This is a Bid Questions document for a solicitation to replace windows in Buildings 4, 8, and 9 at a Department of Veterans Affairs Veterans Health Administration facility in Veterans Integrated Service Network 23. The solicitation number is 36C26326B0035-0001, with bid opening scheduled for August 17, 2026 at 10:00 am. Bids should be delivered to Dwayne Brauch at dwayne.brauch@va.gov, with a virtual bid opening conducted via Microsoft Teams.

The solicitation includes several supporting documents and resources for bidders: an answered questions request form (Attachment F), a site visit agenda and sign sheet to allow contractors to inspect the buildings, an updated Wage Rate Determination for Stearns County, and VHA ICRA-1.4 requirements dated April 14, 2026. Prospective bidders are directed to contact the government point of contact for submission instructions and additional information needed to prepare competitive offers for this window replacement project.

View the file

Other files for this federal contract opportunity

Other files attached to 656-12-222 Replace Windows Bldg 4, 8 & 9, newest first.
File Type Posted
VHA ICRA-1.4 April 14 2026 B4.8.9.pdf PDF
Wage Determination Stearns County MN202600099 7.30.2026.pdf PDF
36C26326B0035 0001.pdf PDF
S04 Pre bid sign in sheet_07292026.pdf PDF
S04 Site Visit Meeting Document 656-12-222 Replace Windows Bldg 4 8 9 STC.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Questions and Answers 656-12-222 Replace Windows Bldg 4, 8 & 9 - STC

#
SOW Reference
Question
Answer A/E- GOV- CO

There is no mention of them in the 0800 Spec, however we noted during the walk thru as well as in the provided pictures on the plans that storm windows or in existence. The Scope of work also mentions storm windows, but that is all we can find.

Per the drawings and specifications, the installation of Storm windows will not be a part of this project.

Please clarify if new storm windows are to be provided, which units receive them as well as any specification information for such.

Stom window will not be installed under this project.

Per Windows Supplier Representative, the specified windows “Clad Magnum Tilt Pac by Marvin” has been discontinued since Aug 30, 2021. Is the government open to similar product “Marvin Ultimate Collection” windows? Can the government provide updated specifications to align with Marvin Ulitmate Collection window?

The specification lists the “Basis of Desing”. The VA will accept other window brands or series provided they meet the minimum salient characteristics listed in the specifications.

Are other brands besides Marvin, acceptable?

See question #3

Are there any storm windows in the SOW (To be installed over new windows) to be provided and installed as per following? Additionally, the contractor will be responsible for the complete and satisfactory installation of the new window frames and sashes, screens and storm windows.

See question #1

Can the government provide storm windows specifications and locations if applicable?

See question #1

Is the GC required to have both, QC Manager and Superintendent/SSHO or just one person?

The contractor may dual hat between these requirements.

Are the windows being anchored into existing wood framing or masonry?

Details on sheet AS10 show the existing windows installed in existing CMU

Is there interior trim that needs to be re-installed?

The expectation is that any trim needing to be removed during the demolition stage will be salvaged, refurbished and reinstalled. If trim is not reusable it shall be replaced with like and kind to match existing.

Are temporary wall systems required?

The contractor shall provide a means of protecting patients and staff from construction efforts with a dust proof barrier. Additionally, the barrier is to be equivalent to 1 hr fire rating. Contractor may propose alternate methods to be approved by COR.

Are there any temporary ceiling systems required over the temporary walls?

Sheet AS11 details temporary construction partitions and requirements for installation

Are the temporary wall system doors to have a door lock? What type?

Door locks and latches shall have a BEST 7 pin core to accept VA provided lock cores.

How many windows on average will the single temporary wall system enclose?

Temporary walls may cover more than one window in areas containing multiple windows. However this will be dependent on availability of work space and patient or staff relocation or adjusted work area needs and approval by the COR.

Another question for you on the 0800 Specs again.

The Basis of Design of Marvin Magnum Tilt Paks has been discontinued (see attached).

Could you provide any direction as to what product you would like used in lieu of the current BOD?

See Question #3

15
Site Visit
Can the sign schedule be provided as soon as possible so General Contractors can begin coordinating with window manufacturers and suppliers for pricing and lead times?

yes

16
General Requirements
Can the Superintendent be dual-hatted to also serve as the Site Safety and Health Officer (SSHO) and Quality Control Manager (QCM), provided the individual meets all qualification requirements for each position?
Yes,
17
Painting Specification

09-91-00 Painting Limits: The specifications require patching and painting of wall surfaces disturbed by the window replacement work; however, they do not define the required limits of repainting. Please clarify whether the Contractor is required to:

o Paint only the patched/repaired areas;

o Feather or blend the paint into the adjacent wall surface;

o Paint to the nearest corner or natural break in the wall; or o Paint the entire room or wall where windows are replaced.

Please define the acceptable limits of repainting for bidding purposes.

Painting shall extend to the nearest corner or natural break in the wall.

Existing Ceramic Tile: Existing ceramic tile surrounds are present at some window locations. Due to the facility's age, replacement tile matching the existing size, color, texture, and finish may no longer be commercially available. Please clarify the Government's expectations regarding the handling of existing tile that is damaged during the required demolition and window replacement work. Specifically:

o Is the Contractor expected to replace only the damaged tile with the closest commercially available match?

o If matching tile is unavailable, will the Government accept a similar replacement approved by the COR?

o If no acceptable match exists, will replacement of the entire tiled wall or room be considered additional work by modification?

Has the Government identified a salvage stock of matching tiles to be made available for this project?

The contractor shall take all necessary precautions to ensure the existing wall tile is not damaged during demolition. If removing tile at jamb locations is necessary, the existing tile installed at the jamb locations shall be removed in its entirety (jamb only). A replacement tile being a solid white glazed 4x4 tile shall be installed as a replacement, bevel edge as necessary. Contractor to submit product samples for approval by COR.

19
Painting Specification

09-91-00 Basement Windowsills and Existing Peeling Paint: Existing basement window openings, particularly at Building 9, have cast-in-place concrete sills and surrounding painted surfaces with peeling, flaking, and deteriorated paint unrelated to the window replacement work. Please clarify the Government's expectations for surface preparation and painting at these locations. Specifically:

o Is the Contractor only responsible for repairing and repainting surfaces damaged as a result of the window removal and replacement work?

o If existing peeling or deteriorated paint is encountered adjacent to the window opening, is the Contractor required to scrape, prepare, prime, and repaint those existing deteriorated areas as part of the base contract?

o If so, please define the required limits of painting (i.e., patched areas only, the entire window opening including the sill and jamb returns, or to the nearest natural break or corner).

If additional existing deteriorated paint is exposed during construction beyond the limits of the Contractor's work, will that be addressed by contract modification?

Contractor is to scrape and paint all window sills and lintels.

Window Sills are to be Benjamin Moore Moorlife Flat Exterior Acrylic House Paint (N105) Tinted to VA Thorosheen Grey Ext.

Metal Lintels are to be Benjamin Moore – DTM – color tinted to match windows – Dark Bronze.

20
General Requirements
Infection Control Requirements: Please identify the required Infection Control Risk Assessment (ICRA) Class and Risk Group for each phase and work area associated with the window replacement project. If different buildings or departments require different ICRA classifications, please identify the required containment measures, barrier types, negative air requirements, and cleaning protocols applicable to each area.
See attachment VHA ICRA-1.4 (April 14 2026) B4.8.9
Marvin no longer makes the Magnum tilt pack that is specified. They have a full frame insert window, or I am trying to find other manufacturers that may still do sash packs.
See Question #3

There is no mention of them in the 0800 Spec, however we noted during the walk thru as well as in the provided pictures on the plans that storm windows or in existence. The Scope of work also mentions storm windows, but that is all we can find.

See Question #1

As Per Keynote 3&4, is masonry infill and glass block infill part of the sow.
Note 3&4 on Page AS4 identify existing conditions where no window is present.
Is there any work required with existing window AC units.
All AC units are to be removed and reinstalled by the contractor. Areas where an AC unit is present the contractor shall remove the window AC and reinstall using like material and installation method. AC units are to be turned over to the VA until contractor is ready to reinstall.
Is there any work required with the Mechnical vent at Window as per key note 3 bldg. 8.
The window is shown as W6. All normal work should be completed along with reinstalling the existing Vent to match existing installation methods.
Please confirm that the solicitation does not require separate, dedicated Site Safety and Health Officer (SSHO) and Quality Control Manager (QCM) personnel, and that the Superintendent may perform these safety and quality control responsibilities in addition to their supervisory duties.
See question #7 and #16
Please confirm which party — the VA or the contractor — is responsible for furnishing and funding the independent third-party industrial hygiene (VPIH/CIH) air monitoring and clearance testing, and clarify the scope of the contractor's separate CPIH/CIH monitoring obligations.
The contractor is to provide independent 3rd party monitoring.

Will you accept a substitution to include Graham Architectural Products for the aluminum windows?

These are thermally broken extruded aluminum windows with high performing thermal and structural ratings. The window contractors pursuing your project prefer Graham Windows, https://www.grahamwindows.com/product/gt2200-double-hung/ see email attached The specification lists the “Basis of Desing”. The VA will accept other window brands or series provided they meet the minimum salient characteristics listed in the specifications.