This document is an Addendum 1 to bid documents for the Wavecrest Road Waterline Project issued by Coastside County Water District (CCWD) in Half Moon Bay, California, dated June 25, 2026. The project scope includes abandoning an existing 2-inch water main and installing a new 8-inch water main with fire hydrants, service laterals, backflow preventers, water meters, pavement restoration, bollards, and minor concrete replacement on Wavecrest Road. The addendum clarifies pre-qualification requirements, stating that contractors need not be CCWD pre-qualified at bid submission but must submit a completed Statement of Pre-Qualification Package (SOPQ) if not previously pre-qualified. CCWD will review SOPQs in order of bid ranking, starting with the lowest apparent bid, and failure to obtain required pre-qualification may render a bidder ineligible for award. The addendum addresses 15 bidder questions regarding utility locations, pavement standards, construction staging (limited to Smith Field parking lot), road closure restrictions, equipment specifications, and project coordination details.

The SOPQ submittal package requires contractors to meet mandatory pre-qualification standards evaluated on a Pass/Fail basis for most criteria and point-based scoring (minimum 20 of 40 points required) for bonding capacity and project references. Contractors must hold a current California "A" or "C34" contractor license with active DIR registration, maintain general liability insurance of at least $2,000,000, automobile liability insurance of at least $1,000,000, and workers' compensation insurance of at least $1,000,000 per occurrence. Additional requirements include available bonding capacity, three years of financial records, five project references of similar scope completed within the past five years, an average Workers' Compensation Experience Modification Rate of 1.0 or lower, and an average Total Recordable Incident Rate of 3.0 or lower for the past three years. The District will notify applicants within 21 calendar days of receipt regarding pre-qualification status, and contractors have 10 business days to appeal unfavorable determinations.

View the file

Other files

File Type Posted
Bid Notice-Wavecrest Road Waterline Project.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 01 TO BID DOCUMENTS

JUNE 25, 2026

WAVECREST ROAD WATERLINE PROJECT

Addendum No. 1:

This Addendum shall be considered as part of the RFP documents for the subject project and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original documents, this Addendum shall govern and take precedence. Consultants are hereby notified that they shall make any necessary adjustments in their proposals on account of this Addendum.

The following is hereby added and/or amended:

The second paragraph on page 5 of the INSTRUCTIONS TO BIDDERS, has been revised to “Bidders are advised that CCWD pre-qualification is required prior to contract award (or prior to commencement of work on CCWD facilities, if approved by CCWD). A bidder need not be CCWD-pre-qualified at the time bids are submitted; however, bidders who have not been previously pre-qualified with CCWD prior to advertisement, must include a completed Statement of Pre- Qualification Package (SOPQ) with all listed requirements, as part of their bid submittal. The template SOPQ is attached to this addendum and hereby included in bid submittal requirements.

CCWD will review and process SOPQs, in order of bid ranking, and starting with the lowest apparent bid. Failure to obtain required pre-qualification with CCWD may render the bidder ineligible for award and the City may proceed to the next lowest responsive and responsible bidder.

RFP QUESTIONS/CLARIFICATIONS

Question 1: Do contractors need to be pre-qualified through CCWD before bidding?

Response 1: No, all contractors who are not currently pre-qualified with CCWD will need to submit a completed Statement of Pre-Qualifications with their bid package. Refer to Attachment 1 to this bid Addendum for the Statement of Pre-Qualification Submittal package.

Question 2: Do sub-contractors have to be pre-qualified through CCWD?

Response 2: Refer to the attached Statement of Pre-Qualification Submittal package for sub-contractor requirements related to pre-qualification.

Question 3: Is the existing waterline at the edge of asphalt on Wavecrest?

Response 3: The approximate location of the existing waterline on Wavecrest is shown in the bid plans, based on limited records and surface evidence. Contractor is responsible for positive location of all existing utilities where impacted by the proposed scope of work.

Question 4: Does the proposed waterline require a casing at the storm drain crossing?

Response 4: No. Refer to the project plans for crossing requirements. At storm drain crossings specifically, CCWD requires no pipe joints within 8 ft measured horizontally of the storm drain on either side of the crossing, as depicted in details in the project plans.

Question 5: Where will construction staging be allowed?

Response 5: The city expects all construction staging to take place withing the Smith Field gravel parking lot. Further coordination for construction staging will take place following contract award.

Question 6: Will the entirety of Wavecrest be repaved?

Response 6: No, only the extents indicated in plans delineated as Pavement Restoration area will be repaved, approximately from northern existing edge of pavement to roughly the centerline of street, in addition to service and hydrant laterals within existing paved areas. Refer to plans for precise limits.

Question 7: Which standards will the paving need to adhere to?

Response 7: Refer to plans and project specifications for pavement standards.

Question 8: What, if any, parts of Wavecrest is the City open to closing completely?

Response 8: For the purpose of bidding, contractor should assume that no full road closures are permitted on Wavecrest Road. The City may consider proposals for road closures during short periods of time or certain activities during construction, to be reviewed with the awarded bidder, on a case-by-case basis.

Question 9: Does the parking lot at Smith Field need to be paved?

Response 9: No, the parking lot shall be restored in-kind with Class II AB as shown on the bid plans.

Question 10: Is there a blow-off valve at the capped end of the new 8” waterline?

Response 10: No, there is a gate valve and hydrant at the end of the 8” waterline per the bid plans.

Question 11: Can the lot on the south side of Wavecrest right before the park be used for construction staging?

Response 11: No, all construction staging shall take place in the existing Smith Field parking lot.

Question 12: Who owns the electrical for the park lights?

Response 12: The City of Half Moon Bay owns the lights at Smith Field.

Question 13: Who is responsible for USA of the existing utilities?

Response 13: The contractor is responsible for locating all existing utilities in the project area.

Question 14: Are all activities on Smith Field during the weekends?

Response 14: No. Organized sports during the week include little league and recreational park and trail users. The current project schedule avoids the majority of organized league activities at Smith Field.

Question 15: Where are the two proposed water services located?

Response 15: The proposed 2” and 1” water services are located between the parking lot and the southeast field (Field 3) as shown on the bid plans.

COASTSIDE COUNTY

WATER DISTRICT

REQUEST FOR

STATEMENT OF PRE-QUALIFICATION

FOR

APPROVED CONTRACTORS LIST

July 2024

SUBMIT TO:

COASTSIDE COUNTY WATER DISTRICT

766 MAIN STREET

HALF MOON BAY, CA 94019

COASTSIDE COUNTY WATER DISTRICT

STATEMENT OF PRE-QUALIFICATIONS (SOPQ)

FOR APPROVED CONTRACTORS LIST

TABLE OF CONTENTS

Page

NOTICE

SCOPE OF WORK

INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF SOPQ PACKAGES 4

CONTRACTOR’S PRE-QUALIFICATION STATEMENT QUESTIONNAIRE…

Statement of Pre-Qualifications 3 Coastside County Water District

NOTICE

Notice is hereby given that Coastside County Water District (Coastside CWD or District) has determined that all contractors that install water mainline extensions, water services, or fire services connecting to the District’s water system (Projects) must be on the District’s Approved

Contractors List by pre-qualifying. It is mandatory that all Contractors who intend to perform this work for Coastside CWD applicants to install new water mainline extensions, water services, or fire service connections for new homes, commercial buildings, or remodels, fully complete the Statement of Pre-Qualification (“SOPQ”) Submittal Package, provide all materials requested herein, and be pre-qualified by the District to be on the Approved Contractors List.

No work will be allowed by a Contractor that has failed to comply with these requirements.

The SOPQ Submittal Package shall be submitted in sealed envelopes marked “Confidential – Do

Not Open with Regular Mail” and shall include the following title on the front of the package, “SOPQ for the Coastside CWD Approved Contractors List” Submittals will be received on a rolling basis, at the office of the Coastside County Water District located at 766 Main Street, Half

Moon Bay, California 94019. Submittals can be delivered by mail, FedEx, or other delivery service, or dropped off at the District’s office. If the Contractor elects to drop off their Submittal, the Contractor shall drop off between the hours of 8:00 am and 5:00 pm. The District will notify

Contractors within 21 calendar days after receipt date if the Contractor meets the District’s pre-qualification standards.

SCOPE OF WORK

Contractors with complete and qualifying SOPQs will be placed on the Coastside CWD

Approved Contractors List to perform water service installations. The SOPQ Submittal Package does not guarantee work, nor is it a qualification for performing other District projects. The

SOPQ Submittal Package is a request for information, not a cost proposal or bid, neither issuing this Notice, nor any other activity related to the pre-qualification process, commits or obligates the District to award contracts, to pay costs incurred in the preparation of a SOPQ Submittal

Package, or to procure or contract for any services. Contractors that meet the District’s pre-qualification standards will be added to the District’s Approved Contractors List and be allowed to perform work for Coastside CWD applicants intending to install new water and fire services.

Coastside CWD applicants who are building new homes, commercial structures, or remodeling and need to install new water service connections will be given this list as reference for obtaining cost estimates. The cost and contractual terms for service installation will be agreed upon by the contractor and the applicant. Coastside CWD will install the water meter and meter check for a cost to be invoiced directly to the applicant. For all water service installations or mainline work, the contractor is required to obtain encroachment permits for all work done on the public roadways prior to the start of the job. All work performed must follow the approved specifications and guidelines provided by Coastside CWD and be inspected and approved by a

Coast CWD inspector prior to backfilling.

Pre-qualification will remain valid for one (1) year after placement on the Approved Contractor

List, except that the District reserves the right during that period to adjust, increase, limit, suspend, or rescind the pre-qualification approval based on subsequently learned information.

The District may choose to extend pre-qualification to Contractors that have been approved without the need to resubmit the SOPQ Package. At the request of the District, in lieu of

Statement of Pre-Qualifications 4 Coastside County Water District resubmitting the SOPQ Package, the Contractor shall submit a statement, signed by an authorized signatory, confirming the information in the SOPQ Package remains accurate. The Contractor accepts all risks and costs associated with the completion of the SOPQ Package without financial guarantee.

INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF SOPQ PACKAGE

1. QUESTIONS AND COMMENTS

Any questions, comments, or objections to the pre-qualification materials, or explanation desired by a Contractor regarding the meaning or interpretation of the Pre-Qualification

Submittal Package and related materials shall be made by E-mail and directed to:

Gina Brazil

Office Manager

Phone: (650) 726-4405

E-mail: gbrazil@coastsidewater.org

It is the Contractor’s sole responsibility to ensure that the E-mail is received in a timely manner. Upon receipt of an E-mail, the District shall provide acknowledgment of receipt within two (2) business days. If the Contractor does not receive an acknowledgment of receipt of an E-mail from the District within the above-referenced timeframe, the Contractor shall assume the E-mail transmission was not received by the District and shall be responsible for resubmitting the same question in a timely manner, and if necessary by an alternate allowable method of transmission allowing for confirmation of receipt (e.g., mail, FedEx, or other delivery service, or dropped off at the District’s office following the same procedures as the SOPQ Submittal Package).

2. WITHDRAWAL OF SUBMITTAL

A SOPQ Package submittal may be withdrawn by a Contractor, at any time prior to the

District’s determining the final list of qualified Contractors, by E-mail request to:

Gina Brazil

Office Manager

Phone: (650) 726-4405

E-mail: gbrazil@coastsidewater.org

3. SOPQ SUBMITTAL PACKAGE

The answers to questions contained in the attached pre-qualification questionnaire, information about current bonding capacity, and project references will be used by the

District to Pre-qualify Contractors with respect to their qualifications to bid on Projects. The

District reserves the right to check other sources available and to interview the Contractor and designated Project Manager. The District’s decision will be based on objective evaluation criteria.

The District reserves the right to adjust, increase, limit, suspend, or rescind the pre-

Statement of Pre-Qualifications 5 Coastside County Water District qualification rating based on subsequently learned information. Contractors whose rating changes sufficiently to disqualify them will be notified and given an opportunity for a hearing consistent with the procedures described below for appealing a pre-qualification rating.

As provided in California Public Contract Code Section 20101, SOPQ Packages

(questionnaire answers and other attachments) submitted by Contractors are not public records and are not open to public inspection. All information provided will be kept confidential to the extent permitted by law. However, the contents may be disclosed to third parties for the purpose of verification, investigation of substantial allegations, or in an appeal hearing if one is required to solve a dispute. State law requires that the names of Contractors applying for pre-qualification status shall be public records subject to disclosure, and the first page of the pre-qualification questionnaire will be used for that purpose and is a public record document.

The Contractor shall provide only complete and accurate information in their SOPQ

Packages. Each pre-qualification questionnaire must be signed under penalty of perjury in the manner designated at the end of the form, by an individual who has the legal authority to bind the Contractor on whose behalf that person is signing. If any information provided by a Contractor becomes inaccurate, the Contractor must immediately notify the District and provide updated accurate information in writing, under penalty of perjury. Should a

Contractor omit or falsify requested information, the District may designate the Contractor as not pre-qualified. False or inaccurate information provided by the Contractor may result in disqualification from this SOPQ and from bidding on future District projects. No SOPQ

Package will be accepted from a Contractor that has failed to comply with these requirements. The District reserves the right to waive minor irregularities and omissions in the information contained in the pre-qualification application submitted and to make all final determinations. It is mandatory that all Contractors who desire to be on the Approved

Contractors List fully complete the pre-qualification questionnaire, provide all materials requested herein, and be approved by the District. The District also reserves the right to cancel this Notice or to reject any and all SOPQ.

Incomplete or unsigned SOPQ Submittal Packages will be returned without review and the

Contractor will not be eligible to participate in the Projects until completed properly.

4. EVALUATION CRITERIA

The District will evaluate all complete SOPQ Submittal Packages by a combination of points scored for Items 7 and 10 (references), and on a Pass/Fail basis for all other items

(item 10 questions other than references). In order to pre-qualify for the Projects, Prospective Contractors must obtain a score of at least 20 points out of a possible 40 points and “Pass” rating on all other Items (10 questions other than references). Contractors who do not obtain a “Pass” rating for all of the criteria will not meet the District pre-qualification standards and will not be allowed on the District’s Approved Contractor List.

5. CONTRACTOR APPEAL PROCEDURE

As provided in California Public Contract Code Section 20101, where a timely and

Statement of Pre-Qualifications 6 Coastside County Water District completed SOPQ Submittal Package results in a rating below that necessary to pre-qualify, the Contractor may appeal that determination. A Contractor may not appeal from a finding that the Contractor was not pre-qualified due to failure to submit all required information.

An appeal is begun by the Contractor delivering notice to the District of its appeal of the decision with respect to its pre-qualification rating, no later than ten (10) business days after being notified of the District’s decision. Without a timely appeal, the Contractor waives any and all rights to challenge the decision of the District, whether by administrative process, judicial process, or any other legal process or proceeding.

If the Contractor gives the required notice of appeal and requests a hearing, the hearing shall be conducted so that it is concluded no later than ten (10) business days after the District’s receipt of the notice of appeal. The hearing shall be an informal process conducted by a panel to which the District has delegated responsibility to hear such appeals (the “Appeals Panel”).

At the hearing, the Contractor will be presented their score sheet and advised of the basis for the District’s pre-qualification determination. The Contractor will be given the opportunity to present information and reasons in opposition to the rating to the extent they have been identified in their notice of appeal. Within five (5) business days after the conclusion of the hearing, the Appeals Panel will render its decision, and the Contractor will be given written notice of the decision, which shall be final and binding. The deadline for submission and opening of bids for specific Projects will not be delayed or postponed to allow for the completion of an appeals process.

The SOPQ Submittal Package, its completion and submission by the Contractor, and its use by the District shall not give rise to any liability on the part of the District to the Contractor or any third party.

By my signature below, I acknowledge receipt of this document, agree to be bound by its terms, and agree to submit it as part of the SOPQ Submittal Package to the District.

Firm Name (as it appears on CSLB license)

Contact Person Signature

Contact Person Name

Contact Person Title

Date

Statement of Pre-Qualifications 7 Coastside County Water District

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE

All Questions Must Be Answered

Scoring Listed in Parenthesis for Each Question

1. FIRM INFORMATION (PASS/FAIL)

Firm Name (as appears on

CSLB license):

Local Address:

Years Firm has Been in Business in California

(under present business name and license number):

2. TYPE OF WORK (PASS/FAIL)

Description:

3. CONTRACTOR’S CONTACT INFORMATION (PASS/FAIL)

Contact Person:

Title:

Phone No: Email:

4. AFFILIATED COMPANIES (PASS/FAIL)

Name:

Address:

Statement of Pre-Qualifications 8 Coastside County Water District

5. TYPE OF ORGANIZATION (PASS/FAIL)

□ Sole Proprietorship

Name of Owner:

Doing Business As:

Date of Organization:

□ Partnership

Type of Partnership:

Name of General Partner(s):

□ Corporation

State of Organization:

Date of Organization:

Executive Officers:

President:

Vice President(s):

Treasurer:

Secretary:

□ Limited Liability

Company

State of Organization:

Members:

□ Joint Venture

State of Organization:

Date of Organization:

Form of Organization:

JV Managing Partner:

Statement of Pre-Qualifications 9 Coastside County Water District

Address:

JV Managing Partner:

Address:

6. LICENSING AND DIR NUMBER (PASS/FAIL – California Contractor’s “A” or “C34”

License and Active DIR Registration Required)

Jurisdiction:

Type of License: License No:

DIR Number:

Expiration Date:

Has the Contractor submitted a copy of their contractor’s business license for work in Half Moon Bay/County of San Mateo

7. BONDING INFORMATION (10 points for available bonding capacity > $1,000,000;

5 points for $1,000,000 > available bonding capacity > $500,000)

Bonding/Surety Company:

Address:

Name of Bonding Agent:

Agent Address (if different):

Phone No:

Aggregate Bonding

Capacity:

Available Bonding Capacity as of Date of this Submittal:

Has the firm been required to pay a premium of more than one percent (1%) for a performance and payment bond on any project(s) on which the firm worked on in the past three (3) years.

State the percentage and you may provide an explanation as an attachment if you wish:

Yes No

Statement of Pre-Qualifications 10 Coastside County Water District

List all other bonding/surety companies that have written bonds for your firm during the last five (5) years, including the dates on which they were issued:

Name Address Date

8. FINANCIAL INFORMATION (Pass/Fail)

Financial Institution:

Address:

Account Manager: Phone No:

Firms Gross Revenue for the

Past Three Fiscal Years:

Current Year:

Previous Year:

Year Prior to Previous Year:

9. CONTRACTOR’S LIABILITY INSURANCE (Pass/Fail) Circle Answer

a. General Liability Insurance (at least $2,000,000)

b. Automobile Liability Insurance (at least $1,000,000)

c. Worker’s Compensation Insurance (least $1,000,000 per occurrence)

□ Include as an attachment a Certificate of Insurance that complies with the Coastside CWD’s insurance requirements (Attachment A)

Yes No

Statement of Pre-Qualifications 11 Coastside County Water District

10. CONSTRUCTION EXPERIENCE (10 points for each “Good Reference”; 5 points for each

“Average Reference”; 0 points for any reference less than an “Average Reference”)

Current Experience:

List on the following Project Reference Form five (5) projects that are of similar scope to the SOPQ Projects (i.e., service connections by tapping pressure water mains, including one of a main 16-inches in diameter or greater) that you have performed in the last five (5) years.

Bidder authorizes representative to verify any and all information contained in the Qualification Statement from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they give.

District may disqualify any contractor that answers yes to the following questions

(PASS/FAIL)

Has the firm listed in Section 1 ever failed to complete a construction contract awarded to it?

□ Yes (If yes, attach as an Attachment details, including Project Owner’s contact information.)

□ No

Has any Corporate Officer, Partner, Joint Venture participant, or Proprietor ever failed to complete a construction contract awarded to them in their name or when acting as a principal of another entity?

□ Yes (If yes, attach as an Attachment details, including Project Owner’s contact information.)

□ No

Are there any judgments, claims, disputes, or litigation pending or outstanding involving the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture)?

□ Yes (If yes, attach as an Attachment details, including Project Owner’s contact information.)

□ No

11. SAFETY PROGRAM (Pass/Fail)

Name of Contractor’s Safety

Officer:

Include the following as attachments Contractor’s:

□ OSHA No. 300 – Log of Work-Related Injuries and Illnesses for the past three (3) years.

□ List of all OSHA Citations & Notifications of Penalty (monetary or other) received within the last three (3) years (indicate disposition as applicable). – IF NONE SO

STATE.

□ List of all safety citations or violations under any state received within the last three (3) years (indicate disposition as applicable). – IF NONE SO STATE.

Statement of Pre-Qualifications 12 Coastside County Water District

Provide for the firm listed in Section 1 the following:

Must have an Average Workers’ compensation Experience Modification Rate (EMR) for the last three (3) years of 1 or lower to be considered a responsive bidder:

Year: EMR:

Year: EMR:

Year: EMR:

Must have an Average Total Recordable Incident Rate (TRIR) for the last three (3) years of 3.0 or lower to be considered a responsive bidder.:

Year: TRIR:

Year: TRIR:

Year: TRIR:

I HEREBY CERTIFY THAT THE INFORMATION SUBMITTED HEREWITH,

INCLUDING ANY ATTACHMENTS, IS TRUE TO THE BEST OF MY

KNOWLEDGE AND BELIEF AND I AM AUTHORIZED BY

(NAME OF FIRM) TO MAKE THIS STATEMENT.

Name of Organization:

By:

Title:

Dated:

Statement of Pre-Qualifications 13 Coastside County Water District

PROJECT REFERENCE FORM #1 of 5

List five (5) projects that are of similar scope (open trench potable water pipeline construction, service connections by tapping pressure water mains 16-inches or greater) to this project completed within the last five (5) years. Provide the information indicated below. Names and references must be current and verifiable. Use separate sheets of paper for each of the five (5) projects:

6 points “Good Reference”; “3 points Average Reference”; 0 points anything less than a “Average Reference.”

Project Name:

Location:

Owner:

Contractor On-Site Superintendent:

Original Contract/Subcontract Cost:

Total Contract Amount Including Change Orders:

Original Construction Duration in Weeks:

Total Construction Duration in Weeks Including Extensions:

Date of Substantial Completion:

Short Project Description:

Owner Contact (name and current phone number):

Engineer Contact, if applicable (name and current phone number):

Construction Manager, if applicable (name and current phone number):

Statement of Pre-Qualifications 14 Coastside County Water District

PROJECT REFERENCE FORM #2 of 5 completed within the last five (5) years. Provide the information indicated below. Names and

Statement of Pre-Qualifications 15 Coastside County Water District

PROJECT REFERENCE FORM #3 of 5 completed within the last five (5) years. Provide the information indicated below. Names and

Statement of Pre-Qualifications 16 Coastside County Water District

PROJECT REFERENCE FORM #4 of 5 completed within the last five (5) years. Provide the information indicated below. Names and

Statement of Pre-Qualifications 17 Coastside County Water District

PROJECT REFERENCE FORM #5 of 5 completed within the last five (5) years. Provide the information indicated below. Names and

Statement of Pre-Qualifications 18 Coastside County Water District

ATTACHMENT A

Coastside CWD Insurance Requirements

Indemnification Language – To the extent permitted by law, Contractor shall defend, indemnify and hold harmless Coastside County Water District, its directors, officers, employees, and authorized volunteers from and against all claims, damages, losses and expenses, including reasonable attorneys’ fees and costs to defend arising out of the performance of the work described herein, and caused in whole or in part by any negligent act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the Coastside County Water District, its directors, officers, employees, and authorized volunteers.

Minimum Scope and Limits of Insurance: Contractor shall procure and maintain for the duration of the contract, and for 5 years thereafter, insurance against claims for injuries or death to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.

Coverage - Coverage shall be at least as broad as the following:

1. General Liability - Commercial General Liability (CGL) - Insurance Services Office (ISO) Commercial General Liability Coverage (Occurrence Form CG 00 01) including products and completed operations, property damage, bodily injury, personal and advertising injury with limit of at least two million dollars ($2,000,000) per occurrence or the full per occurrence limits of the policies available, whichever is greater. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (coverage as broad as the ISO CG 25 03, or ISO CG 25 04 endorsement provided to Coastside County Water District) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability - Insurance Services Office (ISO) Business Auto Coverage (Form CA 00 01), covering Symbol 1 (any auto) with limit of one million dollars ($1,000,000) for bodily injury and property damage each accident.

3. Workers' Compensation Insurance - The Contractor shall provide workers’ compensation coverage as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. Waiver of Subrogation (also known as Transfer of Rights of Recovery Against Others to Us): The Contractor hereby agrees to waive rights of subrogation to obtain endorsement necessary to affect this waiver of subrogation in favor of the Coastside County Water District, its directors, officers, employees, and authorized volunteers, for losses paid under the terms of this coverage which arise from work performed by the Named Insured for the Coastside County Water District; this provision applies regardless of whether or not the Coastside County Water District has received a waiver of subrogation from the insurer.

4. Builder’s Risk - (Course of Construction) if necessary- insurance utilizing an “All Risk” (Special Perils) coverage form with limits equal to the completed value of the project and no coinsurance penalty provision. See Responsibility of Work

Statement of Pre-Qualifications 19 Coastside County Water District

5. Contractor’s Pollution Liability - (optional: if project involves environmental hazards) with limits no less than $5,000,000 per occurrence or claim, and $10,000,000 policy aggregate.

If the Contractor maintains broader coverage and or/higher limits than the minimums shown above, the Coastside County Water District requires and shall be entitled to the broader coverage and/or higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum of insurance and coverage shall be available to the Coastside County Water District)

Other Required Provisions – The Commercial General Liability policy and Contractors Pollution (if necessary) are to contain, or be endorsed to contain, the following provisions:

1. Additional Insured Status: Coastside County Water District, its directors, officers, employees, and authorized volunteers are to be given insured status (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10 10 01 and CG 20 37 10 01, with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance.

2. Primary Coverage: For any claims related to this project, the Contractor’s insurance coverage shall be primary at least as broad as ISO CG 20 01 04 13 with respect to the Coastside County Water District, its directors, officers, employees, and authorized volunteers. Any insurance or self-insurance maintained by the Coastside County Water District, its directors, officers, employees, and authorized volunteers shall be excess of the Contractor’s insurance and shall not contribute to it.

Notice of Cancellation: Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the Coastside County Water District.

Acceptability of Insurers - Insurance is to be placed with insurers having a current A.M. Best rating of no less than A: VII or equivalent or as otherwise approved by Coastside County Water District.

The Contractor agrees and he/she will comply with such provisions before commencing work. All of the insurance shall be provided on policy forms and through companies satisfactory to Coastside County Water District. The Coastside County Water District reserves the right to obtain complete, certified copies of all required insurance policies, including the policy declarations page with endorsement number. Failure to continually satisfy the Insurance requirements is a material breach of contract.

Responsibility for Work - Until the completion and final acceptance by Coastside County Water District of all the work under and implied by this agreement, the work shall be under the Contractor’s responsible care and charge. The Contractor shall rebuild, repair, restore, and make good all injuries, damages, re-erections, and repairs occasioned or rendered necessary by causes of any nature whatsoever.

The Contractor shall provide and maintain builder’s risk (course of construction) or an installation floater (for materials and equipment) covering all risks of direct physical loss, damage, or destruction to the work in the amount specified in the General Conditions, to insure against such losses until final acceptance of the work by Coastside County Water District. Such insurance shall insure at least

Statement of Pre-Qualifications 20 Coastside County Water District against the perils of fire and extended coverage, theft, vandalism and malicious mischief, and collapse.

The Policy shall be endorsed with Coastside County Water District, its directors, officers, employees, and authorized volunteers named as loss payee, as their interest may appear. The making of progress payments to the Contractor shall not be construed as creating an insurable interest by or for Coastside County Water District or be construed as relieving the Contractor or his/her subcontractors of responsibility for loss from any direct physical loss, damage, or destruction occurring prior to final acceptance of the work by Coastside County Water District.

Deductibles and Self-Insured Retentions - Insurance deductibles or self-insured retentions must be declared by the Contractor and approved by the Coastside County Water District. At the election of Coastside County Water District the Contractor shall either cause the insurer to reduce or eliminate such self-insured retentions with respect to Coastside County Water District, its directors, officers, employees, and authorized volunteers or the Contractor shall provide a financial guarantee satisfactory to the Coastside County Water District guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or the Coastside County Water District.

Verification of Coverage - Evidence of Insurance Contractor shall furnish the Coastside County Water District with copies of certificates and amendatory endorsements affecting coverage required by this contract. All certificates and endorsements are to be received and approved by the Coastside County Water District before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The Coastside County Water District reserves the right to require complete, certified copies of all required insurance policies, including policy Declaration pages and Endorsement pages, required by these specifications, at any time. Failure to continually satisfy the Insurance requirements is a material breach of contract.

Continuation of Coverage - The Contractor shall, on demand of Coastside County Water District deliver evidence of coverage showing continuation of coverage for at least (5) years after completion of the project. Contractor further waives all rights of subrogation under this agreement When any of the required coverages expire during the term of this agreement, the Contractor shall deliver the renewal certificate(s) including the general liability additional insured endorsement and evidence of waiver of rights of subrogation against Coastside County Water District (if builder’s risk insurance is applicable) to Coastside County Water District at least ten (10) days prior to the expiration date.

Sub-Contractors - In the event that the Contractor employs other Contractors (sub-contractors) as part of the work covered by this agreement, it shall be the Contractor’s responsibility to require and confirm that each sub-contractor meets the minimum insurance requirements specified above (via as broad as ISO CG 20 38 04 13). The Contractor shall, upon demand of Coastside County Water District, deliver to Coastside County Water District copies of such policy or policies of insurance and the receipts for payment of premiums thereon.