Bid Notice-Wavecrest Road Waterline Project.pdf
PDF 55 KB Posted
- Attached to
- Wavecrest Road Water Line Project
- Solicitation number
- Not on record
- Issued by
- San Mateo County, Hayward City, California
About this file
This is a Bid Notice document issued by the City of Half Moon Bay, California, for the Wavecrest Road Water Line Project. The project encompasses the abandonment of an existing 2-inch water main and installation of a new main connection on Wavecrest Road, along with installation of a new 8-inch water main, fire hydrants, service laterals, backflow preventers, water meters, pavement restoration, bollards, and minor concrete replacement. A mandatory pre-bid meeting is scheduled for Thursday, June 18, 2026, at 11:00 a.m. at Wavecrest Road near 1410 Cabrillo Highway South (Cameron's Pub) in Half Moon Bay, California. Bids will be accepted from June 18, 2026, at 11:00 a.m. through July 8, 2026, at 3:00 p.m. The City requires project completion prior to October 2, 2026, with a Notice to Proceed to be issued once all insurance, bonds, and critical submittals have been approved. Interested parties should contact Mike Burnfield at the City of Half Moon Bay at (650) 726-8265 or MBurnfield@halfmoonbay.gov for additional information.
The Engineer's Estimate for the Wavecrest Road Water Line Project is $1,790,000. Bidders may obtain project documentation in PDF format through the GovTribe platform by creating an account or logging in and selecting the download option, or may request physical prints through the order function.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wavecrest Road Water Line Project Engineer’s Estimate: $1,790,000 | In general, this project includes abandoning an existing 2” water main and installing a new main connection on Wavecrest Road, installation of a new 8” water main, fire hydrants, service laterals, backflow preventers, water meters, pavement restoration, bollards and minor concrete replacement. The City of Half Moon Bay is requesting for the project to be completed prior to October 2, 2026. A Notice to Proceed will be issued once all insurance, bonds, and critical submittals have been approved.
Status Accepting Bids
6/18/26 11:00am 7/8/26 3:00pm
Company & Contacts City of Half Moon Bay Mike Burnfield
(650) 726-8265 MBurnfield@halfmoonbay.gov
Mandatory Pre-Bid Meeting: Thursday, June 18, 2026, at 11:00am at Wavecrest Road, near 1410 Cabrillo Highway South (Cameron’s Pub), Half Moon Bay, CA
For PDF download purchases, please create an account or login, and select "Download".
For physical prints, please select "Order".
Prebid Date Bid Date mailto:MBurnfield@halfmoonbay.gov
File details come from the government source that posted it. Updated .