Bid Results.ARTS intersection improvements.pdf

PDF 8 KB Posted

Attached to
Construction of Marion County Intersection Improvements
Solicitation number
S-C25102-00000241
Issued by
Marion County, Oregon

About this file

The document provided is a Bid Results report for the ARTS Intersection Improvements project, Contract #2021-203, undertaken by Marion County Public Works. The project involves the construction of intersection warning signs, transverse rumble strips at stop-controlled intersections, installation of yellow flashing beacon systems, and illumination at the intersections of Silverton Road at Brush Creek Road and Ehlen Road at Butteville Road, within the jurisdictions of Marion County and the City of Salem, Oregon.

The bid results show that Northstar Electrical Contractors submitted the lowest bid of $516,120.00 for the project. The report includes a detailed breakdown of the various bid items and their corresponding unit prices and quantities. The bid opening date is noted as 08-18-2021, but no other details regarding the bidding process or award date are provided.

View the file

Other files

File Type Posted
Notice of Intent to Award.pdf PDF
MC ARTS Fillable Bid Schedule.xls XLS spreadsheet
Compost RFO 2021.pdf PDF
ARTS Intersection Improvements SPEC_Final_2021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTHSTAR

ELECTRICAL

CONTRACTORS

BROWN

CONTRACTING INC

QUANTITY TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE

08-18-2021 Page 1

2021-203CONTRACT #:

Marion County Public Works Contract Bid Detail Report - E

1PROJECT #:

ARTS INTERSECTION IMPROVEMENTS

1PROJECT #: 0

1.00 55000.000 55000.00 .00.00.0083000.000 83000.00MOBILIZATION210.100

1.00 18000.000 18000.00 .00.00.0024500.000 24500.00TEMPORARY PROTECTION AND

DIRECTION OF TRAFFIC

225.050

162.00 19.000 3078.00 .00.00.0012.000 1944.00TEMPORARY SIGNS 225.070

640.00 1.000 640.00 .00.00.0060.000 38400.00FLAGGERS225.490

10.00 500.000 5000.00 .00.00.00640.000 6400.00TRAFFIC CONTROL SUPERVISOR225.493

1.00 2000.000 2000.00 .00.00.002200.000 2200.00EROSION CONTROL280.100

250.00 8.000 2000.00 .00.00.002.000 500.00SEDIMENT BARRIER, TYPE 3280.322

250.00 3.000 750.00 .00.00.001.000 250.00PLASTIC SHEETING280.480

1.00 6000.000 6000.00 .00.00.008500.000 8500.00TUNNELING, BORING, AND

JACKING

406.100

240.00 29.000 6960.00 .00.00.0024.000 5760.00TRANSVERSE RUMBLE STRIPE

PAVEMENT BAR, TYPE B-HS

865.600

60.00 48.000 2880.00 .00.00.0012.000 720.00PAVEMENT BAR, TYPE B-HS867.302

1.00 4000.000 4000.00 .00.00.001850.000 1850.00REMOVE EXISTING SIGNS905.100

640.00 44.000 28160.00 .00.00.006.000 3840.00WOOD SIGN POSTS910.100

364.00 43.000 15652.00 .00.00.0020.000 7280.00SIGNS, STANDARD SHEETING,

SHEET ALUMINUM

940.620

1.00 30000.000 30000.00 .00.00.0013000.000 13000.00POLE FOUNDATIONS970.200

1.00 110000.000 110000.00 .00.00.0064000.000 64000.00CONDUIT AND JUNCTION BOX

SYSTEM

970.400

2.00 113000.000 226000.00 .00.00.00127000.000 254000.00THROUGH ROUTE ADVANCED

WARNING SYSTEM INSTALLATION

990.580

516,120.00 516,144.00 0.00 0.00 0.00PROJECT SUBTOTAL:

516,120.00 516,144.00 0.00 0.00 0.00CUMULATIVE TOTAL:

516,120.00 516,144.00 .00 .00 .00CONTRACT TOTAL:

CONTRACT #: 2021-203 PROJECT #: 1 ARTS INTERSECTION IMPROVEMENTS

File details come from the government source that posted it. Updated .