District-Wide 3 Year Fencing Request for Proposal Summary
This is a Request for Proposal (RFP) document from the Royal Oak School District (Royal Oak Schools, Michigan) for district-wide fencing installation and removal services over a three-year contract period. The project involves the installation of chain-link fencing at multiple district locations in heights of 4, 6, and 8 feet, as well as backstop installations and removal of existing fencing. Bidders were required to submit sealed electronic bids no later than 1:30 PM on Thursday, April 30, 2020, with virtual bid opening scheduled for 2:00 PM the same day. There was no mandatory pre-bid meeting. Prospective bidders were required to visit project sites to verify conditions and field measurements. The Board of Education recommendation for contract award was scheduled for Thursday, May 14, 2020 at 7:00 PM. The contract term spans three years with provisions for bidders to propose percentage price increases for 2021 and 2022.
Bidders must submit unit pricing for fencing installation and removal by linear footage (100-foot sections) and backstop work, along with an hourly labor rate. The bid must include 100 percent Performance and Payment Bonds. Bidders must demonstrate at least five years of successful experience on similar work and maintain comprehensive insurance coverage including workers' compensation, general liability, automobile liability, and an Owner's Contractor's Protective Policy, all with minimum combined single limits of $1,000,000 per occurrence. An 18-month warranty on materials and installation is required. All bidders must submit sworn affidavits disclosing familial relationships with school board members or superintendent and certifying non-compliance with Iran Economic Sanctions Act requirements. Bidders are responsible for obtaining all permits, licenses, and taxes; daily cleanup and debris removal; site restoration; and background checks for all on-site personnel. The District reserves the right to terminate the contract for convenience and may reject any or all bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Royal Oak Schools
Request for Proposal April 14, 2020
The Royal Oak School District (also referred to the District or ROS in these documents) will accept sealed bids for:
District-Wide 3 Year Fencing as described in the attached specifications, sealed bids are due no later than 1:30 PM local time Thursday April 30, 2020. These bids shall be shall be submitted electronic per the following link:
https://forms.gle/7KadnggaaovZuGy37. Bids will be opened virtually at 2:00 pm local time Thursday April 30, 2020. Bidders need to send an e-mail to mark.paulus@royaloakschools.org with their bid password they created when downloading the bid information and at that time, they bidder will receive the virtual bid opening link. There will be no pre-bid meeting. If there are any questions contact Mark Paulus at (248) 880-6791 or mark.paulus@royaloakschools.org. Bid documents are available online by going to the District’s web site, www.royaloakschools.org and clicking on District/Departments/Finance and Current Bids.
Sealed bids should be submitted electronical per the following link:
https://forms.gle/7KadnggaaovZuGy37. Bids are to be submitted no later than 1:30 PM Thursday, April 30, 2020. Bids will be opened virtually at 2:00 pm local time Thursday April 30, 2020. Bidders need to send an e-mail to mark.paulus@royaloakschools.org with their bid password they created when downloading the bid information and at that time, they bidder will receive the virtual bid opening link. The District will not consider or accept a bid received after the date and time specified for bid submission. No hard copy, oral, email, telephonic or telegraphic proposals shall be considered.
The Board of Education reserves the right to accept or reject any or all bids in whole or in part; or, for reasons of establishing uniformity, delivery time or preference, to award the contract to other than the low bidder.
The contents of RFP and Bidder’s (also referred to as Contractor in these documents) Proposal will become contractual obligations, if a contract ensues. Failure of the Bidder to accept these obligations will result in cancellation of the award. Award of a contract by the District is subject to the Contractor executing a Contract, which shall incorporate the contents of this RFP and the Contractor’s Proposal and final approval if the same by the District’s legal counsel.
In compliance with MCL 380.1267, the bid shall be accompanied by a sworn statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board, or the superintendent of the school district. The bid shall also be accompanied by a sworn statement disclosing whether the bidder is an Iran Linked Business in compliance with PA 517 of 2012.
The Board shall not accept a bid that does not include these sworn disclosure statements.
All bids shall be firm for at least sixty (60) days from the date of opening of bids. Length of time required for completion shall be specified in the bid. All bids submitted must meet of exceed all specifications herein.
Bids are to be submitted on our Bid Proposal Form, signed by the bidder, via electronical per the following link: https://forms.gle/7KadnggaaovZuGy37. Bids are to be submitted no later than 1:30 PM Thursday, April 30, 2020. Bids will be opened virtually at 2:00 pm local time Thursday April 30, 2020.
Bidders need to send an e-mail to mark.paulus@royaloakschools.org with their bid password they created when downloading the bid information and at that time, they bidder will receive the virtual bid opening link.
One (1) copy of the bid form should be retained for your files. Any questions should be referred to Mark Paulus, Owner’s Representative, 248-880-6791.
ROYAL OAK SCHOOL DISTRICT Business Office Page 2 District-Wide 3 Year Fencing – Bid
INSTRUCTIONS TO BIDDERS
GENERAL CONDITIONS:
1. Proposal/Intent
Furnish materials and labor to provide all materials and installation associated with the attached drawings and specifications. Note also this is for a 3 year contract with Royal Oak Schools. Please provide proposed increases for 2021 and 2022 associated with unit pricing.
Manufacturers’ numbers are shown for convenience in identifying items.
Manufacturers’ description constitutes requirements for each such item or component.
Use of Manufacturers’ numbers and other requirements set forth in Specifications are not intended to preclude use of any other approved manufacturer’s products or procedures which may be equivalent, solely as determined by the Owner, but are given for the purpose of establishing standards for design, function and quality of materials, construction and workmanship.
2. Types of Proposals
See bid proposal form.
3. Receipt of Bids https://forms.gle/7KadnggaaovZuGy37. Bids are to be submitted no later than 1:30 PM Thursday, April 30, 2020. Bids will be opened virtually at 2:00 pm local time Thursday April 30, 2020. Bidders need to send an e-mail to mark.paulus@royaloakschools.org with their bid password they created when downloading the bid information and at that time, they bidder will receive the virtual bid opening link. The District will not consider or accept a bid received after the date and time specified for bid submission. No hard copy, oral, email, telephonic or telegraphic proposals shall be considered.
4. Bidders’ Qualifications
Bidders shall be able to demonstrate the following:
Shall be reputable, recognized organization with at least five (5) years successful experience on work of this type & scope, of equal or better quality than this project.
The District, as part of the bidder’s qualifications, can include as part of the criteria for determining which vendor to recommend to the Board, information on whether the vendor or the owner is a taxpayer in the District (local vendor consideration). Bid form has a place for the bidder to indicate if they fall within this criterion. If necessary, the District will ask for information documenting this bidder’s status after the bid opening.
5. Warranty
Contractor shall warranty materials and installation of all components for a period of 18 months from date of acceptance by the owner of job completion.
Page 3 District-Wide 3 Year Fencing – Bid
6. Project Meeting
Pre-job conference to be scheduled within five (5) days after award, to be determined by Mark Paulus, Owner’s Representative at (248) 880-6791.
7. Work Schedule
This will be determine with each individual project.
Failure to close out the project including but not limited to punch list permit finalization and closeout documents from final completion shall result in a penalty of $500 per day.
8. Clean-up and Disposal
The Contractor shall be responsible to clean-up all debris and dispose of it off-site.
This MUST BE DONE DAILY. If the District has to provide clean up after contractors, there will be a $500 per event fee in addition to disposal costs.
9. Damage Repair
Survey of the site will be conducted, and documented by the contractor, to determine current site conditions. Survey to be provided to the District prior to the start of construction. Contractor shall be responsible to repair any damage to the site, which occurs during this project.
Contractors and their Sub Contractors shall park their work vehicles in the area(s) designated for parking. Contractors and their Sub Contractors shall not park or drive on sidewalks or landscape areas. Failure to repair, District will complete, and Contractor will be responsible for all costs. There will also be a $500 fee assessed for any vehicles that are documented to be parking on sidewalks or landscape areas.
10. Submittal of Bid
Before submitting a bid, bidders shall carefully read all the bid documents in order to avoid omission or duplications. To ensure a complete project, bidders shall visit the premises, verify site conditions and conditions under which work under the contract must be conducted. Submission of a bid signifies that the bidder has visited the project premises, has made examinations and verifications and is fully conversant with all conditions under which the work is to be performed. No claims for additional compensation will be considered or paid to the successful bidder, due to said successful bidder’s failure to be so informed.
Any exceptions to the terms and conditions contained in this RFP or the form Contract attached to this RFP, if there is one attached, or any other special considerations or conditions requested or required by the bidder MUST be specifically enumerated by the bidder and be submitted and accepted prior to the bid due date, together with an explanation as to the reason such terms and conditions of this RFP or form of Contact cannot be met by, or in the bidder’s opinion should not be applicable to, the bidder.
The bidder shall be required and expected to meet the bid documents and the requirements as set forth in this RFP and the form of Contract in their entirety, except to the extent exceptions or special considerations or conditions are expressly set forth in the bidder’s Proposal and those exceptions or special considerations or conditions are expressly accepted by the District.
Page 4 District-Wide 3 Year Fencing – Bid https://forms.gle/7KadnggaaovZuGy37. Bids are to be submitted no later than 1:00 PM Tuesday, March 31, 2020. Bids will be opened virtually at 1:30 pm local time Tuesday March 31, 2020. Bidders need to send an e-mail to mark.paulus@royaloakschools.org with their bid password they created when downloading the bid information and at that time, they bidder will receive the virtual bid opening link. The District will not consider or accept a bid received after the date
11. Familial Relationship
All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board or the superintendent of the school district.
The District shall not accept a bid that does not include this sworn disclosure statement.
12. Iran Economics Sanctions Act
Each bid must be accompanied by a sworn statement certifying that the Contractor is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, PA 516 of 201.
13. Withdrawal of Bids
Any bidder may withdraw his bid at any time prior to the scheduled time for receipt of bids. No proposals may be withdrawn for at least sixty (60) days after the scheduled closing time of the bid.
14. Firm Prices
Prices and notations must be typed or in ink. No erasures are permitted. Mistakes may be crossed out and corrections entered and initialed, in ink, by the person signing the proposal.
In the event of discrepancy between the unit price and the extension, the UNIT PRICE SHALL GOVERN. The price inserted must be net including all freight, discounts, rebates, and allowances.
15. Permits, Fees, Regulations and Taxes
The Contractor shall obtain and pay for all permits, assessments, fees, bonds, and other charges as necessary to perform and complete the work of this contract, including disconnection charges, capping and unplugging utilities.
The Contractor shall be responsible for obtaining all permits and licenses necessary for the proper completion of project. Permits and licenses are available from the appropriate agencies having jurisdiction. The Contractor shall give all notices, pay all fees and comply with all laws, ordinances, rules and regulations bearing on the work.
At the completion of the project, the contract will provide to the District all paperwork related to the full execution of the permits(s), including all payments and inspections.
Page 5 District-Wide 3 Year Fencing – Bid
If any of the work of the Contractor is done contrary to such laws, ordinance rules and regulations without such notice, he shall bear all costs arising therefrom. The Contractor shall include all cost and taxes in its bid and make proper provisions for payment of all other State and Federal applicable taxes, fees or other costs.
The bid amount shall INCLUDE sales tax.
16. Delivery/Installation
Time of delivery is part of the consideration. It is understood that the bidder agrees to deliver prepaid to the schools, specified from the resulting contract, all items. All cost of delivery, drayage, freight, packing, unpacking, and setup are to be included in the prices bid.
The Contractor is responsible for removing from the project all waste materials and rubbish resulting from his operations and installation including all packing cartons and debris. Removal is to occur on a daily basis. Failure to do so will result in the Owner doing so and the cost thereof shall be charged to the Contractor as a deduction in his contract price.
The Contractor shall provide an adequate number of qualified, experienced installers, in harmony with other works at the site.
17. Bonds
Performance Bond/Payment Bond
Within fourteen (14) days after date of issuance of written notice of selection for the award of a contract, which shall be considered as the notice to proceed, the successful bidder shall enter into a contract with the Owner and shall execute and file with the Owner, the following in the amount 100% equal to full contract sum.
The Performance Bond must insure the faithful performance of all provisions of the contract and satisfactory completion of the specified work, within the time agreed upon.
The Payment Bond must insure the payment and protection of claimants supplying labor or materials to the principal contractor or his subcontractors in the prosecution of the work provided for in the contract. The successful contractor’s bond company must be listed by the State of Michigan as a licensed carrier and have an excellent or superior rating from AM Best Company.
18. Safety
Under the “General Conditions of the Contract for Construction” of the contract to be awarded, the Contractor;
a. shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures;
b. shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the performance of the contract;
c. shall take reasonable precautions for safety of all persons who may be affected, including employees of the Contractor and Subcontractor; and
d. shall have an accident prevention representative at the site.
e. Shall have and follow their Corporate Safety Plan/Program
Page 6 District-Wide 3 Year Fencing – Bid
The general conditions of the contract for construction and the agreement also require that the Contractor indemnify the Owner, its officers, agents, servants, volunteers and employees in the event of certain claims arising out of the performance of the work.
19. Insurance Requirements
The Contractor shall protect, defend and indemnify the Owner, its officers, agents, servants, volunteers, and employees from any and all liabilities, claims, liens, demands, and costs of whatsoever kind and nature which may result in injury or death to any persons, and for any result in injury or death to any person, and for loss or damage to any property, including property owned or in the care, custody, or control of the Owner in connection with or in any way incident to or arising out of the occupancy, use, with this Agreement resulting in whole or in part from negligent acts or omissions of the Contractor, any Subcontractor, or any employee, agent or representative of the Contractor or any Subcontractor.
The Contractor shall maintain, at its expense, during the term of this contract the following insurance:
a. Worker’s Compensation Insurance with statutory limits and Employer’s Liability Insurance with a minimum limit of $1,000,000 each occurrence.
b. Comprehensive General Liability Insurance with a minimum combined single limit of $1,000,000 per occurrence, $1,000,000 aggregate, in the same amount made for bodily injury and property damage. The policy is to include products and completed operations, cross liability, broad form property damage, independent contractors, and contractual liability coverage. The policy shall be endorsed to provide sixty (60) days written notice to the District of any material change of coverage, cancellation, or non-renewal of coverage.
c. If Subcontractors are likely to be used, the Comprehensive General Liability policy shall include coverage for independent Contractors.
d. Owner’s Contractor’s Protective Policy-comprehensive in the name of the Owner, with a minimum combined single limit of $1,000,000 per occurrence in the same amount for bodily injury or property damage.
e. Automobile Liability insurance covering all owned, hired, and non-owned vehicles with personal protection insurance and property insurance to comply with the provisions of the Michigan no-fault Insurance Law, including residual liability insurance with a minimum combined single limit of $1,000,000 each occurrence of bodily injury and property damage.
f. All insurance policies shall be issued by companies licensed to do business in the State of Michigan. The companies issuing the policies must be domestic (on-shore) companies and have an A rating by AM Best.
g. The Contractor shall be responsible for payment of all deductibles contained in any insurance policy required in this contract.
Page 7 District-Wide 3 Year Fencing – Bid
21. Compliance with School Safety Initiative Legislation
Meeting the requirements of the School Safety Initiative Legislation, being MCL 380.1230, 380.1230a, 380.1230c, 380.1230d and 380.1230g.
The Bidder acknowledges and agrees that the Bidder will have any and all its installation personnel (including sub-contractors) subjected to criminal history and background checks. Criminal history and background checks will be done within a year of the beginning of the project and should be completed before worked begins on this project.
The Bidder is required to provide written documentation for all on site personnel. The documentation will also verify that none of the personnel have a “listed offense” as indicated below. This documentation is to be provided before the beginning of the project and updated as necessary for any additions or subtractions from the list as long as the project lasts.
The Bidder shall indemnify, defend and hold the District, its employees, Board of Education, and each member thereof, agents and consultants, harmless from and against any and all claims, counter-claims, suits, debts, demands, actions, judgments, liens, liabilities, costs, expenses, including actual attorney’s fees and actual expert witness fees, arising out of or in connection with any violation of, or the Bidder’s failure to comply with the above paragraphs.
The Bidder shall be responsible for all costs and expenses associated with the above-required criminal history and background checks.
LISTED OFFENSES
a. MCL 750.145a - Accosting, enticing or soliciting child (less than 16 years of age) for immoral purposes.
b. MCL 750.145b - Accosting, enticing or soliciting child (less than 16 years of age) immoral purposes – second or subsequent offenses.
c. MCL 750.145c - Involvement in child sexually abusive activity or material, including possession of child sexually abusive material (“child” is a person less than 18 years of age who has not been legally emancipated.)
d. MCL 750.158 - Crime against nature (i.e., sodomy and beastiality) if the victim is an individual less than 18 years of age.
e. A third of subsequent violation of any combination of the following:
i. MCL 750.167(1)(f) - indecent or obscene conduct in a public place;
ii. MCL 750.335a - indecent exposure;
iii. A local ordinance of a municipality substantially corresponding to a section described in (a) or (b), supra.
f. Except for juvenile disposition or adjudication, a violation of:
i. MCL 750.338 - gross indecency between males; fellatio or masturbation;
ii. MCL 750.338a - gross indecency between females; oral sex;
iii. MCL 750.338b - gross indecency between male and female persons;
iv. if the victim is an individual less than 18 years of age.
g. MCL 750.349 - Kidnapping, if victim is an individual less than 18 years of age.
h. MCL 750.350 - Kidnapping; child under 14 years of age with intent to detain or conceal from child’s parent or legal guardian.
i. MCL 750.448 - Soliciting or accosting by a person 16 years of age or older, if victim is an individual less than 18 years of age.
Page 8 District-Wide 3 Year Fencing – Bid
j. MCL 750.455 - Pandering
k. MCL 750.520b - First degree criminal sexual conduct.
l. MCL 750.520c - Second degree criminal sexual conduct.
m. MCL 750.520d - Third degree criminal sexual conduct.
n. MCL 750.520e - Fourth degree criminal sexual conduct.
o. MCL 750.520g - Assault with intent to commit criminal sexual conduct.
p. Any other violation of a law of the state or a local ordinance of municipality that by its nature constitutes a sexual offense against an individual who is less than 18 years of age.
q. MCL 750.10a - Offense by sexually delinquent person (i.e., “any person whose sexual behavior is characterized by repetitive or compulsive acts which indicate a disregard of consequences or the recognized rights of others, or by the use of force upon another person in attempting sexual relations of either a heterosexual or homosexual nature, or by the commission of sexual aggressions against children under the age of 16”).
r. An attempt or conspiracy to commit an offense described in (1) through (17).
s. An offense substantially similar to an offense described in (1) through (17) under a law of the United States, any state, or any country or any tribal or military law.
22. Termination by the District for Convenience
The District may, at any time, terminate the Contract for the District’s convenience and without cause.
Upon receipt of written notice from the District of such termination for the District’s convenience, the Contractor shall:
a. Cease operations as directed by the District in the notice;
b. Take actions necessary, or that the District may direct, for the protection and preservation of the Work; and
c. Except for Work directed to performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further Subcontracts and purchase orders.
23. Bids, Notifications, Claims and Statements shall be signed as follows:
The person who has signed the proposal form shall have the authority to do so under the structure of the Bidder.
24. Owner Is An Equal Opportunity Employer
The Owner is an Equal Opportunity Employer. Pursuant to the Executive Order 11246 as amended, you are advised that under the provisions of this order, Contractors and Subcontractors are obligated to take affirmative action to provide equal opportunity without regard to race, creed, color, national origin, age or sex.
25. Michigan Right to Know Law
Royal Oak Schools will comply with the Michigan Right to Know Law by informing Contractors of hazardous chemicals to which they may be exposed. All Contractors will be required to provide Material Safety Data Sheets for any hazardous chemicals brought to the workplace. The Contractor shall comply with all applicable provisions of the Occupational Safety and Health Act for the duration of the specified work.
Page 9 District-Wide 3 Year Fencing – Bid
26. Asbestos Hazard Emergency Response Act
As required by the Environmental Protection Agency Asbestos Hazard Emergency Response Act, each school district is responsible for providing contractors with information regarding locations of known or assumed asbestos containing material prior to the Contractor entering a building under the school district’s jurisdiction. The successful bidder will be required to complete the school district’s Contractor Notification forms.
27. Notification of Assumed Lead-Containing Materials
The intent of this section is to formally notify all Contractors and Sub-Contractors applying for or bidding on work covered within this specification that, due to the age of the facilities within this District, there is the presumption that building components do contain lead-based paint pursuant to OSHA definition. The District has not conducted lead-based paint inspections. As a result, all Contractors and Sub- Contractors bidding must assume that building components do contain lead-based paint.
Furthermore, all awarded Contractors and Sub-Contractors shall be responsible to comply with all applicable Federal and Michigan State lead regulations including, but not limited to, 29 CFR Part 1926.62 of the OSHA Lead Construction Standard, (Part 603 of the Michigan State Standards). All costs associated with regulatory compliance shall be borne by the Contractor and/or Sub-Contractor.
28. General Conditions
The District reserves the right to accept or reject any or all proposals, to waive irregularities, and to accept a proposal which, in the District’s opinion, is in the District’s best interest.
The District reserves the right to declare as non-responsive, and reject, any bid which is incomplete or where material information requested in not furnished, or where indirect or incomplete answers or information is provided.
Negligence in preparation, improper preparation, errors in, or omissions from, proposal shall not relieve a bidder from fulfillment of any and all obligations and requirements of the proposed Contract Documents.
The District expects that the awarded bidder will complete the work as outlined in the bid documents for the amount bid by the bidder. Any additional costs above the amount bid and awarded, must be approved by the District in advance of any work.
Voluntary alternates for bids are acceptable but should NOT be put in the space for the Base Bid on the Bid Response Form but on an attached sheet, clearly labeled Voluntary Alternative. Such Alternates should be described in enough detail for the District to understand the Bidder’s intent.
Owner may choose to conduct testing to verify correct products and installation. If the materials and installation are found not to be per spec, Owner will require subsequent tests to be performed by Owners testing company at contractors’ expense.
Page 10 District-Wide 3 Year Fencing – Bid
No responsibility shall attach to the District, or the authorized representatives of either one, for the premature opening of any proposal, which is not properly addressed and identified.
The Contract Documents, as outlined in the executed Agreement, shall imply the inclusion of the entire agreement between the parties thereto, and the Contractor shall not claim any modification thereof resulting from any representation or promise made at any time by an officer, agent or employee of the District or by any other person.
If there is an issue with subcontractor and contractor which results in a legal preceding which is not tied to the performance of ROS or its staff, contractor to pay any time spent by ROS.
29. Opening and Awarding of Bids https://forms.gle/7KadnggaaovZuGy37. Bids are to be submitted no later than 1:30 PM Thursday, April 30, 2020. Bids will be opened virtually at 2:00 pm local time Thursday April 30, 2020. Bidders need to send an e-mail to mark.paulus@royaloakschools.org with their bid password they created when downloading the bid information and at that time, they bidder will receive the virtual bid opening link. The District will not consider or accept a bid received after the date
The recommendation for award will be submitted to the Board of Education at the regular Board of Education Meeting to be held on Thursday, May 14, 2020 at 7:00
PM.
See drawings and specifications in this bid package.
TECHNICAL SPECIFICATIONS:
Page 11 District-Wide 3 Year Fencing – Bid
My signature certifies that the Proposal as submitted complies with all of the terms and conditions set forth in the Request for Proposal unless specifically enumerated as an exception as part of our Proposal.
COMPANY NAME: _____________________________________________________
ADDRESS: ___________________________________________________________
AUTHORIZED SIGNATURE: _____________________________________________
AUTHORIZED NAME (please print): _______________________________________
TITLE: ________________________________________ DATE: ________________
CELL PHONE #: ________________________ FAX #: ________________________
E-MAIL: _____________________________________________________________
The undersigned certifies that the bid contained meets or exceeds the attached specifications. Include the bond and allowances amount in price(s).
Base Bid:
Unit Pricing:
Provide 4’ high assume 100’ section with posts 10’ O.C. $ _________________
Provide 6’ high assume 100’ section with posts 10’ O.C. $ _________________
Provide 8’ high assume 100’ section with posts 10’ O.C. $ _________________
Provide Backstop per detail $ _________________
Removal of 4’ high assume 100’ section with posts 10’ O.C. $ _________________
Removal of 6’ high assume 100’ section with posts 10’ O.C. $ _________________
Removal of 8’ high assume 100’ section with posts 10’ O.C. $ _________________
Removal of Backstop per detail $ _________________
Hourly rate $ _________________
Percentage increase 2021 ________
Percentage increase 2022 ________
Payment and Performance Bond Percentage _________
Page 12 District-Wide 3 Year Fencing – Bid
Bid Questions
Acknowledge receipt of Addendums: ____________________________________
Do you agree to the schedule and terms of the schedule? Yes No
Familial Disclosure Affidavit included? Yes No
Iran Linked Business Affidavit included? Yes No
Please state your warranty: _____________________________________________
State any prompt payment terms: __________% ___________days.
Do you conduct background checks on your employees? Yes No
Are you on the Excluded Parties List, which excludes you from receiving Federal Contracts or certain sub contracts, pursuant to the provisions of 31 U.S.C. 6101, note E.O. 12549, E.O. 12689, 48 C.F.R. 9.404? Yes No Unknown
At least three (3) references with contact person:
Company: __________________ Contact: __________________ Phone: __________
Company: __________________ Contact: __________________ Phone:___________
Company: __________________ Contact: __________________ Phone:___________
Page 13 District-Wide 3 Year Fencing – Bid
CONSTRUCTION BID DISCLOSURE STATEMENT – FAMILIAL RELATIONSHIP
Pursuant to MCL 380.1267, a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Royal Oak Schools Board or the Royal Oak Schools Superintendent must be accompanied with the bid. Bids without this disclosure statement will not be accepted.
The members of the Royal Oak Schools Board are: Deborah Anderson, Gary Briggs, Marty Cardamone, Jeff Brinker, Carrie Beerer, Allison Sykes, and Maryanne VanHaitsma
The Royal Oak Schools Superintendent is: Mary Beth Fitzpatrick
€ The Following are the familial relationships:
€ There are none.
STATE OF MICHIGAN )
) ss
COUNTY OF_____________)
The undersigned, authorized representative of bidder (insert name) does hereby acknowledge that bidder has read the foregoing disclosure statement and the statements herein contained are true.
Signature of Bidder Representative
Print Name
Title
Subscribed and sworn to before me this _____day of ___________________, Notary Public, ______________County, Michigan My commission expires: ____/____/________
Page 14 District-Wide 3 Year Fencing – Bid
AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below named contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the Royal Oak Schools (the “School District”) Request For Proposals For District-Wide 3 Year Fencing (the “RFP”), hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date the it is determined that the person has submitted the false certification.
CONTRACTOR:
Name of Contractor
By:
Its:
Date:
STATE OF )
)ss.
COUNTY OF ____________ )
This instrument was acknowledged before me on the _____ day of ________________, 20 , by __________________________.
, Notary Public
______________ County, __________
My Commission Expires:___________
Acting in the County of :___________
8850374.1 31354/151790
CHAIN-LINK FENCES AND GATES
Specifications -1
CHAIN-LINK FENCES AND GATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the front end document apply to this section.
1.2 SUMMARY
A. This Section includes the following:
1. Galvanized steel chain-link.
2. Swing Gates.
1.3 DEFINITIONS
A. CLFMI: Chain Link Fence Manufacturers Institute.
B. Zn-5-Al-MM Alloy: Zinc-5 percent aluminum-metal alloy.
1.4 SUBMITTALS
A. Product Data: Material descriptions, construction details, dimensions of individual components and profiles, and finishes for the following:
1. Fence and gate posts, rails, and fittings.
2. Chain-link fabric, reinforcements, and attachments.
3. Gates and hardware.
B. Meeting: Pre-construction/layout meeting is required at each district.
C. Product Certificates: Signed by manufacturers of chain-link fences and gates certifying that products furnished comply with requirements of the specification. This must be provided before final payment will be made. it is subsequently determined installed product does not meet written specifications contractor will replace with compliant product.
1.5 PROJECT CONDITIONS
A. Field Measurements: Verify layout information for chain-link fences and gates shown on Drawings in relation to property survey and existing structures. Verify dimensions by field measurements.
B. Source Limitations for Chain-Link Fences and Gates: Obtain each color, grade, finish, type, and variety of component for chain-link fences and gates from one source with resources to provide chain-link fences and gates of consistent quality in appearance and physical properties.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturers:
1. Merchants Metals.
2. American Fence Corporation.
3. Anchor Fence, Inc.
4. Other Fence Manufacturers complying with Basis of Design specifications and approved by the Architect.
Specifications -2
2.2 CHAIN-LINK FENCE FABRIC
A. Steel Chain-Link Fence Fabric: Provide fabric fabricated in one-piece widths for fencing in height of up to 12 feet (3.6 m) and less. Comply with CLFMI's "Product Manual" and with requirements indicated below:
1. Mesh and Wire Size: No. 9 ga. Steel wire. 2-inch (50-mm) mesh, 0.148-inch (3.76-mm) diameter.
a. Fabric Finish: Galvanized. ASTM A 392, Class 11, with not less than 2.0 oz. zinc per sq. ft. of surface.
2. Coat selvage ends of fabric that is metallic coated during the weaving process with manufacturer's standard clear protective coating.
B. Selvage: Knuckled at both selvages.
2.3 INDUSTRIAL FENCE STEEL FRAMING
A. Round Steel Pipe: Standard weight, Schedule 40, galvanized steel pipe complying with ASTM F 1083. Comply with ASTM F 1043, Material Design Group IA, external and internal coating Type A, consisting of not less than 1.8-oz./sq. ft. (0.55-kg/sq. m) zinc; and the following strength and stiffness requirements:
1. Corner and gate posts; 3” diameter pipe
2. Spacing of Line Posts - not to exceed 10 feet on-center.
3. Line posts – 2 ½” diameter pipe.
4. The bottom of all posts to be at 42” below grade.
B. Top Rails: Fabricate top rail from lengths 21 feet (6.4 m) or longer, with selvaged-end or fabricated for expansion-type coupling, forming a continuous rail along top of chain-link fabric.
C. Bottom Rails: Match top rail for coating and strength and stiffness requirements. Note where bottom rails are required.
2.4 INDUSTRIAL SWING GATES
A. General: Comply with ASTM F 900 for the following swing-gate types:
1. Single gate.
2. Double gate.
B. Metal Pipe and Tubing: Galvanized steel. Comply with ASTM F 1083 and ASTM F 1043 for materials and protective coatings.
1. Steel Pipe Sizes: Provide 2 inch minimum diameter pipes.
C. Frame Corner Construction: As follows:
1. Welded or assembled with corner fittings and 5/16-inch (7.9-mm-) diameter, adjustable truss rods for panels 5 feet (1.52 m) wide or wider.
D. Gate Posts: Fabricate members from round galvanized steel pipe with outside dimension and weight according to ASTM F 900.
F. Gate Hardware: Provide hardware and accessories for each gate, galvanized per ASTM A 153, and in accordance with the following: Latches permitting operation from both sides of gate, hinges, center gate stops and, for each gate leaf more than 5 feet (1.5 m) wide, keepers.
Fabricate latches with integral eye openings for padlocking; padlock accessible from both sides of gate.
Specifications -3
2.5 FITTINGS
A. General: Provide fittings for a complete fence installation, including special fittings for corners.
Comply with ASTM F 626.
B. Post and Line Caps: Hot-dip galvanized pressed steel or mill-finished aluminum. Provide weather-tight closure cap for each post.
1. Provide line post caps with loop to receive top rail.
C. Rail and Brace Ends: Hot-dip galvanized pressed steel or mill-finished aluminum. Provide rail ends or other means for attaching rails securely to each gate, corner, pull, and end post.
D. Rail Fittings: Provide the following:
1. Top Rail Sleeves: Hot-dip galvanized pressed steel or mill-finished aluminum. Not less than 6 inches (153 mm) long.
2. Rail Clamps: Hot-dip galvanized pressed steel or mill-finished aluminum. Provide line and corner boulevard clamps for connecting bottom rails in the fence line to line posts.
E. Tension and Brace Bands: Hot-dip galvanized pressed steel or mill-finished aluminum.
F. Tension Bars: Hot-dip galvanized steel or mill-finished aluminum, length not less than 2 inches (50 mm) shorter than full height of chain-link fabric. Provide one bar for each gate and end post, and two for each corner and pull post, unless fabric is integrally woven into post.
G. Truss Rod Assemblies: Hot-dip galvanized steel or mill-finished aluminum rod and turnbuckle or other means of adjustment.
H. Tie Wires, Clips, and Fasteners: Provide the following types according to ASTM F 626:
1. Standard Round Wire Ties: For attaching chain-link fabric to posts, rails, and frames, complying with the following:
a. Hot-Dip Galvanized Steel: 0.148 inch (3.76-mm-) diameter wire, coating thickness matching coating thickness of chain-link fence fabric. Aluminum will not be accepted.
2.6 CAST-IN-PLACE CONCRETE
A. General: Comply with ACI 301 for cast-in-place concrete.
B. Materials: Dry-packaged concrete mix complying with ASTM C 387 for normal-weight concrete mixed with potable water according to manufacturer's written instructions.
C. Concrete: Provide concrete consisting of Portland cement, ASTM C 150, aggregates ASTM C 33, and clean water. Provide minimum 2000 psi concrete compressive strength at 28 days.
D. Royal Oak Schools use concrete at corner posts and gate posts ONLY!
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for site clearing, earthwork, pavement work, and other conditions affecting performance.
1. Do not begin installation before Miss Dig has been contacted by your company and marked the site. Note any concern areas to Owner prior to installation.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
Specifications -4
3.2 PREPARATION AND REMOVAL OF EXISTING
A. Stake locations of fence lines, gates, and terminal posts. Do not exceed intervals of 500 feet (152.5 m) or line of sight between stakes. Indicate locations of utilities – public and private, lawn sprinkler system components, underground structures, benchmarks, and property monuments.
B. Where noted to remove existing fence prior to installation of new fence, carefully cut existing fence and remove the sections called for removal. Protect adjacent fence to remain and tie ends of existing fence to remain into terminal post or new post to be installed. Remove existing posts and concrete footings that fall within the fence removal sections. Note additional areas noted on drawings.
3.3 INSTALLATION, GENERAL
A. General: Install chain-link fencing to comply with ASTM F 567 and more stringent requirements specified.
B. Post Excavation: Drive, Drill or hand-excavate holes for posts to diameters and spacing indicated, in firm, undisturbed or compacted soil.
C. Post Setting: Hand-excavate holes for concrete foundations in firm, undisturbed or compacted soil. Set corner posts and gate posts only in concrete footing. Protect portion of posts aboveground from concrete splatter. Place concrete around posts and vibrate or tamp for consolidation. Using mechanical devices to set line posts per ASTM F 567 is not permitted.
Verify that posts are set plumb, aligned, and at correct height and spacing, and hold in position during placement and finishing operations until concrete is sufficiently cured.
1. Dimensions and Profile: As indicated on Drawings.
2. Exposed Concrete Footings: Extend concrete 2 inches (50 mm) above grade, smooth, and shape to shed water.
3.4 CHAIN-LINK FENCE INSTALLATION
A. Terminal Posts: Locate terminal end, corner, and gate posts per ASTM F 567 and terminal pull posts at changes in horizontal or vertical alignment of 30 degrees or more.
B. Line Posts: Space line posts uniformly at no more than 10 feet (3.05 m) on-center.
C. Post Bracing Assemblies: Install according to ASTM F 567, maintaining plumb position and alignment of fencing. Install braces at end and gate posts and at both sides of corner and pull posts. Locate horizontal braces at mid-height of fabric on fences with top-rail and at two-thirds fabric height on fences without top-rail. Install so posts are plumb when diagonal rod is under proper tension.
D. Top Rail: Install according to ASTM F 567, maintaining plumb position and alignment of fencing. Run rail continuously through line post caps, bending to radius for curved runs and terminating into rail end attached to posts or post caps fabricated to receive rail at terminal posts. Provide expansion couplings as recommended by fencing manufacturer.
E. Bottom Rails: Install, spanning between posts, using fittings and accessories. Note locations where tension wire should be used in lieu of bottom rail.
F. Chain-Link Fabric: Apply fabric to outside of enclosing framework. Leave 1 inch (25.4 mm) between finish grade or surface and bottom selvage, unless otherwise indicated. Pull fabric taut and tie to posts, rails, and tension wires. Anchor to framework so fabric remains under tension after pulling force is released.
G. Tension or Stretcher Bars: Thread through fabric and secure to end, corner, pull, and gate posts with tension bands spaced not more than 15 inches (380 mm) on-center.
Specifications -5
H. Tie Wires: Use steel wire of proper length to firmly secure fabric to line posts and rails. Attach wire at one end to chain-link fabric, wrap wire around post a minimum of 180 degrees, and attach other end to chain-link fabric. Bend ends of wire to minimize hazard to individuals and clothing.
1. Maximum Spacing: Tie fabric to line posts 12 inches (304 mm) on-center and to braces 24 inches (609 mm) on-center.
I. Fasteners: Install nuts for tension bands and carriage bolts on the side of the fence opposite the fabric side. Peen ends of bolts or score threads to prevent removal of nuts.
3.5 GATE INSTALLATION
A. General: Install gates according to manufacturer's written instructions, level, plumb, and secure for full opening without interference. Attach fabric as for fencing. Attach hardware using tamper-resistant or concealed means. Install ground-set items in concrete for anchorage.
Adjust hardware for smooth operation and lubricate where necessary.
3.6 ADJUSTING
A. Gate: Adjust gate to operate smoothly, easily, and quietly, free from binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range. Confirm that latches and locks engage accurately and securely without forcing or binding.
B. Lubricate hardware and other moving parts.
C. Replace damaged or malfunctioning operable components as directed by the Owner.
**END OF SECTION**