $ - 0 | |
| Line Item Totals | $ - 0 | ||||
| NS | Estimated Portion of Work Associated with NON-Standard Work Hours (5%) | Estimated Portion of Work, Non-Standard hours (5%) | $0.00 | ||
| Coeffient | Contractor's Coefficient for Work associated with NON-Standard Work Hours | 1.10 | $0.00 | ||
| Adjusted Coefficient price for Non-Standard hrs | $0.00 | ||||
| Annual Total | 0.00 |
FY27 - Pricing
PRICE LIST
The contractor’s unit prices includes all applicable Overhead, Profit, and Taxes, including NMGRT.
| Item No. | Description | Estimated Annual Qty. | Unit | Unit Price | Estimated Extended Price |
| 1. INTERIOR SURFACES | |||||
| 1A | Prep/Paint Interior Walls and Ceilings | 56,250 | SF | $ - 0 | |
| 1B | Prep/Paint Interior Walls Over 10' Tall | 1,500 | SF | $ - 0 | |
| 1C | Prep/Paint Interior Walls and Ceilings (Brick Masonry, Concrete Masonry Units [CMU] Block) | 2,250 | SF | $ - 0 | |
| 1D | Prep/Paint Interior Walls Over 10' Tall (Brick Masonry, CMU Block) | 1,250 | SF | $ - 0 | |
| 1E | Prep/Paint Interior Doors and Frames | 45 | EA | $ - 0 | |
| 1F | Prep/Paint Interior of Roll-Up or Hangar Doors and Frames | 600 | SF | $ - 0 | |
| 1G | Prep/Paint Interior Windows and Frames | 235 | LF | $ - 0 | |
| 1H | Prep/Stain/Varnish Interior Doors and Frames | 2 | EA | $ - 0 | |
| 1I | Prep/Stain/Varnish Interior Windows and Frames | 1 | EA | $ - 0 | |
| 1J | Prep/Paint Interior Wood/Composite/Plastic Trim (Up to 12" Wide) | 52 | LF | $ - 0 | |
| 1K | Prep/Paint Interior Metal Trim (Up to 12" Wide) | 3,795 | LF | $ - 0 | |
| 1L | Prep/Paint Interior Metal Trim (Over 12" Wide) | 173 | LF | $ - 0 | |
| 1M | Tape, Bed, Texture Interior Walls | 1,523 | SF | $ - 0 | |
| 1N | Remove Wall Coverings | 18 | SF | $ - 0 | |
| 1O | Patch Wall Coverings | 10 | SF | $ - 0 | |
| 1P | Remove, Prep, Furnish and Install Acoustical Material | 7 | SF | $ - 0 | |
| 1Q | Remove Wall Paper | 1,500 | SF | $ - 0 | |
| 1R | Prep/Paint Interior Ceiling/Roofing Open Web Metal Joists | 75 | SF | $ - 0 | |
| 1S | Prep/Paint Interior Steel Beams, Vertical | 82 | SF | $ - 0 | |
| 1T | Prep/Paint Interior Steel Beams, Horizontal | 12 | SF | $ - 0 | |
| 1U | Prep/Paint Interior Concrete Floors (General) | 450 | SF | $ - 0 | |
| 1V | Prep/Paint Interior Piping and Conduits | 375 | LF | $ - 0 | |
| 2. EXTERIOR SURFACES | |||||
| 2A | Prep/Paint Exterior Facility Surfaces (Concrete, Stucco) | 19,500 | SF | $ - 0 | |
| 2B | Prep/Paint Exterior Facility Surfaces (Brick Masonry, CMU Block) | 1,200 | SF | $ - 0 | |
| 2C | Prep/Paint Exterior Facility Surfaces (Miscellaneous Wood) | 225 | SF | $ - 0 | |
| 2D | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (up to 12" Wide) | 1,500 | LF | $ - 0 | |
| 2E | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (over 12" Wide) | 180 | LF | $ - 0 | |
| 2F | Prep/Paint Exterior Surfaces (Steel) | 750 | SF | $ - 0 | |
| 2G | Prep/Paint Exterior Personnel Doors and Frames (Includes Caulking) | 3 | EA | $ - 0 | |
| 2H | Prep/Paint Exterior Roll-Up or Hangar Doors and Frames (Includes Caulking) | 975 | SF | $ - 0 | |
| 2I | Prep/Paint Exterior Windows and Frames (Includes Caulking) | 375 | LF | $ - 0 | |
| 2J | Prep/Paint Miscellaneous Cylindrical Equipment (Includes Fire Hydrants, Post Indicator Valves, Bollards, Round Enclosures) | 450 | SF | $ - 0 | |
| 2K | Prep/Paint Miscellaneous Metal Structures | 1,125 | SF | $ - 0 | |
| 2L | Prep/Paint Miscellaneous Metal Structures (Portions Over 10', Excludes Steel Tanks) | 375 | SF | $ - 0 | |
| 2M | Prep/Paint Steel Tanks, Up to 4,000 Gallon Capacity (Exterior Only) | 225 | SF | $ - 0 | |
| 2N | Prep/Paint Fuel Pipes (Not to Exceed 1" Diameter) | 30 | LF | $ - 0 | |
| 2O | Prep/Paint Exterior Piping and Conduits | 38 | LF | $ - 0 | |
| 3. PAVEMENT MARKINGS | |||||
| 3A | Prep/Paint 4" Wide Street Striping | 15,000 | LF | $ - 0 | |
| 3B | New Pavement Marking Layout | 750 | LF | $ - 0 | |
| 3C | Prep/Paint Parking Lot Striping | 18,000 | LF | $ - 0 | |
| 3D | Prep/Paint Traffic Control Word Marking (per Complete Word, Such as "Stop" or "Yield") | 15 | EA | $ - 0 | |
| 3E | Prep/Paint Standard Blue and White Handicap Symbol | 7 | EA | $ - 0 | |
| 3F | Prep/Paint Miscellaneous Directional Markings (Such as Arrows) | 30 | EA | $ - 0 | |
| 3G | Remove Road/Parking Lot Striping | 7 | LF | $ - 0 | |
| 3H | Remove Road/Parking Lot Markings, including "Blackout" Areas | 30 | SF | $ - 0 | |
| 3I | Prep/"Blackout" Paint Over Existing Pavement Markings (Excludes Striping) | 61 | SF | $ - 0 | |
| 3J | Prep/"Blackout" Paint Over Existing Striping | 30 | LF | $ - 0 | |
| 3K | Prep/Paint Crosswalk (Solid: White Stripes with Black Fill) | 7 | SF | $ - 0 | |
| 3L | Prep/Paint Crosswalk (White Stripes Only, Measured in 4" Wide, LF Stripes) | 60 | LF | $ - 0 | |
| 3M | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 18” Wide | 600 | LF | $ - 0 | |
| 3N | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 24” Wide | 900 | LF | $ - 0 | |
| 3O | Prep/Paint Large Individual Alphabetical or Numerical Pavement Markings (Sized per SF) | 30 | SF | $ - 0 | |
| 3P | Prep/Paint Small Traffic/Parking Control Wording on Curbs or Pavement Edge (Per Word Group, Such as "No Parking" or "Fire Lane", Approximately 4"H x 36"L) | 30 | EA | $ - 0 | |
| 3Q | Prep/Paint Stop Bar | 45 | SF | $ - 0 | |
| 3R | Prep/Paint Curb | 750 | LF | $ 1.59 | $ 1,193.86 |
| 4. EPOXY FLOORING | |||||
| 4A | Concrete Floor/Slab: Patch Minor Spalls and Cracks With Epoxy Grout | 210 | SF | $ - 0 | |
| 4B | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove All Coats of Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4C | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove Glue, Adhesive & Tar Substances From Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4D | Concrete Floor/Slab Surface Preparation: Remove Pavement Lines and Markings | 300 | SF | $ - 0 | |
| 4E | Concrete Floor/Slab: Apply Epoxy Primer Coat | 975 | SF | $ - 0 | |
| 4F | Concrete Floor/Slab: Apply Epoxy Base Coat (One Coat) | 825 | SF | $ - 0 | |
| 4G | Concrete Floor/Slab: Apply Epoxy Base Coat (Two Coats) | 2,700 | SF | $ - 0 | |
| 4H | Concrete Floor/Slab: Apply Epoxy Striping, 4" Wide | 75 | LF | $ - 0 | |
| 4I | Concrete Floor/Slab: Apply Epoxy Striping, 6" Wide | 90 | LF | $ - 0 | |
| 4J | Concrete Floor/Slab: Apply Hatched Lines, Safety or Hazard Markings | 375 | SF | $ - 0 | |
| 4K | Concrete Floor/Slab: Apply Non-Skid Granules, Aluminum Oxide | 2,700 | SF | $ - 0 | |
| 4L | Concrete Floor/Slab: Apply Epoxy Top Seal Coat | 2,700 | SF | $ - 0 | |
| 5. MISCELLANEOUS SURFACES AND PREPARATION | |||||
| 5A | Apply Clear Sealer to CMU Block | 150 | SF | $ - 0 | |
| 5B | Install 4" Yellow Retroreflectorized Tape (Bands or Strips) | 25 | LF | $ - 0 | |
| 5C | Prep/Paint Handrails | 150 | LF | $ - 0 | |
| 5D | Prep/Paint Railings | 150 | LF | $ - 0 | |
| 5E | Prep/Paint Stairways (Includes Steps and Support Structure, not Walls or Handrails) | 60 | SF | $ - 0 | |
| 5F | Strip/Sandblast Miscellaneous Surfaces | 150 | SF | $ - 0 | |
| 5G | Water Pressure Cleaning | ||||
| 5,400 | SF | $ - 0 | |||
| 5H | Chemical Stripping | 150 | SF | $ - 0 | |
| Line Item Totals | $ 1,193.86 | ||||
| NS | Estimated Portion of Work Associated with NON-Standard Work Hours (5%) | Estimated Portion of Work, Non-Standard hours (5%) | $59.69 | ||
| Coeffient | Contractor's Coefficient for Work associated with NON-Standard Work Hours | 1.10 | $65.66 | ||
| Adjusted Coefficient price for Non-Standard hrs | $5.97 | ||||
| Annual Total | 1,199.83 |
FY28 - Pricing
PRICE LIST
The contractor’s unit prices includes all applicable Overhead, Profit, and Taxes, including NMGRT.
| Item No. | Description | Estimated Annual Qty. | Unit | Unit Price | Estimated Extended Price |
| 1. INTERIOR SURFACES | |||||
| 1A | Prep/Paint Interior Walls and Ceilings | 56,250 | SF | $ - 0 | |
| 1B | Prep/Paint Interior Walls Over 10' Tall | 1,500 | SF | $ - 0 | |
| 1C | Prep/Paint Interior Walls and Ceilings (Brick Masonry, Concrete Masonry Units [CMU] Block) | 2,250 | SF | $ - 0 | |
| 1D | Prep/Paint Interior Walls Over 10' Tall (Brick Masonry, CMU Block) | 1,250 | SF | $ - 0 | |
| 1E | Prep/Paint Interior Doors and Frames | 45 | EA | $ - 0 | |
| 1F | Prep/Paint Interior of Roll-Up or Hangar Doors and Frames | 600 | SF | $ - 0 | |
| 1G | Prep/Paint Interior Windows and Frames | 235 | LF | $ - 0 | |
| 1H | Prep/Stain/Varnish Interior Doors and Frames | 2 | EA | $ - 0 | |
| 1I | Prep/Stain/Varnish Interior Windows and Frames | 1 | EA | $ - 0 | |
| 1J | Prep/Paint Interior Wood/Composite/Plastic Trim (Up to 12" Wide) | 52 | LF | $ - 0 | |
| 1K | Prep/Paint Interior Metal Trim (Up to 12" Wide) | 3,795 | LF | $ - 0 | |
| 1L | Prep/Paint Interior Metal Trim (Over 12" Wide) | 173 | LF | $ - 0 | |
| 1M | Tape, Bed, Texture Interior Walls | 1,523 | SF | $ - 0 | |
| 1N | Remove Wall Coverings | 18 | SF | $ - 0 | |
| 1O | Patch Wall Coverings | 10 | SF | $ - 0 | |
| 1P | Remove, Prep, Furnish and Install Acoustical Material | 7 | SF | $ - 0 | |
| 1Q | Remove Wall Paper | 1,500 | SF | $ - 0 | |
| 1R | Prep/Paint Interior Ceiling/Roofing Open Web Metal Joists | 75 | SF | $ - 0 | |
| 1S | Prep/Paint Interior Steel Beams, Vertical | 82 | SF | $ - 0 | |
| 1T | Prep/Paint Interior Steel Beams, Horizontal | 12 | SF | $ - 0 | |
| 1U | Prep/Paint Interior Concrete Floors (General) | 450 | SF | $ - 0 | |
| 1V | Prep/Paint Interior Piping and Conduits | 207 | LF | $ - 0 | |
| 2. EXTERIOR SURFACES | |||||
| 2A | Prep/Paint Exterior Facility Surfaces (Concrete, Stucco) | 19,500 | SF | $ - 0 | |
| 2B | Prep/Paint Exterior Facility Surfaces (Brick Masonry, CMU Block) | 1,200 | SF | $ - 0 | |
| 2C | Prep/Paint Exterior Facility Surfaces (Miscellaneous Wood) | 225 | SF | $ - 0 | |
| 2D | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (up to 12" Wide) | 1,500 | LF | $ - 0 | |
| 2E | Prep/Paint Exterior Facility Trim, including Fascia and Soffit (over 12" Wide) | 180 | LF | $ - 0 | |
| 2F | Prep/Paint Exterior Surfaces (Steel) | 750 | SF | $ - 0 | |
| 2G | Prep/Paint Exterior Personnel Doors and Frames (Includes Caulking) | 3 | EA | $ - 0 | |
| 2H | Prep/Paint Exterior Roll-Up or Hangar Doors and Frames (Includes Caulking) | 975 | SF | $ - 0 | |
| 2I | Prep/Paint Exterior Windows and Frames (Includes Caulking) | 375 | LF | $ - 0 | |
| 2J | Prep/Paint Miscellaneous Cylindrical Equipment (Includes Fire Hydrants, Post Indicator Valves, Bollards, Round Enclosures) | 450 | SF | $ - 0 | |
| 2K | Prep/Paint Miscellaneous Metal Structures | 1,125 | SF | $ - 0 | |
| 2L | Prep/Paint Miscellaneous Metal Structures (Portions Over 10', Excludes Steel Tanks) | 375 | SF | $ - 0 | |
| 2M | Prep/Paint Steel Tanks, Up to 4,000 Gallon Capacity (Exterior Only) | 225 | SF | $ - 0 | |
| 2N | Prep/Paint Fuel Pipes (Not to Exceed 1" Diameter) | 30 | LF | $ - 0 | |
| 2O | Prep/Paint Exterior Piping and Conduits | 38 | LF | $ - 0 | |
| 3. PAVEMENT MARKINGS | |||||
| 3A | Prep/Paint 4" Wide Street Striping | 15,000 | LF | $ - 0 | |
| 3B | New Pavement Marking Layout | 750 | LF | $ - 0 | |
| 3C | Prep/Paint Parking Lot Striping | 18,000 | LF | $ - 0 | |
| 3D | Prep/Paint Traffic Control Word Marking (per Complete Word, Such as "Stop" or "Yield") | 15 | EA | $ - 0 | |
| 3E | Prep/Paint Standard Blue and White Handicap Symbol | 7 | EA | $ - 0 | |
| 3F | Prep/Paint Miscellaneous Directional Markings (Such as Arrows) | 30 | EA | $ - 0 | |
| 3G | Remove Road/Parking Lot Striping | 7 | LF | $ - 0 | |
| 3H | Remove Road/Parking Lot Markings, including "Blackout" Areas | 30 | SF | $ - 0 | |
| 3I | Prep/"Blackout" Paint Over Existing Pavement Markings (Excludes Striping) | 61 | SF | $ - 0 | |
| 3J | Prep/"Blackout" Paint Over Existing Striping | 30 | LF | $ - 0 | |
| 3K | Prep/Paint Crosswalk (Solid: White Stripes with Black Fill) | 7 | SF | $ - 0 | |
| 3L | Prep/Paint Crosswalk (White Stripes Only, Measured in 4" Wide, LF Stripes) | 60 | LF | $ - 0 | |
| 3M | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 18” Wide | 600 | LF | $ - 0 | |
| 3N | Prep/Install Adhesive Strip for Crosswalk or Stop Bar, 24” Wide | 900 | LF | $ - 0 | |
| 3O | Prep/Paint Large Individual Alphabetical or Numerical Pavement Markings (Sized per SF) | 30 | SF | $ - 0 | |
| 3P | Prep/Paint Small Traffic/Parking Control Wording on Curbs or Pavement Edge (Per Word Group, Such as "No Parking" or "Fire Lane", Approximately 4"H x 36"L) | 30 | EA | $ - 0 | |
| 3Q | Prep/Paint Stop Bar | 45 | SF | $ - 0 | |
| 3R | Prep/Paint Curb | 750 | LF | $ - 0 | |
| 4. EPOXY FLOORING | |||||
| 4A | Concrete Floor/Slab: Patch Minor Spalls and Cracks With Epoxy Grout | 210 | SF | $ - 0 | |
| 4B | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove All Coats of Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4C | Concrete Floor/Slab Surface Preparation: Such as Sanding, Grinding, Honing to Remove Glue, Adhesive & Tar Substances From Existing Coated Surface | 2 | MSF | $ - 0 | |
| 4D | Concrete Floor/Slab Surface Preparation: Remove Pavement Lines and Markings | 300 | SF | $ - 0 | |
| 4E | Concrete Floor/Slab: Apply Epoxy Primer Coat | 975 | SF | $ - 0 | |
| 4F | Concrete Floor/Slab: Apply Epoxy Base Coat (One Coat) | 825 | SF | $ - 0 | |
| 4G | Concrete Floor/Slab: Apply Epoxy Base Coat (Two Coats) | 2,700 | SF | $ - 0 | |
| 4H | Concrete Floor/Slab: Apply Epoxy Striping, 4" Wide | 75 | LF | $ - 0 | |
| 4I | Concrete Floor/Slab: Apply Epoxy Striping, 6" Wide | 90 | LF | $ - 0 | |
| 4J | Concrete Floor/Slab: Apply Hatched Lines, Safety or Hazard Markings | 375 | SF | $ - 0 | |
| 4K | Concrete Floor/Slab: Apply Non-Skid Granules, Aluminum Oxide | 2,700 | SF | $ - 0 | |
| 4L | Concrete Floor/Slab: Apply Epoxy Top Seal Coat | 2,700 | SF | $ - 0 | |
| 5. MISCELLANEOUS SURFACES AND PREPARATION | |||||
| 5A | Apply Clear Sealer to CMU Block | 150 | SF | $ - 0 | |
| 5B | Install 4" Yellow Retroreflectorized Tape (Bands or Strips) | 25 | LF | $ - 0 | |
| 5C | Prep/Paint Handrails | 150 | LF | $ - 0 | |
| 5D | Prep/Paint Railings | 150 | LF | $ - 0 | |
| 5E | Prep/Paint Stairways (Includes Steps and Support Structure, not Walls or Handrails) | 60 | SF | $ - 0 | |
| 5F | Strip/Sandblast Miscellaneous Surfaces | 150 | SF | $ - 0 | |
| 5G | Water Pressure Cleaning | ||||
| 5,400 | SF | $ - 0 | |||
| 5H | Chemical Stripping | 150 | SF | $ - 0 | |
| Line Item Totals | $ - 0 | ||||
| NS | Estimated Portion of Work Associated with NON-Standard Work Hours (5%) | Estimated Portion of Work, Non-Standard hours (5%) | $0.00 | ||
| Coeffient | Contractor's Coefficient for Work associated with NON-Standard Work Hours | 1.10 | $0.00 | ||
| Adjusted Coefficient price for Non-Standard hrs | $0.00 | ||||
| Annual Total | 0.00 |