This is a bid notice from the Kansas Department of Transportation (KDOT) for Portland Cement Concrete Pavement (PCCP) patching work on Interstate 70 in Dickinson County. The project involves patching along an 8.734-mile segment of I-70 from the Saline/Dickinson County line to 0.4 miles west of the I-70/K-15 junction in Dickinson County. The project is tied to contract KA 8158-01 and has a proposal number of 526106242 with a letting date of October 21, 2026. The contract requires completion of work to open the project to unrestricted traffic within 125 restricted working days and total contract completion within 155 working days, with an earliest start date of April 12, 2027. Only prequalified contractors may submit electronic proposals through the Bid Express website (Bidx.com), with proposals due by 1:00 p.m. local time on the letting date. KDOT will open and read proposals at 3:00 p.m. local time on October 21, 2026, at the Eisenhower State Office Building in Topeka, Kansas, with a conference call available at 785-414-8630 (conference ID 856 616 050#).
The project includes work items such as PCCP joint and crack patching (925 square yards at partial depth), PCCP full-depth patching of 13-inch sound concrete (579 square yards), saw cuts (1 linear foot at $4.50 set price), and concrete pavement placement (80 square yards of 13-inch uniform air-entrained concrete with bridge approach). Bid holders must notify KDOT of their intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project is funded entirely by state funds and requires contractors to obtain a current Tax Clearance Certificate from the Kansas Department of Revenue before contract award. Contractors must execute the contract within ten business days of award notification. The bid notice incorporates standard KDOT specifications, special provisions covering traffic control, environmental concerns including the Migratory Bird Treaty Act, pavement patching specifications, material certifications, and various required contract provisions related to noncollusion, financial prequalification, EEO requirements, and prohibition on boycotts of Israel.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745
Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org
Bureau of Construction and Materials
STATE PROJECT NUMBER: I070-021 KA 8159-01
CALL ORDER NUMBER: 624
PROPOSAL NUMBER: 526106242
LETTING DATE 10/21/2026
COUNTY: DICKINSON
FUND TYPE: STATE
JUNCTION CITYKDOT CONSTRUCTION OFFICE:
PROJECT DESCRIPTION
PCCP PATCHING. I-70; FR SA/DK CL TO 0.4 MI W I70/K15 JCT IN DK
CO. LGTH 8.734 MI. TIED TO KA 8158-01.
RESTRICTED DAYS
(125)
TOTAL CONTRACT DAYS
(155)
TIED TO: 526106232 KA 8158-01
APRIL 12, 2027
Earliest Start Date:
Latest Start Date:
1:11:00PM9/16/2026 @
Letting 10/21/2026 Kansas Department of Transportation Project No. I070-021 KA 8159-01
Contract No. 526106242
I070-021 KA 8159-01 I070-021 KA 8159-01
CONTRACT PROPOSAL
DOT Form No. 202 Rev. 02/19
Contract ID: 526106242
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:
I070-021 KA 8159-01 / I070-021 KA 8159-01
The general scope, location and net length are:
PCCP PATCHING. I-70; FR SA/DK CL TO 0.4 MI W I70/K15 JCT
IN DK CO. LGTH 8.734 MI. TIED TO KA 8158-01.
2. This is the Proposal of [Contractor] to complete the Project for the amount set out in the accompanying
Unit Prices List.
3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:
4. Contractors and other interested entities may examine the Bidding Proposal Form/Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the
Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office
Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal
Form/Contract Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal
Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above. Contractors shall furnish this notice no later than 5:00 P.M. on the
Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".
5.Contractors shall use the Bidx.com website to complete and submit the bid form. Project bid forms are available on Bid Express' website at http://www.bidx.com.
6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website.
7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using
Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the
Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the
Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.
8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.
9. The contractor shall complete work to open the project to unrestricted traffic within _125_ Restricted
Days and shall complete the work within the total Contract Working Days of _155_.
Contractor: Check: Page 1
10. The Contractor shall complete the Project according to the plans, Standard Specifications, provisions identified in the Special Provision List and all other Contract Documents identified in Standard
Specifications subsection 101.3
11. The undersigned declares that the Contractor has carefully examined the Bidding Proposal Form for the
Project. The Contractor understands the following:
A. The Bidding Proposal Form consists of the following documents: the Bidx bid form on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid
Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).
B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.
C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the Bidx bid form, electronically signs the Proposal where required on DOT Form 202, and submits the completed Bidx bid form documents and bid bond to KDOT using Bid Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the Contractor's Proposal.
D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.
12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.
13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions (I-XVII) require the
Contractor to furnish information. The current versions of these provisions are contained in the Bidx bid form. Some or all of these apply to the Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the Bidx bid form file. When these documents are required, the
Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the Bidx bid form.
I. 08-10-66 Certification-Noncollusion & History of Debarment
II. 04-30-82 Certification-Financial Prequalification Amount
III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying
IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm
V. 10-10-00 Price Adjustment for Fuel
VI. 06-01-06 Price Adjustment for Asphalt
VII. 08-31-09 Price Adjustment for Emulsified Asphalt
VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost
IX. 05-18-07 Repair (Structures) Unit Cost
X. 11-15-17 Electric Lighting System Unit Cost
XI. 04-06-09 ITS Unit Cost
XII. 08-17-16 Water System Unit Cost
XIII. 06-19-19 Sanitary Sewer System Unit Cost
XIV. 01-01-18 Smart Work Zone System Unit Cost
XV. 08-12-24 CORS Unit Cost
XVI. 04-06-26 Federal Restrictions on Foreign Drones
XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate
Contractor: Check: Page 2
14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.
15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.
I. 11-03-80 Affirmative Action For EEO
II. 11-15-96 Affirmative Action & EEO Policies
III. 09-06-94 U.S. DOT Fraud Hotline
IV. FHWA-1273 Federal-Aid Required Contract Provisions
16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.
17. SIGNATURE SECTION:
A. Electronic Internet Proposal
The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this
Proposal and binds the named individual to the certification in paragraph B.
B. Certification
I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING THIS PROPOSAL. I
CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT LIMITED TO THE INFORMATION CONTAINED
IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH 13) IS TRUE AND CORRECT.
EXECUTED ON
C. Signature
Number of company or joint venture:
Name of company or joint venture:
Name of person signing:
Title of the person signing:
Signature: Electronic Internet Proposal
RELEASED FOR CONSTRUCTION:
Date:____________________________________
Chief of Construction and Materials
Contractor: Check: Page 3
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
09/09/26
STATE PROJECT NO: I070-021 KA 8159-01 STATE CONTRACT NO: 526106242
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: DICKINSON2
PCCP PATCHING. I-70; FR SA/DK CL TO 0.4 MI W I70/K15 JCT IN DK CO. LGTH
8.734 MI. TIED TO KA 8158-01.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05
REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07
REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03
REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06
REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1
MINIMUM WAGE RATE (DICKINSON COUNTY)KS20260079
REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01
POLICY AGAINST SEXUAL HARASSMENT03-01-18
ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23
REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003
WORKING DAYS AND LIQUIDATED DAMAGES15-01006-R02
ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06
PROSECUTION AND PROGRESS15-01016-R04
CONTROL OF WORK15-01019-R02
BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03
SCOPE OF WORK15-01022-R04
BIDDING REQUIREMENTS AND CONDITIONS15-01023
AWARD AND EXECUTION OF CONTRACT15-01024
ON GRADE CONCRETE15-04003
GENERAL CONCRETE15-04005-R04
PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA)15-05002-R01
WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04
PAVEMENT PATCHING15-08016
WORK ZONE TRAFFIC CONTROL & SAFETY15-08019-R04
WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029
STORMWATER POLLUTION MANAGEMENT15-09002-R05
AGGREGATE FOR ON GRADE15-11004-R03
AIR-ENTRAINING ADMIXTURES FOR CONCRETE15-14001-R01
SHEET MATERIALS FOR CURING CONCRETE15-14002
LIQUID MEMBRANE FORMING COMPOUNDS15-14003
HOT JOINT SEALING COMPOUND15-15001-R01
COLD APPLIED CHEMICALLY CURED JOINT SEALANT15-15004
BACKER ROD15-15005
MEMBRANE SEALANT15-15007
STEEL SIGN POSTS15-16002-R03
SPECIAL PROVISION LIST
PAGE:
DATE:
09/09/26
STATE PROJECT NO: I070-021 KA 8159-01 STATE CONTRACT NO: 526106242
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: DICKINSON2
PCCP PATCHING. I-70; FR SA/DK CL TO 0.4 MI W I70/K15 JCT IN DK CO. LGTH
8.734 MI. TIED TO KA 8158-01.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
STEEL WIRE & WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT15-16003-R01
PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT15-20001-R02
HYDRATED LIME15-20002
FLYASH FOR USE IN CONCRETE15-20004-R01
SILICA FUME15-20005
IMAGE SYSTEMS15-22005-R03
RETROREFLECTIVE SHEETING15-22006-R01
ROLL-UP SIGNS15-22011
WOOD POSTS15-23001-R03
FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02
PART V15-25001-R07
MATERIALS CERTIFICATIONS15-26001-R13
COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS15-PS0018
END OF SPECIAL PROVISION LIST
REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)
CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT
K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322
Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's
Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
NONCOLLUSION
I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.
HISTORY OF DEBARMENT
I certify that, except as noted below, the Contractor submitting this bid and any person associated with this
Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:
1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;
2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;
3. Do not have a proposed debarment pending;
4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, antitrust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.
Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.
◯ Yes ◯ No
The exceptions, if any, are:
Contractor: Check: Page 4
REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)
CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT
Select the appropriate response below to indicate whether this Proposal exceeds the Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form
202) supplies the necessary signature for this Certificate.
I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.
I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas
Department of Transportation plus the unearned amount of all other contracts in this state or other states
◯ exceeds ◯ does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.
If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).
KDOT Approval Granted by:
KDOT Approval Date:
Contractor: Check: Page 5
REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)
CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT
LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM
Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT
Form 202) supplies the necessary signature for this Certificate.
Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:
This Contract ◯ is ◯ is not with a legislator or a firm in which a legislator is a member. That Legislator is:
Name:
Address:
City State Zip:
Business Telephone:
Contractor: Check: Page 6
REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)
TAX CLEARANCE CERTIFICATE
Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.
◯ Yes ◯ No
Insert the Tax Clearance Confirmation Number if available at the time of bidding:
Contractors shall have a current Tax Clearance Certificate from the Kansas Department of Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the
Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The
Secretary will reject the Contractor's Proposal as non-responsive if the Contractor does not have a current
Tax Clearance Certificate at the time of the contract award.
To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for
Tax Clearance obtained from KDOR's website at http://www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.
After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required
Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the
Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the
Certificate submitted.
If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's
Application for Tax Clearance, the Contractor shall call KDOR's Special Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.
Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax
Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax
Clearance Certificate is not "clearance" for all types of taxes the State of Kansas may assess.
Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT Field Office the Subcontractor's Tax
Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.
Contractor: Check: Page 7
Line Number Item Number Quantity Unit Unit Price Extension Price
Section 01
COMMON ITEMS
1 025323 1.000 LS
MOBILIZATION /
2 025324 1.000 LS
TRAFFIC CONTROL /
3 070580 1.000 HOUR $30.000 $30.00
FLAGGER (SET PRICE) /
Section 01 Total 30.00
Section 02
PAVEMENT PATCHING (CONCRETE)
4 013302 925.000 SQYD
PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH) /
5 013676 579.000 SQYD
PCCP PATCHING (FULL DEPTH) (13") (SOUND) /
6 037209 1.000 LNFT $4.500 $4.50
EXTRA WORK SAW CUTS (SET PRICE) /
7 013764 80.000 SQYD
CONCRETE PAVEMENT (13" UNIFORM) (AE) (BR APP) /
Section 02 Total 4.50
Item Total $34.50
Contractor: Check: Page 8
�� ������������������������������������������������������������������������������,��-����.�������������������������������������������������������������������/����������������������0���$��+12,/�,34-+),� �1+,/5 1/�� /-66�/-���5-��1��777777778�9�7�9��������������������7��................................................................�-/1�����.�����:�������������������������������������������������������������/����������������������0���$��-/1�21/�,/;�� /4� 4/567777777777777777777777777777778�9�7��������������������9:7��................................................................��4������.�������������������������������������������������������������������/����������������������0���$�� /4��� /-<,/��100�/15 � /4��7777777777777777777777778���79��������������������7�� /4��� /-<,/��065 =, �5� �612=1>777777777777777777778���7���������������������7�� /4��� /-<,/�� 4)+�5� � 5� ,)777777777777777777777778���7���������������������7�� /4��� /-<,/���25 ,/� /4��777777777777777777777777778���7���������������������7�� /4��� /-<,/���+-��4+� /4��77777777777777777777777778���7���������������������7�� /500-���1� /16�����,/<-�,� /-<,/77777777777777777778��:7���������������������7���,/<-�,)5���,34-+),� 77777777777777777777777777777778���799�������������������7�:1+,/5 1/��� /-+-���)5�#-�,777777777777777777777777778���7�9������������������:7:�1+,/5 1/��/1 1�)-66��/14� )5�777777777777777777777778���79��������������������7��1+,/5 1/��/1 1�)-667777777777777777777777777777777778���7���������������������7��1+,/5 1/��� /5� 1/77777777777777777777777777777777778���7�:�������������������7��1+,/5 1/�����/,, 777777777777777777777777777777777778���7���������������������7��1+,/5 1/�����/5+,/77777777777777777777777777777777778���7���������������������7��1+,/5 1/���/166,/777777777777777777777777777777777778��:7���������������������7��1+,/5 1/���+5<,/��?5�+#56 ;�5��/,�5 ,;�5� ��1��/, ,@77777777777777777777777777777777777777777778���7���������������������7��1+,/5 1/���),�#5�-�7777777777777777777777777777777778���7���������������������7��1+,/5 1/���)5 ,/-56� /5��0,/�<,#-�6,77777777777777778��97���������������������7��1+,/5 1/���615 ,/777777777777777777777777777777777778���7���������������������7��1+,/5 1/����/5 ,/�=65 ,777777777777777777777777777778���7���������������������7��1+,/5 1/��� -� /-=4 1/7777777777777777777777777777778���7���������������������7��1+,/5 1/����/5�,7777777777777777777777777777777777778���7���������������������7��1+,/5 1/����1��/, ,��52777777777777777777777777777778���7���������������������7��1+,/5 1/����1��/, ,�0-�-�#-���)5�#-�,7777777777777778���7���������������������7��1+,/5 1/���=466 1A,/777777777777777777777777777777778���7���������������������79�1+,/5 1/���=/11)��2,,+,/77777777777777777777777777778��:7���������������������7��1+,/5 1/���=1=�5 ���- �� ,,/���- �615 ,/7777777777778���7:9�������������������7��1+,/5 1/���=5��#1,�,B�5<5 1/� /5��#1,7777777777777778���7���������������������7��1+,/5 1/���5�+#56 �+65� 77777777777777777777777777778��:7���������������������7��
CDEDFCG�EHFC�IJ KIJLMNO
PQQRSHDDSTULMNODVTMWXYWQWZU[\TQ[N\D]KF̂FĈ _̂̀Da aDb
��"�����������������������&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&!�������&��'(')*'�+,-'�.+'/(+)0'1�23+�(+,2-�.'+23+4)563.'+,-)35�-3�78)(8�7'91)56�)/�)5()1'5-,9�::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::�3-'���;'(<-)*'��+1'+�=��>� ��$���/-,09)/8)56��,)1��)(?��',*'23+� '1'+,9��35-+,(-3+/�,..9)'/�-3�,99�(35-+,(-/�/<0@'(-�-3�-8'�,*)/&�,(35��(-�23+�78)(8�-8'�(35-+,(-�)/�,7,+1'1�=,51�,5A/39)()-,-)35�7,/�)//<'1>�35�3+�,2-'+�B,5<,+A� �����2�-8)/(35-+,(-�)/�(3*'+'1�0A�-8'�����-8'�(35-+,(-3+�4</-�.+3*)1''4.93A''/�7)-8� �83<+�32�.,)1�/)(?�9',*'�23+�'*'+A� ��83<+/-8'A�73+?��<.�-3��$�83<+/�32�.,)1�/)(?�9',*'�',(8�A',+��4.93A''/�4</-�0'�.'+4)--'1�-3�</'�.,)1�/)(?�9',*'�23+�-8')+375�)995'//��)5@<+A�3+�3-8'+�8',9-8&+'9,-'1�5''1/��)5(9<1)56.+'*'5-)*'�(,+'C�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�)99��)5@<+'1��3+�8,/�3-8'+8',9-8&+'9,-'1�5''1/��)5(9<1)56�.+'*'5-)*'�(,+'C�3+�23+�+',/35/+'/<9-)56�2+34��3+�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�,�*)(-)4�32��134'/-)(*)39'5('��/';<,9�,//,<9-��3+�/-,9?)56����11)-)35,9�)523+4,-)3535�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+�-8'���)/�,*,)9,09'�,-8--./�%%777�139�63*%,6'5()'/%781%63*'+54'5-&(35-+,(-/��3-'���;'(<-)*'��+1'+� $���6'5'+,99A�,..9)'/�-3�(35-+,(-/�/<0@'(-�-3�-8'��,*)/&�,(35��(-�-8,-�7'+'�,7,+1'1�35�3+�0'-7''5�B,5<,+A� ��,51�B,5<,+A�#"��#�##��,51�-8,-�8,*'�53-�0''5�+'5'7'1�3+�';-'51'1�35�3+�,2-'+�B,5<,+A� ���#�##���;'(<-)*'��+1'+� $���13'/�53-�,..9A�-3�(35-+,(-/�/<0@'(-�359A�-3�-8'��,*)/&�,(35��'9,-'1��(-/�+'6,+19'//�32�78'5�-8'A�7'+'�,7,+1'1���2�,�(35-+,(-�)/�/<0@'(-�-3��;'(<-)*'��+1'+� $����-8'�(35-+,(-3+�4</-�.,A�,99�(3*'+'1�73+?'+/�,-�9',/-�� �$��.'+�83<+�=3+�-8'�,..9)(,09'�7,6'�+,-'�9)/-'1�35�-8)/�7,6'�1'-'+4)5,-)35��)2�)-�)/�8)68'+>�23+�,99�83<+/�/.'5-�.'+23+4)56�35�-8'�(35-+,(-�2+34��,A�
��#�#$��-8+3<68��'('40'+� ��#�#$����8'�,..9)(,09'��;'(<-)*'��+1'+�4)5)4<4�7,6'�+,-'�7)99�0'�,1@</-'1�,55<,99A��11)-)35,9�)523+4,-)35�35�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+��;'(<-)*'��+1'+� $���)/�,*,)9,09'�,-�777�139�63*%781%63*(35-+,(-/��59)/-'1�(9,//)2)(,-)35/�5''1'1�23+�73+?�53-�)5(9<1'1�7)-8)5-8'�/(3.'�32�-8'�(9,//)2)(,-)35/�9)/-'1�4,A�0'�,11'1�,2-'+,7,+1�359A�,/�.+3*)1'1�)5�-8'�9,03+�/-,51,+1/�(35-+,(-�(9,</'/=#"� ������=,>�= >�=)))>>�&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&�8'�031A�32�',(8�7,6'�1'-'+4)5,-)35�9)/-/�-8'�(9,//)2)(,-)35/,51�7,6'�+,-'/�-8,-�8,*'�0''5�23<51�-3�0'�.+'*,)9)56�23+�-8'-A.'=/>�32�(35/-+<(-)35�,51�6'36+,.8)(�,+',�(3*'+'1�0A�-8'�7,6'1'-'+4)5,-)35���8'�(9,//)2)(,-)35/�,+'�9)/-'1�)5�,9.8,0'-)(,93+1'+�<51'+�+,-'�)1'5-)2)'+/�)51)(,-)56�78'-8'+�-8'�.,+-)(<9,++,-'�)/�,�<5)35�+,-'�=(<++'5-�<5)35�5'63-),-'1�+,-'>��,�/<+*'A+,-'��,�7')68-'1�<5)35�,*'+,6'�+,-'��,�/-,-'�,13.-'1�+,-'��3+�,/<..9'4'5-,9�(9,//)2)(,-)35�+,-'��5)35��,-'��1'5-)2)'+/
EFGFHEI�GJHE�KL MKLNOPQ
RSSTUJFFUVWNOPQFXVOYZ[YSY\W]̂VS]P̂F_MH̀HÈ àbFc HFd
| ���� | ||
| ��� | ��� | �� |
| ���� | |
| � | �� |
| ��� | ����� |
| � | �� |
| ���� | ����� | � | |
| �� | ��������� | ||
| ���� | |||
| ��� | ���� | ��� |
| �� | |
| � | �������� |
| �"� | ���� | � | ���������� | ���� | ���$��"� | ���%�����'()*��0� | � |
| ! |
| �"� | ���� | ��� |
| ���� | ��� |
| � | ���� | �� |
| �"� |
| ��0� | ��� |
| ��',-'(-.'./�� |
| � | !�"�� | ����� | |
| � | � | �� | � |
| �� | ��� | ||
| ���� | |||
| � | �"�� |
| ��� |
| �� |
| ��� | ����� | |
| ����� | ��� | |
| ���� | ����� | |
| �� | ||
| ��� | �� | � |
| � | ��� | �� |
| �" | � |
| ��� | �� | ��� |
| �� |
��123��
| � | ��� |
| �� |
| � | ����� | � |
| �� | ������� |
| ����� | " | |
| �4�5�6���� | � |
| ��� | ��� | �7� |
| �8� | ||
| ��� | ��0� | �������� |
| ��� | ��� |
| �� | ��� | ||
| ��� | ���� | ����� | |
| ��� | ����������� |
�(''9����
| � | ��� |
| ��� | ��� |
| ����� | |
| � | ����������� |
| ��� | �� | � |
| ��� |
��� :�&$% #�����;2�''('�'(-'(-.'./��������
| � | ��� | |
| ������ | ��� | |
| ��� |
| ��� | ��� | ��� |
| ��;2�� |
| �� | |
| � | �� |
| ����;����0� | � |
| ! |
| � | ���� | �� |
| �"� |
| ��0� | ��� |
| ��'(-'(-.'./� |
| �� | ||
| � | ��� | |
| � | ||
| � | ���� | �� |
| �"� |
| �� | ||
| ��� | �� | � |
| ��� | ��� | ��� |
| ���������� | ||
| ������� | ����� | |
| ��� | ||
| � | ���� | ������������� |
| �� | �� | � | |
| ���� | ��� | ||
| ���� | ��� | ���� | |
| � | ����� |
| � | ���� | � |
| �� | ������� |
| � | ��� | ||
| ������� | ������ | ��7� | |
| �8� | |||
| ��� | ��0� | �������� | |
| ��� | ��� |
| � | � |
| � | ������ |
| �� | � |
| ��� | ���� | ��4���� | �� |
| ��� |
�.)��=7�(�.6�����
| � | ��� | ||
| ������ | ��� | ������"�� |
| ����� | ��� | ||
| ���� | ��� | ��� | |
| ���� | ��� |
| � | ��� | |
| �� | ��� | |
| ��� |
| �������� | ��� | ||
| ��� | ��� | ��� | |
| �� | |||
| ���� | �������� | ||
| ��� | ��� | ||
| ��� |
| �� | |
| � | ��� |
| �������� | |
| �� | � |
| ������� | ��� | ||
| ���� | ��� | �������� | ���� |
| �� | |
| � | �� |
| ����=��������.'..���� | ||
| � | � | ������ |
| � | ����� | ��� |
| ���� | ��� | ���0� | � |
| ! |
| � | ���� | �� |
| �"� |
| ��0� | ��� |
| �>-.,-.'./�� |
| �� | ||
| � | ����� | ����"�� |
| ���� | |
| � | ����������� |
| ��� | |
| � | �� |
| ��� | ���������� | ��� |
| �� | ||
| ���������� | "�� |
| ���2�� | � | ��� | |
| � | �1�� | �� |
��2����3������ �41236�����
| �������� | |
| ��� | |
| � | ��.)��=7�(�>4�64(6�� |
| ����� | ||
| ��7� | ||
| �8� | ||
| ��� | ��0� | �������� |
| ��� | ��� |
| ��� | ����� |
| ����� | ��� |
| ��� |
�4��������6���� �
| �� | � | ���� | ||
| ��� | ||||
| � | ��.)���=�7�(�?4�6�4�6��� !�"�� | #���& .'.?�'','(-'?-.'./������ | �� | � |
| � | ��� | |
| ���� | �� |
| ����� | ||
| ���& � | � | ��� |
| ����&�� | ||
| ��.'.?���� | ||
| � | �� | ������� |
| ���"�� | ||
| �� | ||
| � | ����� | ��� |
| � | ���� |
| ������������ |
| ���� | ���� | ���0� | � |
| ! |
@ABAC@D�BEC@�FG HFGIJKL
MNNOPEAAPQRIJKLASQJTUVTNTWRXYQNXKYAZHC[C@[[\]Â _À
�#####################################################################################################$!%&�'&�&()*+!�*,+�!--&!. �-(,/& �0�1������������������������� �����2�����������3������������0���� �4�5� � ���5����������� �������������������0�������������� ������ �������������������0������������$1'���������������������������������������������������������� 0������������������ �����6�
�����0� �������,��� �4�5������� ������7 ���������
���������� �4�5������ � ��������$1'�8��������$���� �4�5���(�7 ������������� � �4���� �4�����������9 �����4�����5�
| ������3������������8���������$���� | �4�5�������������$������ | |
| �1� | ��'�4�����������������:� ��'����� | |
| �������.��������������������/������ | �����!4�� | ���+�$�������������$�����������'/������(���� |
������5������������
| ������������7 | ����������������� |
| ������������ | � |
| ��������$1'�8���������/����� | ������$����'���� | |
| ���������(�7 | ������������� | � |
�4���� �������8/$'#,�����9 �����4����5� ������3������������8���������/����� ������$����'����
| �1� | ��'�4�����������������:� ��'����� | |
| �������.��������������������/������ | �����!4�� | ���+�$�������������$�����������'/�������0�*������������� |
| �������������������� | � |
���������5���������� ����5�6������������� ��5�����������0������ ��������������7 ������4������ �1� ��!
�����������6 ����;�/<(�-������=��� ��;�/<(�-����>0�(�7 �����������4������ �4��� �������9 �����4�����5� ������3������������$������ �1� ��!
�������.��������������������/������ �����!4�� ���+�$�������������$�����������'/������������7 ������� � ��5���� �������� �����5?������������� ���5������ ������6�������5
| �������������0�����������7 | ����������� |
| ��������4�������������� | ���0�*������ |
��������������������4������������������� �����5� �5�������� ������5��������!
���������4�(�4����8��� �6��� ���5�����$����!�������8��� 0���$�������3������������!
���������4��(�4����8��� �������.��������������������/������ �����!4�� ���+�$�������������$�����������'/�������AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA����������&+'�,<�%&+&(!.�'&/* *,+B��������
CDEDFCG�EHFC�IJ KIJLMNO
PQQRSHDDSTULMNODVTMWXYWQWZU[\TQ[N\D]KF̂FĈ _̂̀Da bDb
15-PS0018
Sheet 1 of 1
SPECIAL PROVISION TO THE
STANDARD SPECIFICATIONS, EDITION 2015
COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS
SECTION 102
BIDDING REQUIREMENTS AND CONDITIONS
Page 100-13, subsection 102.5. Delete subsection 102.5a.(2)(f) and replace with the following:
(f) Kansas-funded state projects “tied to” Federal-Aid funded state projects and Kansas-funded state projects “tied with” Federal-Aid funded state projects.
10-10-17 C&M Oct-17 Letting
-2
K
A
9-
General Notes 7/16/2026
Project No.
Note
1. Concrete Rubble is to be retained by the Contractor and removed from the project.
Excavation shall be considered subsidiary to other items on the contract
2. No 28” cones will be allowed to be used for lane closures. Only 42” trim lines will be allowed to use for lane closure.
3. Lane closures longer than 3 miles require Engineer’s approval.
4. The Full Depth patch areas are to be removed and placed back in the same day. A contingency plan will need to be approved by the Engineer for unforeseen circumstances that patch areas cannot be placed back with concrete the same day as removal.
5. The Bridge End Replacement consist of removing and replacing the 12’ x 20’ sections on the Bridge Approach. This requires the addition of the epoxy coated
WWF and epoxy coated tie-bars along the longitudinal edges of the patch. The removal of the concrete bridge end is subsidiary to the bid item Concrete
Pavement Br App. The contractor is required to remove and replace the bridge end on the same day. New expansion joint material shall be installed and is subsidiary to the bid item Concrete Pavement Br App.
6. If required, material used for fine grading the existing base shall meet the requirements of
“Aggregate for Granular Base.” The fine grading and any material or water used in the process is subsidiary to other bid items on the contract and will not be measured for separate pavement.
7. Traffic control is for temporary (such as 72 hour or less) lane closures. If the closure is in place longer than allowed, temporary pavement marking is required at the taper and signs will be steel post mounted. This will be considered subsidiary to other bid items on the contract and not measured for payment.
8. All patch areas shall consist of a tined surface with spray-on cure compound placed on the patch after the tinning work is done
9. Areas of concrete to be patched include, mainline, acceleration/deceleration lanes, ramps, and shoulders as designated by the Engineer.
10. Full closure of ramps is not allowed without Engineer approval. Ramps shall be patched in a phased manner that will allow traffic to continues to use them at all times
11. All saw joints established from patching operations are to be filled full depth with hot type joint sealant. No backer material will be allowed in the joints. This work is subsidiary to other items on the contract and will not be measured for separate pavement.
70-21 KA 8159-01
Rock ex?
General Notes 7/16/2026
12. Smooth dowel bars required in full depth patching shall be subsidiary to other bid items on the project. Patches that exceed 15’ in length will require Dowel Baskets to be placed at any additional transverse joint.
13. All partial depth patches shall be 2’ x 2’ and have a minimum depth of 4”. Some partial depth patching may be performed on the bridge EWS. This will require a 1” sawcut and removal of all deteriorated concrete to the top layer of reinforcement.
14. The current average pavement section consists of 13” of PCCP on top of a two layer base.
The lower base layer consists of treated subbase, and the upper base layer consists of 4” of
CTB. Variations in pavement thickness will not be measured for payment.
15. Type III Barricades are to be placed in the closed lane at ¼ mile spacing.
16. The contractor should anticipate that base material may be bonded to the concrete pavement, and that base material may be disturbed and/or removed during full depth concrete pavement removal. If base material is disturbed or removed, removal of base and all work to bring the base back to stable grade is considered subsidiary to the patching item. If disturbed, base shall be thoroughly re-compacted using approved Aggregate for Granular
Base.
17. The final quantity for partial / full depth patching, and the locations of these patches will be determined by the KDOT field personnel once the lanes are closed to traffic.
SUMMARY OF TRAFFIC CONTROL DEVICES
(FOR INFORMATION ONLY)
All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control.
WORK ZONE SIGNS *
SIGN
NO.
SIZE – SQ. FT.
0-9.25 9.26-16.25 16.26 & OVER
R2-1 8
R4-1 4
W3-4
W3-5 4
W8-11
W14-3
W20-1 8
W20-4 6
W20-5 4
W20-7
W21-5
W8-15
W8-15P
G20-4
W4-2R/L 4
W1-4R/L 4
KG20-2 2
LIGHTED DEVICES *
WORK ZONE WARNING LIGHT
(TYPE “A” LOW INTENSITY)
WORK ZONE WARNING LIGHT
(RED TYPE ”B” HIGH INTENSITY)
ARROW DISPLAY
PORTABLE CHANGEABLE MESSAGE SIGN
BARRICADES * CHANNELIZING DEVICES *
TYPE III (4’
TO 12’)
PEDESTRIAN FIXED PORTABLE PEDESTRIAN
12 400
SUMMARY OF TRAFFIC CONTROL DEVICES
(EACH)
RECAPITULATION OF QUANTITIES
ITEM QUANTITY UNIT
WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) EADA
WORK ZONE SIGNS (9.26 TO 16.25 SQ. FT.) EADA
WORK ZONE SIGNS (16.26 SQ. FT. & OVER) EADA
WORK ZONE BARRICADES (TYPE 3 – 4’ TO 12’) EADA
WORK ZONE BARRICADES (PEDESTRIAN) EADA
CHANNELIZER (FIXED) EADA
CHANNELIZER (PORTABLE) EADA
CHANNELIZER (PEDESTRIAN) EADA
WORK ZONE WARNING LIGHT (TYPE “A” LOW INTENSITY) EADA
WORK ZONE WARNING LIGHT (RED TYPE “B” HIGH INTENSITY) EADA
ARROW DISPLAY EADA
PORTABLE CHANGEABLE MESSAGE SIGN EADA
PAVEMENT MARKING (TEMPORARY)
4" SOLID (TYPE I) STA./LINE
4" SOLID (TYPE II) STA./LINE
4" BROKEN (8')(TYPE I) STA./LINE
4" BROKEN (8')(TYPE II) STA./LINE
4" BROKEN (3')(TYPE I) STA./LINE
4" BROKEN (3')(TYPE II) STA./LINE
4" DOTTED EXTENSION (TYPE I) STA./LINE
4" DOTTED EXTENSION (TYPE II) STA./LINE
SOLID (LINE MASKING TAPE) STA./LINE
BROKEN (LINE MASKING TAPE) STA./LINE
SYMBOL (TYPE I) EACH
SYMBOL (TYPE II) EACH
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8’)) STA./LINE
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3’)) STA./LINE
PAVEMENT MARKING REMOVAL LIN. FT.
WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH
WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH
RIGID RAISED PAVEMENT MARKER (TYPE I) EACH
RIGID RAISED PAVEMENT MARKER (TYPE II) EACH
TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM
TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM
TRAFFIC CONTROL 1 LUMP SUM
FLAGGER (SET PRICE) 1 HOUR
NOTES:
Traffic control quantity is for two temporary set-ups.
If the closure is up longer than allowed and temporary marking is required, the marking will be subsidiary to other bid items.
1 11/10/16 Removed Replacement Modules Summary Table, Added “(IBS)” to Replacement Modules description
JGB
NO. DATE REVISIONS BY APP’D
TRAFFIC CONTROL
SUMMARY OF DEVICES
RECAPITULATION OF QUANTITIES
TE795
FHWA APPROVAL 06/01/15 APP’D Kristina Erickson
DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED
DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK.
WORK ZONE SIGN (SPECIAL)
SIGN NO. 16.25 SQ. FT. & LESS 16.26 SQ. FT. & OVER
Geary Co. Proj. No. 70-31 D 2111-22 Title: 70-85 D 2126-24Saline LSUM Traffic Control
50036
Dickinson 70-21 KA 8159-01
KR5-17 6
KM4-20P
KR2-6
KR2-11 2
File details come from the government source that posted it. Updated .