Bid Plans.pdf
PDF 5 MB Posted
- Solicitation number
- S202300A, S202300P
- Issued by
- Alameda County, Long Beach City, California
About this file
These bid plans detail the City of Livermore's 2023 Storm Damage Repair Project covering three locations (Loops 5, 13, and 14), which involve storm damage repair and restoration work. The project encompasses sediment removal, debris removal, bank stabilization, vegetation management, and access road repair at three distinct sites within Livermore: Airway Culvert, Arroyo Mocho Trail near Creek Road, and Arroyo Mocho Trail near Anza Way. The project is associated with FEMA Disaster Number 4683-DR-CA and has two specific city project numbers: S202300A for debris removal (Category A) and S202300P for permanent repair (Category G). The work is scheduled to be completed by October 31, 2024, with work below the top of bank required to be finished by October 15, 2024.
The project will be funded through FEMA and requires careful environmental management, including implementation of Best Management Practices (BMPs), stream maintenance program compliance, and strict adherence to environmental protection measures. The total sediment removal and placement volumes vary by site, with the Airway Culvert site involving approximately 860 cubic yards of sediment excavation and placement, the Arroyo Mocho Trail near Creek Road site involving 160 cubic yards of sediment removal, and the Arroyo Mocho Trail near Anza Way site involving 200 cubic yards of material relocation. The project emphasizes environmental sensitivity, requiring contractor attendance at environmental training, implementation of conservation measures, and coordination with the city's biologist throughout the construction process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
STAGING/STOCKPILE AREA
EXISTING FENCE
XX
EXISTING TREES TO REMAIN
TRAIL CLOSURE BARRIER
1. CONTRACTOR SHALL PROVIDE ALL BARRIERS AND SIGNS, TO BE APPROVED BY THE CITY, TO
CLOSE OFF PUBLIC ACCESS TO EACH SITE DURING CONSTRUCTION. THE EXACT LOCATION
OF SITE CLOSURE SHALL BE COORDINATED WITH THE CITY PRIOR TO BEGINNING
CONSTRUCTION.
2. IF THE CONTRACTOR PLANS TO CLOSE TRAFFIC LANES FOR ANY PERIOD OF TIME, OR
DISRUPT THE FLOW OF TRAFFIC, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL
PLAN TO THE CITY ENGINEER FOR APPROVAL PRIOR TO BEGINNING WORK. THE PLAN SHALL
BE SIGNED BY A LICENSED CIVIL OR TRAFFIC ENGINEER WHEN IT INVOLVES AN ARTERIAL
STREET. CONTRACTOR SHALL PROVIDE ALL NECESSARY TRAFFIC CONTROL IN ACCORDANCE
WITH THE LATEST EDITION OF THE "CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES". A MINIMUM OF OF ONE TRAFFIC LANE (10' MIN) SHALL BE OPEN TO VEHICULAR
TRAFFIC DURING ALL HOURS, WEEKENDS, AND HOLIDAYS. STREET DETOURS SHALL ONLY
TAKE PLACE UPON CITY APPROVAL.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH PART 6 AND PART 9 OF THE LATEST EDITION OF THE "CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES".
4. ALL CONES USED FOR LANE CLOSURE AFTER NIGHTFALL SHALL BE FITTED WITH
RETROREFLECTIVE BANDS (OR SLEEVES).
5. ALL ADVANCED WARNING SIGN INSTALLATIONS SHALL BE EQUIPPED WITH FLAGS FOR
DAYTIME CLOSURES. FLASHING BEACONS SHALL BE PLACED AT THE LOCATIONS INDICATED
FOR NIGHTTIME CLOSURES.
6. PERMANENT SIGNS OR EXISTING PAVEMENT MARKINGS THAT CONFLICT WITH THE TRAFFIC
CONTROL PLAN SHALL BE COVERED, OBLITERATED OR REMOVED AS DIRECTED BY THE
ENGINEER, AND RESTORED TO THEIR ORIGINAL CONDITION UPON COMPLETION OF THE
WORK.
7. DURING ALL CONSTRUCTION PERIODS, THE CONTRACTOR SHALL HAVE AT THE JOBSITE ALL
NECESSARY TRAFFIC CONTROL DEVICES (APPROPRIATE SIGN, LIGHTED ARROW DISPLAY,
CHANNELIZING DEVICES, ETC.) NEEDED TO IMPLEMENT THE APPROVED TRAFFIC CONTROL
PLAN
8. CONSTRUCTION SHALL BE SEQUENCED TO PROVIDE THE LEAST POSSIBLE ADVERSE EFFECT
TO RESIDENCES AND BUSINESS.
9. CONSTRUCTION MATERIALS SHALL BE KEPT OFF SIDEWALKS AND CONSOLIDATED IN AREAS
WITHIN THE CITY RIGHT-OF-WAY UNLESS OTHERWISE APPROVED BY THE CITY.
10.CONTRACTOR SHALL COORDINATE DETOUR ROUTES (IF NECESSARY) WITH THE CITY.
SHEET NO. WHERE DETAIL OR SECTION IS DRAWN
A
PROPERTY LINE
EXISTING GRADE
GEOTEXTILE FABRIC
AND SIGN
PROPOSED FENCEXX
EXISTING CONTOUR545 PROPOSED GRADE
LEGEND
EXISTING STORM DRAIN
NEW ROCK RIP RAP
T-2
AND LEGEND
1. NO CHANGE TO THE PROJECT IMPROVEMENT PLANS SHALL BE PERMITTED WITHOUT PRIOR APPROVAL BY THE CITY. CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT TO THE EXTENT ARISING FROM THE NEGLIGENCE OF
THE CITY OR ENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG MEN, CONES OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN ACCORDANCE WITH THE
SPECIFICATIONS. SEE ALSO TRAFFIC CONTROL NOTES.
3. CONTRACTOR SHALL REPLACE, AT HIS EXPENSE, ALL TREES, SHRUBS, LAWNS, FENCES, IRRIGATION SYSTEMS AND IMPROVEMENTS WHICH ARE TO REMAIN INTACT BUT HAVE BEEN REMOVED OR DAMAGED DURING CONSTRUCTION. CONTRACTOR SHALL NOT REMOVE OR DAMAGE IMPROVEMENTS LOCATED WITHIN CITY PROPERTY WITHOUT WRITTEN PERMISSION FROM THE CITY; OR FROM PRIVATE PROPERTY WITHOUT WRITTEN PERMISSION FROM THE PROPERTY OWNER.
4. TREES, SHRUBS, AND ROOTS OUTSIDE OF THE DEFINED EXCAVATION LIMITS SHALL NOT BE TRIMMED OR PRUNED WITHOUT THE APPROVAL OF THE CITY.
5. CLEARING AND GRUBBING SHALL BE PERFORMED WITHIN THE ENTIRE GRADING LIMITS AREA SHOWN ON THE PLANS. THE SITE SHALL BE STRIPPED AND CLEARED OF ALL VEGETATION, DEBRIS, AND ORGANIC-LADEN TOP SOIL. THE STRIPPED MATERIAL FROM LOP 14 SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. VEGETATION AND DEBRIS FROM LOP 5 AND LOP 13 SHALL BE REMOVED FROM THE SITES AND DISPOSED OF BY THE CONTRACTOR'S EXPENSE. TOP SOIL FROM LOP 5 AND LOP 13 SHALL BE PLACED AND GRADED AT THE STOCKPILE LOCATIONS IDENTIFIED ON THE PLANS.
6. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLITION DEBRIS AND EXCESS EXCAVATED MATERIAL TO A SUITABLE SITE. ALL TESTING REQUIRED FOR LEGAL DISPOSAL SHALL BE CONDUCTED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS RESPONSIBLE TO DISPOSE OF ALL MATERIALS IN A PROPER AND LEGAL MANNER. IF THE MATERIAL IS TESTED AND FOUND TO BE HAZARDOUS, THE CONTRACTOR'S PRICE AND CONTRACT TIME SHALL BE ADJUSTED. MATERIAL TESTING PREVIOUSLY COMPLETED BY THE CITY IS PROVIDED AS AN APPENDIX TO THE SPECIFICATIONS. REFERENCE SPECIFICATION SECTION 31 30 00 -EARTHWORK.
7. ALL PERMANENT IMPROVEMENTS REMOVED OR DAMAGED BY THE CONTRACTOR, THAT ARE NOT SPECIFICALLY SHOWN TO BE REMOVED, SHALL BE RESTORED TO THEIR ORIGINAL LOCATION AND CONDITION BY THE CONTRACTOR USING NEW MATERIALS AS DIRECTED BY THE ENGINEER
8. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT AND VEHICLES IS PERMITTED WITHIN STAGING AREAS INDICATED ON PLAN SHEETS. ALL EQUIPMENT SHALL BE SURROUNDED BY REFLECTIVE DELINEATORS AT ALL TIMES. SEDIMENT MAY BE TEMPORARILY STAGED NEAR THE CREEK OF CHANNEL MAINTENANCE SITE A MINIMUM DISTANCE OF 100-FEET FROM THE CREEK OR CHANNEL TO ALLOW AN APPROPRIATE DRYING TIME PRIOR TO TRANSPORT. STOCKPILING OF MATERIALS IS NOT PERMITTED AT STAGING LOCATIONS UNLESS IT IS CONTAINED WITH EROSION CONTROL BMPs. PARKING EQUIPMENT AND STORING MATERIALS IN OTHER LOCATIONS, INCLUDING WITHIN THE STREET RIGHT-OF-WAY SHALL NOT BE
PERMITTED, EXCEPT AT LOCATION(S) APPROVED BY THE CITY TRAFFIC ENGINEER.
9. THE USE OF TRACKED EQUIPMENT ON TRAILS AND ROADWAYS IS AT THE DISCRETION OF THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR AND REPLACE ANY DAMAGE TO TRAILS AND ROADWAYS AT COMPLETION OF CONSTRUCTION. ANY SETTLEMENT, CRACKING, OR DAMAGE TO EXISTING TRAILS (DIRT, AC, CONCRETE, ETC.) DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR. AC TRAIL REPAIR SHALL BE PERFORMED BY REPLACING THE FULL WIDTH OF THE AC TRAIL FOR THE LENGTH OF THE DAMAGED TRAIL SECTION.
TRAILS SHALL BE REPLACED AS DETAILED ON THE PLANS.
10.MUD AND CONSTRUCTION DEBRIS ON STREETS, SIDEWALKS OR BICYCLE PATHS SHALL BE CLEANED OFF IMMEDIATELY.
11. ALL WORK BELOW THE TOP OF BANK SHOWN ON PLANS SHALL BE COMPLETED BEFORE OCTOBER 15, 2024. ALL OTHER WORK SHALL BE COMPLETED BY OCTOBER 31, 2024.
12.CONTRACTOR SHALL PERFORM HIS CONSTRUCTION AND OPERATION IN A MANNER WHICH WILL NOT ALLOW HARMFUL POLLUTANTS TO ENTER THE CREEK. TO ENSURE COMPLIANCE, THE CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE BEST MANAGEMENT PRACTICE (BMP) AS OUTLINED IN THE "CALIFORNIA STORMWATER BMP HANDBOOK" FOR CONSTRUCTION (www.cabmphandbooks.com) AND THE CITY OF LIVERMORE'S "STREAM MAINTENANCE PROGRAM MANUAL (SMP)". INCLUDING, BUT NOT LIMITED TO:
a. CREEK FLOW SHALL BE DIVERTED AROUND OR THROUGH EXCAVATION
ACTIVITIES PER SECTION NS-5, CLEAR WATER DIVERSION
b. STOCKPILED MATERIALS SHALL BE PROTECTED PER SECTION
WM-3, STOCKPILE MANAGEMENT
c. HANDLING OF ALL SHRUBS, TREES, AND MATERIALS TO BE
DISPOSED OF SHALL FOLLOW SECTION WM-5 SOLID WASTE
MANAGEMENT
d. STREAMBANK STABILIZATION AND SEDIMENT CONTROL SHALL
FOLLOW SECTION EC-12, STREAMBANK STABILIZATION
13. ALL BMP MATERIALS SHALL ADHERE TO THE REQUIREMENTS AND SPECIFICATIONS WITHIN THE CALIFORNIA STORMWATER BMP HANDBOOK.
14.UTILITIES HAVE NOT BEEN LOCATED AND ARE NOT SHOWN ON PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES WITH THE APPROPRIATE UTILITY AGENCIES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY OWNERS 48 HOURS PRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY. CONTACT UNDERGROUND SERVICE ALERT (USA) AT 1-800-227-2600.
15. THE LIVERMORE STREAM MAINTENANCE PROGRAM (SMP) MANUAL WILL BE PROVIDED TO THE CONTRACTOR. ADDITIONAL REGULATORY PERMITS WILL BE PROVIDED TO THE CONTRACTOR PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS WITHIN THE SMP MANUAL AND REGULATORY PERMITS IN ADDITION TO THE
REQUIREMENTS HEREIN.
16.CONSTRUCTION SHALL BE SEQUENCED TO PROVIDE THE LEAST POSSIBLE EFFECT ON NATURAL RESOURCES.
NOTES, ABBREVIATIONS,
A
LEGEND
FLOW IN THE ARROYO LAS POSITAS WILL REQUIRE DEWATERING. WORK WITHIN THE ARROYO
MOCHO (LOP 14) MAY REQUIRE DEWATERING DEPENDING ON GROUNDWATER RECHARGE
RELSEASES INTO THE CHANNEL, REFERENCE SPECIFICATION SECTION 31 11 00. DEWATERING OF
THE CHANNEL SHALL BE IMPLEMENTED IN ACCORDANCE WITH CALIFORNIA STORM WATER
QUALITY ASSOCIATION (CASQA) NS-5: CLEAR WATER DIVERSION AND SMP BMP BR-4, IMPACT
AVOIDANCE AND MINIMIZATION DURING DEWATERING. CONTRACTOR SHALL SUBMIT A CLEAR
WATER DIVERSION/BYPASS PLAN TO CITY ENGINEER FOR REVIEW AND APPROVAL PRIOR TO
STARTING WORK. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO ESTIMATE THE
FLOW DIVERSION AND BYPASS REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR
MONITORING THE WEATHER, AND PROTECTING THE SITE FROM CHANNEL FLOWS AND
EROSION.
CLEAR WATER DIVERSION/CHANNEL BYPASS NOTES
TRAFFIC CONTROL NOTES
ALL COORDINATES PROVIDED ARE STATE PLANE COORDINATES BASED ON THE CALIFORNIA SYSTEM OF 1983, ZONE 3, EPOCH DATE 1 1998.50
THE CALCULATED BEARING OF NORTH 78°02'22" WEST TAKEN BETWEEN GPS CONTROL POINT "COLINAS A-445" AND GPS CONTROL POINT "GPS 95" AS SHOWN ON THAT CERTAIN RECORD OF SURVEY NO. 1827, FILED FOR RECORD ON APRIL 25, 2003, IN BOOK 28 OF RECORDS OF SURVEY AT PAGES 1 THROUGH 4, OFFICIAL RECORDS OF THE COUNTY OF ALAMEDA WAS TAKEN
AS THE BASIS OF BEARING FOR THIS SURVEY
BASIS OF COORDINATES (ANZA WAY - LOP 13)
BENCHMARK (ANZA WAY - LOP 13)
NATIONAL GEODETIC SURVEY DISK DESIGNATED "F 1259" BEING A 3" BRASS DISK ON TOP OF THE SOUTHWEST, 2' DIAMETER OLD CONCRETE FOOTING FOR A STEEL PG&E TRANSMISSION TOWER, 40' +/- SOUTH OF THE SOUTH EDGE OF PAVEMENT OF SOUTH FRONT ROAD 35' +/- NORTH OF A NEW TRANSMISSION LINE TOWER. THE DISK IS STAMPED "VERTICAL CONTROL MARK
F 1259 1974 THE DIRECTOR NATIONAL GEODETIC SURVEY"
ELEVATION 527.76 FEET, NAVD 1988 DATUM
REGRADE AREA & REMOVE SEDIMENT
EXISTING ROCK RIP RAP
REMOVE EXISTING TREE
EXISTING WATER MAINW
EXISTING SANITARY SEWERSS
COFFERDAM
ACCESS ROUTE
ABBREVIATIONS
(E) EXISTING
(N) NEW
AB AGGREGATE BASE
AC ASPHALTIC CONCRETE
APPROX APPROXIMATE
BMP BEST MANAGEMENT PRACTICES
CAMUTCD
CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES
CASQA
CALIFORNIA STORM WATER QUALITY
ASSOCIATION
CFS CUBIC FEET PER SECOND
CLSM
CONTROLLED-LOW-STRENGTH
MATERIAL
COMP COMPACTION
CY CUBIC YARD
EG EXISTING GRADE
ELEV ELEVATION
ESA ENVIRONMENTALLY SENSITIVE AREA
FEMA
FEDERAL EMERGENCY MANAGEMENT
AGENCY
GALV GALVANIZED
GPS GLOBAL POSITIONING SYSTEM
H, HOR. HORIZONTAL
INV INVERT
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
NTS NOT TO SCALE
OC ON CENTER
OHWM ORDINARY HIGH WATER MARK
PVC POLYVINYL CHLORIDE
SMP STREAM MAINTENANCE PERMIT
STA STATION
TYP TYPICAL
USA UNDERGROUND SERVICE ALERT
V, VER. VERTICAL
TOP OF BANK
TOE OF CHANNEL
CONSTRUCTION FENCE
BASIS OF BEARINGS (AIRWAY BOULEVARD - LOP 5)
NATIONAL GEODETIC SURVEY PERMANENT IDENTIFIER HS5109 DESIGNATED "GOLD CREEK"
ELEVATION 564.85 FEET, NAVD 1988 DATUM
ALL COORDINATES PROVIDED ARE STATE PLANE COORDINATES BASED ON THE CALIFORNIA
SYSTEM OF 1983, ZONE 3, EPOCH DATE 1 2010.00
THE BEARING OF NORTH 87°49'24" EAST TAKEN BETWEEN NGS PID HS5109 (GOLD CREEK)
AND NGS PID AA3816 (GREENVILLE) AS CALCULATED BETWEEN COORDINATED PUBLISHED
ON THE DATA SHEETS FOR SAID POINTS ON THE NGS WEBSITE WAS TAKEN AS THE BASIS
FOR ALL AIRWAY BOULEVARD BEARINGS.
BENCHMARK (AIRWAY BOULEVARD - LOP 5)
CONTROL POINT
LIMB (E) TREES AND WILLOWS
GENERAL NOTES
DETAIL OR SECTION DESIGNATION
ORDINARY HIGH WATER MARK
EXISTING ONSITE STOCKPILED MATERIAL
HOR. SCALE: 1" = 20'SECTION A VER. SCALE: 1" = 1'
C 4A
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
PROJECT LOCATION MAP
SCALE: 1" = 800'
PLAN
SHEET C4 - LOP 13 ARROYO
MOCHO TRAIL NEAR ANZA WAY
H O
LM
E
S S
T
SHEET C2 - LOP 14 ARROYO
MOCHO TRAIL NEAR CREEK ROAD
SHEET C6 - LOP 5 AIRWAY CULVERT
F
LO
R E
N C
E R
D
A R
R O
Y O
R D
E STANLEY BLVD
IS
A
B E
L A
V E
N U
E
EL CAMINITO
FIRST ST
COLLEGE AVE
MOCHO ST
IS
A
B E
L A
V E
N U
E
M U
R R
IE
T
A B
LV
D
PORTOLA AVENUE
AIRWAY BLVD
US580
E JACK LONDON BLVD
C1
SCALE: 1 INCH = 800 FEET
W
W W W W W W
W
W
S S
SSSSSSSSSSSSSS
S S
S S
S D
SD
SD
SD
SD
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
TO
C
R
EE
K R
O
AD
(N) STAGING AND
MATERIAL LAYDOWN AREA
(E) ACCESS PATH
(N) 12 TON RIP RAP
(E) 12 TON RIP RAP
(E) ALUMINUM HANDRAIL
PROTECT (E) TREE THROUGHOUT
CONSTRUCTION
CREEK ROAD
ARROYO BIKE TRAIL
PROTECT (E) TREE THROUGHOUT
CONSTRUCTION
55'-0"±
ARRO
YO
M O
CHO
(N) CONSTRUCTION FENCE
SEE NOTE 5 AND DETAIL
D1
(N) TRAIL CLOSED
BARRIER AND SIGN
SEE NOTE 11
INSTALL PEDESTRIAN
DETOUR ROUTE,
SEE NOTE 19
INSTALL PEDESTRIAN
DETOUR ROUTE,
SEE NOTE 19
(N) TRAIL CLOSED
BARRIER AND SIGN
SEE NOTE 11
C
A
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 14 - ARROYO MOCHO TRAIL NEAR
CREEK ROAD - SITE PLAN
NOTES:
1. ALL WORK BELOW TOP OF BANK SHALL BE COMPLETED PRIOR TO OCTOBER 15, 2024.
2. ACCESS SITE VIA COLLEGE AVENUE AND THE ARROYO BIKE TRAIL.
3. STAGING AREA AND ACCESS PATH SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION AT COMPLETION OF CONSTRUCTION.
4. HYDROSEEDING SHALL BE INSTALLED ON THE STAGING AREA, THE ACCESS PATH,
AND DISTURBED SLOPES AT THE COMPLETION OF CONSTRUCTION; AVOID
PLACEMENT IN LOW FLOW CHANNEL. COORDINATE WITH THE CITY TO DEFINE LIMITS
OF HYDROSEEDING PRIOR TO PLACEMENT.
5. CONSTRUCTION FENCE SHALL BE INSTALLED PRIOR TO PLACEMENT OF ANY
EQUIPMENT OR MATERIALS ON SITE. WORKSITE SHALL BE COMPLETELY ENCLOSED
BY SUCH FENCING. THE LOCATION AND LENGTH OF FENCING IS APPROXIMATE AND
SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S
REPRESENTATIVES IN THE FIELD DURING CONSTRUCTION.
6. SUBGRADE SHOULD BE COMPACTED FIRMLY TO PREVENT SLUMPING OR
UNDERCUTTING PRIOR TO INSTALLATION OF GEOTEXTILE LINING.
7. CONTRACTOR SHALL EXCAVATE, OFF-HAUL, AND DISPOSE OF ALL SEDIMENT, DEBRIS
AND VEGETATION AS DETAILED ON THE PLANS AND SPECIFICATIONS.
8. CONTRACTOR SHALL ATTEND STREAM MAINTENANCE PROGRAM (SMP)
ENVIRONMENTAL TRAINING PRIOR TO BEGINNING WORK.
9. CONTRACTOR SHALL IMPLEMENT ALL SMP BMPs AND CONSERVATION MEASURE IN
COMPLIANCE WITH RESOURCE REGULATORY PERMITS.
10. THE EXTENT, ELEVATIONS, AND QUANTITIES OF GRADING, SEDIMENT REMOVAL, AND
RIP RAP PLACEMENT IS APPROXIMATE AND SHALL BE CONFIRMED AND ADJUSTED AS
DIRECTED BY THE CITY'S REPRESENTATIVES IN THE FIELD DURING CONSTRUCTION.
11. CONTRACTOR SHALL PROVIDE 6-FOOT CHAIN LINK FENCE, OR SIMILAR BARRIER
APPROVED BY THE CITY, AT SITE ENTRANCES ALONG TRAIL PATH TO CLOSE OFF
PUBLIC SITE ACCESS AND POST "TRAIL CLOSED FOR REPAIRS" SIGNS. VERIFY EXACT
LOCATION OF BARRIER AND SIGN WITH CITY PRIOR TO CONSTRUCTION. NO WORK
SHALL COMMENCE PRIOR TO THE COMPLETION OF THE QUALIFIED BIOLOGIST
SURVEY TO BE COMPLETED BY THE CITY.
12. CONTRACTOR SHALL BYPASS ALL CHANNEL FLOWS. WORK WITHIN THE ARROYO
MOCHO MAY REQUIRE DEWATERING GROUNDWATER RECHARGE RELEASES INTO
THE ARROYO MOCHO WILL BE TEMPORARILY STOPPED TO ELIMINATE THE NEED FOR
CHANNEL BYPASS/DIVERSION. REFERENCE SPECIFICATION SECTION 31 11 00.
13. CONTRACTOR SHALL ADEQUATELY CONTROL AND BYPASS ANY AND ALL FLOWS
THAT OCCUR DURING CONSTRUCTION AS SHOWN HEREIN AND DETAILED IN THE
SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR MONITORING CHANNEL FLOW
RATES, MONITORING THE WEATHER, AND PROTECTING THE SITE FROM CHANNEL
FLOWS AND EROSION.
14. MATERIAL REMOVED FROM THE DRAINAGE CHANNEL SHALL BE STOCKPILED AND
DRAINED PRIOR TO BEING OFF-HAULED. TEMPORARY STOCKPILED MATERIAL SHALL
BE STAGED A MINIMUM OF 100-FEET FROM THE CHANNEL.
15. CONTRACTOR SHALL REMOVE AND DISPOSE OF TRASH, SOIL, SILT, MUD, EXCESSIVE
ORGANIC MATERIAL AND DEBRIS.
16. AREA TO BE PROTECTED BY RIP RAP SHOULD BE CLEARED OF VEGETATION, BRUSH,
AND UNSUITABLE SOILS.
17. CARE SHOULD BE TAKEN NOT TO TEAR OR PUNCTURE GEOTEXTILE. GEOTEXTILE
DAMAGED DURING INSTALLATION MUST BE REMOVED AND REPLACED BEFORE RIP
RAP PLACEMENT.
18. THE CITY'S BIOLOGIST SHALL BE ON-SITE DURING ALL CONSTRUCTION ACTIVITIES.
THE CITY'S BIOLOGIST IS THE AUTHORITY TO STOP WORK AT ANY TIME DURING
CONSTRUCTION.
19. CONTRACTOR SHALL IMPLEMENT A DETOUR ROUTE FOR THE PEDESTRIAN TRAIL, AS
SHOWN HEREIN. DETOUR SHALL INCLUDE TRAIL CLOSED SIGNS, DETOUR SIGNS, AND
BARRIERS TO CLEARLY ROUTE PEDESTRIANS AROUND THE WORK AREA.
20. CONTRACTOR SHALL NOTIFY RESIDENTS ON CREEK ROAD A MINIMUM OF 1-WEEK
PRIOR TO THE START OF CONSTRUCTION.
21. CONTRACTOR SHALL OBTAIN A NO FEE ENCROACHMENT PERMIT FROM THE CITY
AND ZONE 7 PRIOR TO THE COMMENCEMENT OF WORK.
SCALE: 1" = 20'
PLAN SCALE: 1 INCH = 20 FEET
C2
QUANTITY TABLE
DESCRIPTION UNIT QUANTITY
CONSTRUCTION FENCE LF 460
SEDIMENT, DEBRIS AND TRASH
REMOVAL, OFF-HAUL, AND DISPOSAL CY 160
2 TON ROCK RIP RAP TON 240
ROCK RIP RAP FILTER FABRIC SY 120
0+00 1+00 1+25
(N) 12 TON RIP RAP
(E) AC PATH
(E) GRADE
(N) GEOTEXTILE FABRIC
MIN 3' BELOW CHANNEL
FLOW LINE
(E) CHANNEL INVERT
MAX SLOPE OF
2:1, TYP.
4'-6"
FILL AND COMPACT VOIDS
W/ EXCAVATED MATERIAL
TO THE EXTENT FEASIBLE
REMOVE (E) SEDIMENT & DEBRIS
W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S S
S S
SS
SS
S S
SS
SS
S S
SSSS
S S
S S
SS
SS
S S
SS
S S
SS
SS
SS
SD
SD
S D
SDSDSD
S D
S D
SD
CONTRACTOR ACCESS
ROUTE, TYP.
COLLEGE AVENUE
CREEK ROAD
APPROXIMATE
PROJECT LOCATION
OLD TOWERS ROAD
F O
R E
S T
L A
N E
TH STREET
S O
U
TH
O S
TR
E
E T
S O
U
TH
N S
TR
E
E T
M cG
LI
N
C H
E Y
D R
IV
E
K
IN
G S
B U
R Y
D R
IV
E
PEDESTRIAN DETOUR ROUTE
SEE NOTE 5
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 14 - ARROYO MOCHO TRAIL
NEAR CREEK ROAD - ACCESS
PATH & SECTION VIEW
NOTES:
1. ACCESS SITE VIA COLLEGE AVENUE AND THE ARROYO BIKE TRAIL.
2. STAGING AREA AND ACCESS PATH SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AT COMPLETION OF CONSTRUCTION.
3. HYDROSEEDING SHALL BE INSTALLED ON THE STAGING AREA, THE ACCESS PATH, AND DISTURBED SLOPES AT THE COMPLETION
OF CONSTRUCTION; AVOID PLACEMENT IN LOW FLOW CHANNEL. COORDINATE WITH THE CITY TO DEFINE LIMITS OF
HYDROSEEDING PRIOR TO PLACEMENT.
4. CONTRACTOR SHALL BYPASS ALL CHANNEL FLOWS. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING TO ESTIMATE THE FLOW DIVERSION AND BYPASS REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING THE EXACT LOCATIONS OF THE COFFERDAMS AND THE SIZE AND LENGTHS OF THE BYPASS SYSTEMS REQUIRED FOR FLOW DIVERSION.
5. CONTRACTOR SHALL IMPLEMENT A DETOUR ROUTE FOR THE PEDESTRIAN TRAIL AS SHOWN HEREIN. DETOUR SHALL INCLUDE TRAIL CLOSED SIGNS, DETOUR SIGNS, AND BARRIERS TO CLEARLY ROUTE PEDESTRIANS AROUND THE WORK AREA.
6. CONTRACTOR SHALL NOTIFY ALL RESIDENTS WITHIN 1,000 LF OF THE WORK AREA A MINIMUM OF ONE WEEK PRIOR TO CONSTRUCTION. NOTICE SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL PRIOR TO DISTRIBUTION.
SCALE: 1" = 100'
ACCESS ROUTE PLAN
C3
HOR. SCALE: 1" = 10'
SECTION A
VER. SCALE: 1" = 5'
SCALE: 1 INCH = 100 FEET
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S D
S D
S D
S D
S D
REGRADE (E) ACCESS PATH
SEE TYPICAL SECTION A
(E) SANITARY SEWER
ANZA WAY
ACCESS ROAD TO STOCKPILE SITE
CONTRACTOR SHALL STAY WITHIN LIMITS
(N) CONSTRUCTION FENCE
SEE NOTE 5 AND DETAIL
D1
(E) 21" RCP SD
INCREASE HEIGHT OF ACCESS
ROAD OVER (E) 21" RCP SD
1'-6" MIN COVER OVER SD
CONTRACTOR ACCESS
PATH, TYP.
FILL (E) VOID W/ 14 TON RIP
SEE SECTION C
CONTRACTOR TO USE (E) STOCKPILED
GRANULAR MATERIAL TO FILL VOIDS AND
GRADE ACCESS ROAD AS SHOWN HEREIN
(E) TREES
PROTECT IN PLACE, TYP.
C5 C
C4 B
C5 D
C 4A
59+75 60+00 61+00 61+50
3'-2"±
10'-0"±
26'-3"± 23'-7"±
(N) GEOTEXTILE FABRIC,
ENCAPSULATE RIP RAP(E) GRADE
(E) 21" RCP SD
SUPPORTED ON
CONCRETE CRADLE
1'-6" MIN. SLOPE ACCESS ROAD
AT 3 % TO CONFORM TO
EXISTING GRADE, TYP.ELEV: 482.96±
FILL AND COMPACT VOIDS IN RIP RAP W/
ON-SITE GRANULAR MATERIAL FROM STOCKPILE
(N) 14 TON RIP RAP
(N) GRADE
ELEV: 481.03±
ELEV: 480.00±
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
SS
SS
SS
SSSS
SD
SD
S D
ANZA WAY
F
LO
R E
N C
E R
O A
D
CONTRACTOR ACCESS
ROUTE, TYP.
FILL AND COMPACT VOIDS IN ACCESS ROAD
USING ONSITE STOCKPILED MATERIAL
0'-6"
13'-0"±
CREATE LEVEL SURFACE FROM
ONSITE STOCKPILED MATERIAL
15'-5"±
(E) GRADE
REMOVE EXISTING DEBRIS AND LOSE MATERIAL
ALONG ACCESS ROAD PRIOR TO GRADING
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 13 - ARROYO MOCHO TRAIL
NEAR ANZA WAY - SITE PLAN
NOTES:
1. LOP 13 IS NOT SUBJECT TO SEASONAL RESTRICTIONS, THE CONTRACTOR SHALL COMPLETE ALL WORK BY
OCTOBER 31, 2024.
2. ACCESS SITE VIA FLORENCE ROAD.
3. STAGING AREA AND ACCESS PATH SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AT COMPLETION OF
CONSTRUCTION.
4. HYDROSEEDING SHALL BE PLACED ON ALL DISTURBED AREAS OUTSIDE THE LIMITS OF THE ACCESS ROAD
BEING RESTORED. HYDROSEEDING SHALL BE PLACED ON AREAS DISTURBED WITHIN THE STOCKPILE AREA AND ALONG THE ACCESS ROUTE TO THE STOCKPILE AREA. LIMITS OF HYDROSEEDING SHALL BE AS
DIRECTED BY THE CITY'S REPRESENTATIVE DURING CONSTRUCTION.
5. ORANGE CONSTRUCTION FENCE SHALL BE INSTALLED PRIOR TO PLACEMENT OF ANY EQUIPMENT OR
MATERIALS ON SITE. WORKSITE SHALL BE COMPLETELY ENCLOSED BY SUCH FENCING.
6. SUBGRADE SHOULD BE COMPACTED FIRMLY TO PREVENT SLUMPING OR UNDERCUTTING PRIOR TO
INSTALLATION OF GEOTEXTILE LINING.
7. EXCAVATED MATERIAL SHALL BE REUSED ON SITE TO FILL VOIDS IN THE RIP RAP, OR SHALL BE PLACED
WITHIN THE STOCKPILE AREA SHOWN ON THIS SHEET.
8. CONTRACTOR SHALL ATTEND STREAM MAINTENANCE PROGRAM (SMP) ENVIRONMENTAL TRAINING PRIOR
TO BEGINNING WORK.
9. CONTRACTOR SHALL IMPLEMENT ALL SMP BMPs AND CONSERVATION MEASURE IN COMPLIANCE WITH
RESOURCE REGULATORY PERMITS.
10. THE EXTENT, ELEVATIONS, AND QUANTITIES OF GRADING AND SEDIMENT REMOVAL IS APPROXIMATE AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES IN THE FIELD DURING
CONSTRUCTION.
11. CONTRACTOR SHALL REMOVE AND DISPOSE OF TRASH, SOIL, SILT, MUD, EXCESSIVE ORGANIC MATERIAL
AND DEBRIS.
12. AREA TO BE PROTECTED BY RIP RAP SHOULD BE CLEARED OF VEGETATION, BRUSH, AND UNSUITABLE SOILS.
13. CARE SHOULD BE TAKEN NOT TO TEAR OR PUNCTURE GEOTEXTILE. GEOTEXTILE DAMAGED DURING
INSTALLATION MUST BE REMOVED AND REPLACED BEFORE RIP RAP PLACEMENT.
14. CONTRACTOR SHALL USE EXISTING ONSITE STOCKPILED MATERIAL FOR ACCESS ROAD GRADING AND FILL.
CONTRACTOR SHALL SELECT AND SORT MATERIAL TO ELIMINATE THE USE OF FINE AND ORGANIC MATERIAL.
15. ALL DISTURBED AREAS WITHIN THE STOCKPILE AREA SHALL BE EVENLY GRADED UPON COMPLETION OF THE
PROJECT. GRADING SHALL BE PERFORMED TO ELIMINATE LOW SPOTS AND BIRD BATHS WITHIN THE DISTURBED AREAS. MAXIMUM SLOPES SHALL BE 3:1 (HORIZONTA:VERTICAL). GRADING SHALL BE ADJUSTED
AS DIRECTED BY THE CITY'S REPRESENTATIVES DURING CONSTRUCTION.
16. CONTRACTOR SHALL NOTIFY ALL RESIDENTS WITHIN 1,000 LF OF THE WORK A MINIMUM OF ONE WEEK PRIOR TO CONSTRUCTION. NOTICE SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL PRIOR TO
DISTRIBUTION.
SCALE: 1" = 30'
PLAN
SCALE: 1" = 80'
ACCESS ROUTE PLAN
SCALE: 1 INCH = 30 FEET
TYPICAL CROSS SECTION A
SCALE: 1" = 2'
C4
SECTION B
VER. SCALE: 1" = 10'
QUANTITY TABLE
DESCRIPTION UNIT QUANTITY
CONSTRUCTION FENCE LF 2465
RELOCATE AND COMPACT
MATERIAL ON-SITE
CY 200
4 TON ROCK RIP RAP TON 165
ROCK RIP RAP FILTER FABRIC SY 190
29+75 30+00 31+00 31+50
FILL AND COMPACT VOIDS IN RIP RAP W/ ON-SITE
GRANULAR MATERIAL FROM STOCKPILE
(N) 14 TON RIP RAP
(N) GRADE
3'-2"±8'-4"±
(E) 21" RCP SD
SUPPORTED ON
CONCRETE CRADLE
(E) GRADE
(N) GEOTEXTILE FABRIC,
ENCAPSULATE RIP RAP
SLOPE AT 2:1
1'-6"±
EXCAVATE AS NECESSARY TO EXTEND RIP RAP A MINIMUM OF
1-FOOT BELOW THE BOTTOM OF THE EXISTING 21-INCH RCP.
EXCAVATED MATERIAL SHALL BE USED TO FILL VOIDS IN RIP RAP
39+75 40+00 41+00 41+25
FILL AND COMPACT VOIDS IN RIP RAP W/
ON-SITE GRANULAR MATERIAL FROM STOCKPILE
(N) 14 TON RIP RAP
(N) GRADE
3'-2"±
9'-11"±
(E) GRADE
(E) 21" RCP SD
SUPPORTED ON
CONCRETE CRADLE
SLOPE AT 2:1
EXCAVATE AS NECESSARY TO EXTEND RIP RAP A MINIMUM OF
1-FOOT BELOW THE BOTTOM OF THE EXISTING 21-INCH RCP.
EXCAVATED MATERIAL SHALL BE USED TO FILL VOIDS IN RIP RAP
(N) GEOTEXTILE FABRIC,
ENCAPSULATE RIP RAP
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 13 - ARROYO MOCHO TRAIL NEAR
ANZA WAY - CROSS SECTIONS
SECTION C
VER. SCALE: 1" = 2.5'
NOTES:
1. SITE 13 IS NOT SUBJECT TO SEASONAL RESTRICTIONS, THE CONTRACTOR SHALL COMPLETE
ALL WORK BY OCTOBER 31, 2024.
2. SUBGRADE SHOULD BE COMPACTED FIRMLY TO PREVENT SLUMPING OR UNDERCUTTING
PRIOR TO INSTALLATION OF GEOTEXTILE LINING.
3. EXTENT OF GRADING AND SEDIMENT REMOVAL IS APPROXIMATE. VERIFY THE EXTENT WITH
THE CITY.
4. CONTRACTOR SHALL REMOVE AND DISPOSE OF TRASH, SOIL, SILT, MUD, EXCESSIVE ORGANIC
MATERIAL AND DEBRIS.
5. AREA TO BE PROTECTED BY RIP RAP SHOULD BE CLEARED OF VEGETATION, BRUSH, AND
UNSUITABLE SOILS.
6. CARE SHOULD BE TAKEN NOT TO TEAR OR PUNCTURE GEOTEXTILE. GEOTEXTILE DAMAGED
DURING INSTALLATION MUST BE REMOVED AND REPLACED BEFORE RIP RAP PLACEMENT.
7. CONTRACTOR SHALL USE EXISTING ONSITE STOCKPILED MATERIAL FOR ACCESS ROAD
GRADING AND FILL. CONTRACTOR SHALL SELECT AND SORT MATERIAL TO ELIMINATE THE USE
OF FINE AND ORGANIC MATERIAL.
C5
SECTION D
VER. SCALE: 1" = 2.5'
W
W W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W W W
W
W
W
W
W
W
W
W W
W W
WW
S S
S S
SD
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
A
IR
W A
Y B
O U
LE
V
A R
D
GV
GV
X
X
X
X
X X X
X X X
X
X X X X
DWV
REMOVE 17"Ø BLACK WALNUT
TREE & WILLOW AT BASE OF TREE
REMOVE 16"Ø BLACK WALNUT TREE (FALLEN)
(E) TOE OF CHANNEL
(E) TOP OF BANK
COFFERDAM IN CHANNEL AS
NECESSARY FOR CONSTRUCTION
NOTE 12
ARROYO LAS POSITAS
(N) CONSTRUCTION FENCE
SEE NOTE 5 AND DETAIL
D1
TEMPORARY STAGING & STOCKPILE AREA
SEE NOTE 3 & 13
CP27
200'
(N) TOP OF BANK
CP25
C
7DC
7C
C7B
C7A
LIMB (E) WILLOWS
ON NORTH BANK
MATCH GRADE OF (E) CHANNEL TO
CREATE SMOOTH TRANSITION FROM
SEDIMENT REMOVAL AREA TO (E)
CHANNEL, TYP OF UPSTREAM AND
DOWNSTREAM LIMITS OF WORK
(N) TOE OF SLOPE
REMOVE 18"Ø BLACK WALNUT TREE
REMOVE EXISTING SEDIMENT, DEBRIS, AND SELECT
TREES. CREATE SMOOTH TRANSITION FROM CULVERTS.
REMOVE, STOCKPILE, AND REPLACE TOPSOIL
SEE NOTE 19
COFFERDAM IN CHANNEL AS
NECESSARY FOR CONSTRUCTION
NOTE 12
33'±
(E) ORDINARY HIGH WATER MARK
LIMB (E) 22"Ø VALLEY OAK TREE,
SEE NOTE 18
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 5 - AIRWAY CULVERT -
PLAN VIEW
NOTES:
1. ALL WORK BELOW TOP OF BANK SHALL BE COMPLETED PRIOR TO OCTOBER 15, 2024.
2. ACCESS SITE VIA AIRWAY BOULEVARD.
3. TEMPORARY STOCKPILE AND STAGING AREA MAY BE USED FOR TEMPORARY STOCKPILE OF MATERIALS
AND STAGING OF EQUIPMENT AS NECESSARY DURING CONSTRUCTION. STAGING AREA SHALL BE
RESTORED TO ITS ORIGINAL CONDITION AT COMPLETION OF CONSTRUCTION.
4. BIODEGRADABLE EROSION CONTROL BLANKET AND BROADCAST SEEDING SHALL BE INSTALLED ON DISTURBED SLOPES STEEPER THAN 4H:1V, AND HYDROSEEDING SHALL BE PLACED ON ALL OTHER DISTURBED AREAS AT THE COMPLETION OF CONSTRUCTION. AVOID PLACEMENT IN LOW FLOW CHANNEL.
5. CONSTRUCTION FENCE SHALL BE INSTALLED PRIOR TO PLACEMENT OF ANY EQUIPMENT OR MATERIALS ON SITE. WORKSITE SHALL BE COMPLETELY ENCLOSED BY SUCH FENCING. THE LOCATION AND LENGTH OF FENCING IS APPROXIMATE AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S
REPRESENTATIVES IN THE FIELD DURING CONSTRUCTION.
6. CONTRACTOR SHALL EXCAVATE, OFF-HAUL, AND DISPOSE OF ALL SEDIMENT, DEBRIS AND VEGETATION
AS DETAILED ON THE PLANS AND SPECIFICATIONS.
7. CONTRACTOR SHALL ATTEND STREAM MAINTENANCE PROGRAM (SMP) ENVIRONMENTAL TRAINING PRIOR
TO BEGINNING WORK.
8. CONTRACTOR SHALL IMPLEMENT ALL SMP BMPs AND CONSERVATION MEASURE IN COMPLIANCE WITH
RESOURCE REGULATORY PERMITS.
9. CONTRACTOR SHALL REMOVE SEDIMENT, DEBRIS, AND TRASH UPSTREAM OF ROAD CROSSING, WITHIN CULVERTS, AND DOWNSTREAM OF ROAD CROSSING. ALL MATERIAL REMOVED FROM THE SITE SHALL BE
TRANSPORTED AND DISPOSED OF AT AN APPROPRIATE LANDFILL/DISPOSAL SITE.
10. THE EXTENT, ELEVATIONS, AND QUANTITIES OF GRADING AND SEDIMENT REMOVAL IS APPROXIMATE AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES IN THE FIELD
DURING CONSTRUCTION.
11. THE LOCATIONS AND LIMITS OF TREE REMOVAL AND TRIMMING IS APPROXIMATE AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES IN THE FIELD DURING
CONSTRUCTION.
12. CONTRACTOR SHALL BYPASS ALL CHANNEL FLOWS. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING TO ESTIMATE THE FLOW DIVERSION AND BYPASS REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING THE EXACT LOCATIONS OF THE COFFERDAMS AND THE SIZE AND LENGTHS OF THE
BYPASS SYSTEMS REQUIRED FOR FLOW DIVERSION.
13. MATERIAL REMOVED FROM THE DRAINAGE CHANNEL SHALL BE STOCKPILED AND DRAINED AT THE TEMPORARY STOCKPILE LOCATION SHOWN ON THIS SHEET, PRIOR TO BEING TRANSPORTED TO THE
PERMANENT SEDIMENT FILL AREA SHOWN ON SHEET C8.
14. THE CITY'S BIOLOGIST SHALL BE ON-SITE DURING ALL CONSTRUCTION ACTIVITIES. THE CITY'S BIOLOGIST
HAS THE AUTHORITY TO STOP WORK AT ANY TIME DURING CONSTRUCTION.
15. TYPICAL AVERAGE DRY WEATHER FLOW IN ARROYO LOS POSITAS IS 4 CUBIC FEET PER SECOND (CFS).
POTENTIAL PEAK DRY WEATHER FLOW IS 10 CFS. CONTRACTOR SHALL ADEQUATELY CONTROL AND BYPASS ANY AND ALL FLOWS THAT OCCUR DURING CONSTRUCTION AS SHOWN HEREIN AND DETAILED IN
THE SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR MONITORING CHANNEL FLOW RATES,
MONITORING THE WEATHER, AND PROTECTING THE SITE FROM CHANNEL FLOWS AND EROSION.
16. NO WORK SHALL COMMENCE PRIOR TO THE COMPLETION OF THE QUALIFIED BIOLOGIST SURVEY TO BE
COMPLETED BY THE CITY.
17. CONTRACTOR SHALL REMOVE AND DISPOSE OF TRASH, SOIL, SILT, MUD, EXCESSIVE ORGANIC MATERIAL
AND DEBRIS.
18. SEDIMENT REMOVAL SHALL NOT OCCUR WITHIN THE LIMITS OF THE EXISTING 22-INCH VALLEY OAK TREE
ROOT SYSTEM.
19. TOPSOIL WITHIN THE SEDIMENT REMOVAL AREA SHALL BE TEMPORARILY STOCKPILED AND REPLACED WITHIN THE SEDIMENT REMOVAL AREA UPON COMPLETION OF SEDIMENT REMOVAL AND GRADING.
20. EQUIPMENT SHALL NOT ENTER THE CHANNEL BELOW THE OHWM AS DIRECTED BY THE CITY'S BIOLOGIST.
ALL EXCAVATIONS SHALL BE SHALL BE PERFORMED WITH AN EXCAVATOR, A DOZER SHALL NOT BE USED
TO GRADE OR REMOVE MATERIAL FROM THE SITE.
SCALE: 1" = 30'
PLAN
SCALE: 1 INCH = 30 FEET
C6
LOCAL BENCHMARKS
CP#
NORTHING
(FT)
EASTING
(FT)
ELEVATION
(FT)
25 2079501.08 6180309.78 384.51
27 2079507.37 6180388.95 390.39
QUANTITY TABLE
DESCRIPTION UNIT QUANTITY
CONSTRUCTION FENCE LF 1090
SEDIMENT, DEBRIS AND TRASH
REMOVAL, OFF-HAUL, AND DISPOSAL CY 10
SEDIMENT EXCAVATION, PLACEMENT,
AND COMPACTION AT STOCKPILE AREA
CY 860
0+50 1+00 1+50
(E) GRADE
(N) GRADE
ELEV: 375.91
REMOVE (E) SEDIMENT
& DEBRIS
TRIM (E) WILLOWS
ON NORTH BANK
10+00 11+00 11+50
10+00 11+00 11+50
(E) GRADE
(N) GRADE, SLOPE
AT 3:1 MAX, TYP.
ELEV: 376.44
REMOVE (E) SEDIMENT
& DEBRIS
TRIM (E) WILLOWS
ON NORTH BANK
30+00 31+00 31+75
(E) GRADE
(N) GRADE, SLOPE
AT 3:1 MAX, TYP. ELEV: 377.77
REMOVE (E) SEDIMENT
& DEBRIS
ELEV: 379.77
TRIM (E) WILLOWS
ON NORTH BANK
20+00 21+00 21+75
20+00 21+00 21+75
ELEV: 379.17
(E) GRADE
ELEV: 377.17
REMOVE (E) SEDIMENT
& DEBRIS
(N) GRADE, SLOPE
AT 3:1 MAX, TYP.
TRIM (E) WILLOWS
ON NORTH BANK
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 5 - AIRWAY CULVERT
- SECTION VIEWS
NOTES:
1. ALL WORK BELOW TOP OF BANK SHALL BE COMPLETED PRIOR TO OCTOBER 15, 2024.
2. CONTRACTOR SHALL EXCAVATE, OFF-HAUL, AND DISPOSE OF ALL DEBRIS, TRASH AND VEGETATION AS DETAILED ON
THE PLANS AND SPECIFICATIONS. SEDIMENT SHALL BE PLACED IN THE PERMANENT FILL AREA AS SHOWN ON SHEET C8.
3. CROSS SECTION SHOWN LOOKING DOWNSTREAM. REFER TO SHEET C6 FOR LOCATION AND ORIENTATION.
4. LIMITS OF PROPOSED GRADING AND ELEVATIONS ARE APPROXIMATE, CONFIRM WITH CITY PRIOR TO EXCAVATION.
SECTION A
SECTION B
SECTION C
SECTION D
C7
W W
W W
W W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W
SS
SS
S S
S S
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
SD
S D
GV
GV
X
X
X X
X X
X
H
Y
DWV
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
LOP 5 - AIRWAY CULVERT -
SEDIMENT STOCKPILE AREA
SCALE: 1" = 50'
PLAN
APPROXIMATE LIMITS OF
PERMANENT SEDIMENT FILL AREA
AREA: 14,100 FT2
AVERAGE DEPTH: 1 FT
NOTE 3
A
IR
W A
Y B
O U
LE
V
A R
D
US580 (OFF RAMP)
REMOVE (E) SEDIMENT,
DEBRIS, AND SELECT TREES
SEE SHEETS C5 AND C6
C8
(E) CART PATH BRIDGE
DOWNSTREAM
COFFERDAM UPSTREAM
COFFERDAM
NOTES:
1. THE LOCATION, LIMITS, AND DEPTH OF THE MATERIAL STOCK PILE AREA IS APPROXIMATE
AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES
IN THE FIELD DURING CONSTRUCTION.
2. PRIOR TO OFF-HAULING MATERIAL TO STOCKPILE SITE, CONTRACTOR SHALL MAKE SURE
THAT GRAVEL IS FREE OF SOIL, SILT, MUD, EXCESSIVE ORGANICS AND DEBRIS PRIOR TO
OFF-HAUL. THE MATERIAL SHALL ALSO BE DRAINED PRIOR TO OFF-HAUL AND DISPOSAL.
3. MATERIAL PLACED AT THE PERMANENT FILL AREA SHALL BE GRADED SMOOTH AS
DIRECTED BY THE CITY AND SHALL BE COMPACTED TO 85% RELATIVE COMPACTION.
GRADING SHALL BE PERFORMED TO ELIMINATE LOW POINTS AND BIRD BATHS WITHIN AND
SURROUNDING THE STOCKPILED MATERIAL. THE PERMANENT FILL AREA, THE TEMPORARY
STOCKPILE AREA, AND ALL SURROUNDING DISTURBED AREAS SHALL BE HYDROSEEDED
UPON COMPLETION OF THE PROJECT.
4. THE CONSTRUCTION AND STAGING LIMITS SHOWN ARE APPROXIMATE AND SHALL BE
ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES. THE CONTRACTOR SHALL
ENSURE THAT THE TOTAL AREA OF DISTURBANCE AT THE SITE IS LESS THAN 1 ACRE.
5. CONSTRUCTION FENCE SHALL BE INSTALLED PRIOR TO PLACEMENT OF ANY EQUIPMENT
OR MATERIALS ON SITE. WORKSITE SHALL BE COMPLETELY ENCLOSED BY SUCH FENCING.
THE LOCATION AND LENGTH OF FENCING IS APPROXIMATE AND SHALL BE CONFIRMED AND
ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES IN THE FIELD DURING
CONSTRUCTION.
CONSTRUCTION FENCE
NOTE 5
SCALE: 1 INCH = 50 FEET
LIMB (E) TREES AND WILLOWS
SEE SHEETS C5 AND C6
APPROXIMATE LIMITS OF
TEMPORARY STOCKPILE AREA
2' O C
1' O C
6' WIDE (TYP)2' (TYP)
TOP OF BIOENGINEERED REVETMENT
UPSTREAM END
DOWNSTREAM END
3'
6"
(TYP)
2' O C
FLOW
FLOW
TOP OF BANK
1. OVERLAP DIRECTION OF STREAM FLOW.
2. EROSION CONTROL BLANKET SHALL BE MADE OF BIODEGRADABLE
MATERIAL, NO POLYURETHANE NETTING PERMITTED.
NOTES
1' O C
NOTES
1' O C
NOTES
M
IN
6'-0" (MAX)
FASTENERS (TYP)
8" M
A X
(T Y
P
FENCE OPENING DETAIL
CONSTRUCTION
FENCE FABRIC
POST
CONSTRUCTION
FENCE FABRIC
POST
END POSTSVARIES
VARIES VARIES
45°
TYP
SLOPE
COMPACTED BACKFILL
CONSTRUCTION
FENCE FABRIC
FASTENER (TYP)
POST
NOTES
1. ALL FENCING SHALL BE REMOVED BY CONTRACTOR AT END OF PROJECT.
2. POSTS TO BE INSTALLED ON INSIDE ASPECT OF WORK SITE.
3. CONTRACTOR SHALL MARK AND REVIEW THE PROPOSED LOCATIONS OF THE CONSTRUCTION FENCE WITH THE CITY'S BIOLOGIST PRIOR TO CONSTRUCTION. THE LOCATION AND EXTENTS IS AT
THE DISCRETION OF THE BIOLOGIST, THE CONTRACTOR SHALL ADJUST AS DIRECTED BY THE CITY'S BIOLOGIST.
POST
CONSTRUCTION FENCE FABRIC
GROUND SURFACE
2023 STORM DAMAGE REPAIR PROJECT (LOP 5, 13, & 14)
City Project No. S202300A & S202300P
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
C I LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf Wheeler
NTS
DETAILS
D1
EROSION CONTROL BLANKET DETAIL
SCALE: NTS
D1
CONSTRUCTION FENCE INSTALLATION DETAIL
SCALE: NTS
D-1
| Sheets and Views |
| T-1 - TITLE SHEET |
| T-2 - NOTES, ABBREVIATIONS, AND LEGEND |
| C1 - PROJECT LOCATION MAP |
| C2 - LOP 14 - ARROYO MOCHO TRAIL NEAR CREEK ROAD - SITE PLAN |
| C3 - LOP 14 - ARROYO MOCHO TRAIL NEAR CREEK ROAD - ACCESS PATH & SECTION VIEW |
| C4 - ARROYO MOCHO TRAIL NEAR ANZA WAY - SITE PLAN |
| C5 - LOP 13 - ARROYO MOCHO TRAIL NEAR ANZA WAY - CROSS SECTIONS |
| C6 - LOP 5 - AIRWAY CULVERT - PLAN VIEW |
| C7 - LOP 5 - AIRWAY CULVERT - SECTION VIEWS |
| C8 - LOP 5 - AIRWAY CULVERT - SEDIMENT STOCKPILE AREA |
| D-1 - DETAILS |
File details come from the government source that posted it. Updated .