SECTION 01019
GOVERNMENT‑FURNISHED PROPERTY
Measel Spring and Leo Reservoir Repair GOVERNMENT-FURNISHED PROPERTY
01019 - 2
PART 1: GENERAL
1.01 SUMMARY:
A. Section Includes: Materials to be furnished by the Government and their locations listed on the Work Data Sheets.
1.02 DELIVERY, STORAGE, AND HANDLING:
A. Location: The Government‑furnished property will be provided by the Bureau of Land Management Rawlins Field Office in Rawlins Wyoming.
B. Time: Property will be available Monday through Thursday, 6:00am to 4:00pm except on holidays.
C. Return of Unused Property: Return unused material to the Rawlins Field Office.
D. Loading, Offloading and Transporting Property: The Contractor shall be responsible for providing the necessary material‑handling equipment to offload materials at the job site. The Contractor shall transport materials to work sites. The government will load only materials stored in the ware yard at the Rawlins Field Office. It will be the contractor’s responsibility to load any Government furnished materials that are not stored at the Rawlins Field Office.
PART 2: PRODUCTS
2.01 MATERIALS
Materials to be furnished by the Government are listed below:
Measel Spring Reservoir:
200ft – 24-inch diameter double walled corrugated HDPE (bell and spigot ends) (10ea. 20ft joints of pipe) Two 22.5-degree bends for 24-inch diameter Double Walled Corrugated HDPE Pipe (bell ends)
Leo Reservoir:
80ft. – 18-inch diameter double walled corrugated HDPE (bell and spigot ends) (4ea. 20ft joints of pipe) Two 22.5-degree bends for 18-inch diameter Double Walled Corrugated HDPE Pipe (bell ends)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT:
Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.
END OF SECTION 01019
Other files
| File | Type | Posted |
|---|---|---|
| Sheet 5 - Measel Dam Dwg 2.pdf | ||
| Sheet 3 - Leo Location Map.pdf | ||
| 06_02294 Minor Earth Dams and Pits MVO 8.26.20.doc | DOC document | |
| 05_02271 RipRap.docx | DOCX document | |
| 07_Workdata Sheet Leo Reservoir MVO 8.26.20.doc | DOC document | |
| Sheet 4 - Measel Dam Dwg 1.pdf | ||
| Sheet 1 - Location Maps.pdf | ||
| Bid Schedule B Measel Spring Reservoir MO 8.26.20.pdf | ||
| 02_01009 General Information and Requirements.doc | DOC document | |
| Bid Schedule A Leo Reservoir MO 8.26.20.pdf | ||
| 07_Workdata Sheet Measel Spring MVO 8.26.20.doc | DOC document | |
| 04_01505 Mobilization.doc | DOC document | |
| Sol_140L6220Q0081.pdf | ||
| Sheet 2 - Measel Location Map.pdf | ||
| Sheet 6 - Leo Dam Dwg.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .