Text version

Project Description Bid FOR MOB, COMPACTED EMBANKMENT, COMMON EXCAVATION, AND 18-inch HDPE BROKEBACK PIPE INSTALLATION

Repair Washed out livestock water dam. Dam across the area that is washed out and install an 18-inch HDPE Brokeback Pipe.

Install 6 Concrete Thrust Blocks on the pipe, 4000 PSI 6 sack concrete with fiber and #4 rebar for reinforcement.

Item Unit Quantity Unit Price Cost Amount

1 LS 1.00

2 CY 950.00

3 CY 800.00

4 Installation of One 18-inch diameter Double Walled Corrugated bell and spigot ends HDPE Pipes, and Bends LF 70.00

5 Install 6 Concrete Thrust Blocks, 4000psi 6 sack with fiber, #4 rebar reinforcement CY 1.00

Total Bid

File location

Z:\1HDD_Common\Engineering\Projects\8100 Range Projects\RFO\Leo and Measel Spring Res MaintenanceFY20\[Bid Schedule A Leo ReservoirAS8.4.20.xlsx]summary

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Bid Schedule A Leo Reservoir

Contract/Project Name

Project Location

Description

Mobilization/Demobilization, Bonds/Insurance

Compacted Embankment

Common Excavation

Leo Reservoir Reclamation Project

T25NR83WSec19NWNW