SECTION 01505

MOBILIZATION

PART 1:

GENERAL

1.01

SUMMARY:

A.

Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include costs associated with the moves between the different reservoir sites in this contract.

PART 2:

PRODUCTS

(There are no applicable requirements.)

PART 3:

EXECUTION

(There are no applicable requirements.)

PART 4:

MEASUREMENT AND PAYMENT

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: Work described in this section will be measured by the lump sum.

4.2 BASIS OF PAYMENT:

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item

Pay Unit 01505(01) Mobilzation

Lump Sum

END OF SECTION 01505