This is a Bid Notice from the Kansas Department of Transportation (KDOT) for a chip seal construction project on US Route 36 in Norton County. The project involves applying a chip seal surface treatment to a 9.369-mile section of US36, extending from the district/Norton County line east to 0.110 miles west of the US36/K383 junction. The work is restricted to 10 days for opening to unrestricted traffic, with a total of 20 contract working days allowed for completion. The earliest start date is June 1, 2027, and the latest start date is August 16, 2027. The letting date is August 19, 2026, with electronic proposals due by 1:00 p.m. local time on that date. Proposals will be opened and read at 3:00 p.m. local time at the Eisenhower State Office Building in Topeka, Kansas. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date. Contract execution must occur within ten business days after award notification.

The project funding source is state funds. The bid includes unit price items for mobilization, flagger services, traffic control, chip seal manipulation, cover material, flexible raised pavement markers, emulsified asphalt, and water. Contractors are required to submit proposals using AASHTO's Project Bids software and the electronic bidding system through Bid Express at http://ui.bidx.com. Contractors must complete multiple required contract provisions, including noncollusion certification, financial prequalification verification, tax clearance certification from the Kansas Department of Revenue, and acceptance or rejection of the emulsified asphalt price adjustment provision. All contractors and subcontractors must hold current Tax Clearance Certificates valid at the time of contract award. The proposal documents incorporate standard specifications, special provisions, plans, and all applicable federal and state requirements by reference.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745

Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org

Bureau of Construction and Materials

STATE PROJECT NUMBER: U036-069 KA 8025-01

CALL ORDER NUMBER: 632

PROPOSAL NUMBER: 526086323

LETTING DATE 08/19/2026

COUNTY: NORTON

FUND TYPE: STATE

PHILLIPSBURGKDOT CONSTRUCTION OFFICE:

PROJECT DESCRIPTION

CHIP SEAL. US36. FR DC/NT CL E TO .110 MI W OF THE W US36/K383

JCT IN NT CO. LGTH 9.369 MI.

RESTRICTED DAYS

(10)

TOTAL CONTRACT DAYS

(20)

JUNE 01, 2027

AUGUST 16, 2027

Earliest Start Date:

Latest Start Date:

4:46:42PM7/22/2026 @

Letting 08/19/2026 Kansas Department of Transportation Project No. U036-069 KA 8025-01

Contract No. 526086323

U036-069 KA 8025-01 U036-069 KA 8025-01

CONTRACT PROPOSAL

DOT Form No. 202 Rev. 02/19

Contract ID: 526086323

1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:

U036-069 KA 8025-01 / U036-069 KA 8025-01

The general scope, location and net length are:

CHIP SEAL. US36. FR DC/NT CL E TO .110 MI W OF THE W

US36/K383 JCT IN NT CO. LGTH 9.369 MI.

2. This is the Proposal of

[Contractor] to complete the Project for the amount set out in the accompanying Unit

Prices List.

3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:

4. Contractors and other interested entities may examine the Bidding Proposal Form/

Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract

Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.

Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".

5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project

EBSX file are available on Bid Express' website at http://ui.bidx.com.

Contractor: Page 1 Check: 9A3FC4A91C

6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.

7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW

Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.

8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.

9. The contractor shall complete work to open the project to unrestricted traffic within

_10_ Restricted Days and shall complete the work within the total Contract Working Days of _20_.

10. The Contractor shall complete the Project according to the plans, Standard

Specifications, provisions identified in the Special Provision List and all other

Contract Documents identified in Standard Specifications subsection 101.3

11. The undersigned declares that the Contractor has carefully examined the Bidding

Proposal Form for the Project. The Contractor understands the following:

A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).

B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.

C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form

202, and submits the completed EBSX file documents and bid bond to KDOT using Bid

Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the

Contractor's Proposal.

D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.

12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.

Contractor: Page 2 Check: 9A3FC4A91C

13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions

(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the

Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.

I. 08-10-66 Certification-Noncollusion & History of Debarment

II. 04-30-82 Certification-Financial Prequalification Amount

III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying

IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm

V. 10-10-00 Price Adjustment for Fuel

VI. 06-01-06 Price Adjustment for Asphalt

VII. 08-31-09 Price Adjustment for Emulsified Asphalt

VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost

IX. 05-18-07 Repair (Structures) Unit Cost

X. 11-15-17 Electric Lighting System Unit Cost

XI. 04-06-09 ITS Unit Cost

XII. 08-17-16 Water System Unit Cost

XIII. 06-19-19 Sanitary Sewer System Unit Cost

XIV. 01-01-18 Smart Work Zone System Unit Cost

XV. 08-12-24 CORS Unit Cost

XVI. 04-06-26 Federal Restrictions on Foreign Drones

XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate

14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.

15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.

I. 11-03-80 Affirmative Action For EEO

II. 11-15-96 Affirmative Action & EEO Policies

III. 09-06-94 U.S. DOT Fraud Hotline

IV. FHWA-1273 Federal-Aid Required Contract Provisions

16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.

Contractor: Page 3 Check: 9A3FC4A91C

17. SIGNATURE SECTION:

A. Electronic Internet Proposal

The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.

B. Certification

I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING

THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT

LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH

13) IS TRUE AND CORRECT.

EXECUTED ON

C. Signature

Number of company or joint venture:

Name of company or joint venture:

Name of person signing:

Title of the person signing:

Signature: Electronic Internet Proposal

RELEASED FOR CONSTRUCTION:

Date:____________________________________

Chief of Construction and Materials

Contractor: Page 4 Check: 9A3FC4A91C

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

07/15/26

STATE PROJECT NO: U036-069 KA 8025-01 STATE CONTRACT NO: 526086323

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: NORTON3

CHIP SEAL. US36. FR DC/NT CL E TO .110 MI W OF THE W US36/K383 JCT IN NT

CO. LGTH 9.369 MI.

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05

REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07

REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03

REQUIRED CONTRACT PROVISION-EMULSIFIED ASPHALT ADJUSTMENT08-31-09-R01

REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06

REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1

MINIMUM WAGE RATE (NORTON COUNTY)KS20260107

REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01

POLICY AGAINST SEXUAL HARASSMENT03-01-18

ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23

REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003

EMULSIFIED ASPHALT ADJUSTMENT15-01010

ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06

SEASONAL LIMITATIONS15-01012-R01

PROSECUTION AND PROGRESS15-01016-R04

CONTROL OF WORK15-01019-R02

BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03

SCOPE OF WORK15-01022-R04

BIDDING REQUIREMENTS AND CONDITIONS15-01023

AWARD AND EXECUTION OF CONTRACT15-01024

ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501

CHIP SEALS15-06011

WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04

WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03

WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029

STORMWATER POLLUTION MANAGEMENT15-09002-R05

GENERAL REQUIREMENT DIVISION 120015-12001-R01

STEEL SIGN POSTS15-16002-R03

IMAGE SYSTEMS15-22005-R03

RETROREFLECTIVE SHEETING15-22006-R01

ROLL-UP SIGNS15-22011

RAISED PAVEMENT MARKERS15-22015

WOOD POSTS15-23001-R03

FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02

PART V15-25001-R07

SPECIAL PROVISION LIST

PAGE:

DATE:

07/15/26

STATE PROJECT NO: U036-069 KA 8025-01 STATE CONTRACT NO: 526086323

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: NORTON3

CHIP SEAL. US36. FR DC/NT CL E TO .110 MI W OF THE W US36/K383 JCT IN NT

CO. LGTH 9.369 MI.

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

MATERIALS CERTIFICATIONS15-26001-R13

COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS15-PS0018

END OF SPECIAL PROVISION LIST

REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)

CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT

K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322

Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this

Certificate.

NONCOLLUSION

I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.

HISTORY OF DEBARMENT

I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:

1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;

2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;

3. Do not have a proposed debarment pending;

4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.

Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.

Yes No

The exceptions, if any, are:

Contractor: Page 5 Check: 9A3FC4A91C

REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)

CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT

Select the appropriate response below to indicate whether this Proposal exceeds the

Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this

Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.

I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.

If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).

KDOT Approval Granted by:

KDOT Approval Date:

Contractor: Page 6 Check: 9A3FC4A91C

REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)

CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT

LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM

Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:

This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:

Name:

Address:

City State Zip:

Business Telephone:

Contractor: Page 7 Check: 9A3FC4A91C

REQUIRED CONTRACT PROVISION - 08-31-09-R01 (Rev. 03/15)

PRICE ADJUSTMENT FOR EMULSIFIED ASPHALT

The Contractor may accept or reject the application of Special Provision 15-01010 (latest revision) "Emulsified Asphalt Price Adjustment."

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

Contractor: Page 8 Check: 9A3FC4A91C

REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)

TAX CLEARANCE CERTIFICATE

Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.

Yes No

Insert the Tax Clearance Confirmation Number if available at the time of bidding:

Contractors shall have a current Tax Clearance Certificate from the Kansas Department of

Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's

Proposal as non-responsive if the Contractor does not have a current Tax Clearance

Certificate at the time of the contract award.

To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction

ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.

After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.

If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special

Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.

Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not

"clearance" for all types of taxes the State of Kansas may assess.

Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the

Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT

Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.

Contractor: Page 9 Check: 9A3FC4A91C

Line Number Item Number Quantity Unit Unit Price Extension Price

Section 01

COMMON ITEMS

1 025323 1.000 LS

MOBILIZATION /

2 070580 1.000 HOUR $30.000 $30.00

FLAGGER (SET PRICE) /

3 025324 1.000 LS

TRAFFIC CONTROL /

Section 01 Total $30.00

Section 02

ASPHALT SURFACING ITEMS

4 012809 494.700 STA.

MANIPULATION (CHIP SEAL) /

5 010813 1373.000 CUYD

COVER MATERIAL (CM-L-2) /

6 071992 494.700 STAL

FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3 FT.)) /

7 080672 294.000 TON

EMULSIFIED ASPHALT (CRS-1HP) (SEAL) /

8 010112 1.000 MGAL $40.000 $40.00

WATER (FLEXIBLE PAVEMENT) (SET PRICE) /

Section 02 Total $40.00

Item Total $70.00

Contractor: Page 10 Check: 9A3FC4A91C

�� ������������������������������������������������������������������������������*��+����,�������������������������������������������������������������������-����������������������.���#��)/0*-�*12+)'*���/)*-3�/-�� -+44�-+���3+��/��555555556�7�5�7��������������������5��,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,�+-/�����,�����8�������������������������������������������������������������-����������������������.���#��+-/�0/-�*-9���-2��2-345555555555555555555555555555556�7:5��������������������785��,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,��2�����:,�8������:����:�����������������������������������������������������-����������������������.���#���-2��� -+;*-��/..�-/3 ��-2��5555555555555555555555556���57��������������������5���-2��� -+;*-��.43�<* �3� �4/0</=555555555555555555556��:5���������������������5���-2��� -+;*-�� 2')�3� ��3� *'555555555555555555555556���5�:�������������������5���-2��� -+;*-���03�*-��-2��555555555555555555555555556���5���������������������5���-2��� -+;*-���)+��2)��-2��55555555555555555555555556���5�:�������������������5���-3..+���/��-/4�����*-;+�*� -+;*-55555555555555555556��85���������������������5���*-;+�*'3���*12+)'*��55555555555555555555555555555556���577�������������������5�8/)*-3�/-����-+)+���'3�"+�*555555555555555555555555556��:5:7������������������858:/)*-3�/-��-/�/�'+44��-/2� '3�555555555555555555555556���57��������������������5��/)*-3�/-��-/�/�'+445555555555555555555555555555555556���5���������������������5��/)*-3�/-����-3��/-55555555555555555555555555555555556���5�8�������������������5��/)*-3�/-�����-** 555555555555555555555555555555555556���5���������������������5��/)*-3�/-�����-3)*-55555555555555555555555555555555556���5���������������������5��/)*-3�/-���-/44*-555555555555555555555555555555555556���5���������������������5��/)*-3�/-���)3;*-��>3�)"34�9�3��-*�3�*9�3� ��/��-*�*?55555555555555555555555555555555555555555556���5�7�������������������5��/)*-3�/-���'*�"3�+�5555555555555555555555555555555556���5���������������������5��/)*-3�/-���'3�*-+34��-3��.*-�;*"+�4*55555555555555556��75:��������������������5��/)*-3�/-���4/3 *-555555555555555555555555555555555556���57��������������������5�:/)*-3�/-����-3 *-�<43 *555555555555555555555555555556���5�:�������������������5��/)*-3�/-��� +��-+<2�/-5555555555555555555555555555556���5�:�������������������5��/)*-3�/-����-3�*5555555555555555555555555555555555556���5���������������������5��/)*-3�/-����/��-*�*��30555555555555555555555555555556���5���������������������5��/)*-3�/-����/��-*�*�.+�+�"+���'3�"+�*5555555555555556���5���������������������5��/)*-3�/-���<244 /@*-555555555555555555555555555555556���5���������������������57�/)*-3�/-���<-//'��0**)*-55555555555555555555555555556��75�8�������������������5��/)*-3�/-���</<�3����+ ���**-���+ �4/3 *-5555555555556���5:��������������������5��/)*-3�/-���<3��"/*�*A�3;3�/-��-3��"/*5555555555555556���5���������������������5�:/)*-3�/-���3�)"34��)43��55555555555555555555555555556��85���������������������5��

BCDCEBF�GHID�JK LJKMNOP

QRRSTHCCTUVMNOPCWUNXYZXRX[V\]UR\O]ĈLE_EB_̀_GC̀ C̀a

��"�����������������������&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&!�������&��'(')*'�+,-'�.+'/(+)0'1�23+�(+,2-�.'+23+4)563.'+,-)35�-3�78)(8�7'91)56�)/�)5()1'5-,9�::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::�3-'���;'(<-)*'��+1'+�=��>� �$�#���/-,09)/8)56��,)1��)(?��',*'23+� '1'+,9��35-+,(-3+/�,..9)'/�-3�,99�(35-+,(-/�/<0@'(-�-3�-8'�,*)/&�,(35��(-�23+�78)(8�-8'�(35-+,(-�)/�,7,+1'1�=,51�,5A/39)()-,-)35�7,/�)//<'1>�35�3+�,2-'+�B,5<,+A� $����2�-8)/(35-+,(-�)/�(3*'+'1�0A�-8'�����-8'�(35-+,(-3+�4</-�.+3*)1''4.93A''/�7)-8� �83<+�32�.,)1�/)(?�9',*'�23+�'*'+A����83<+/-8'A�73+?��<.�-3��#�83<+/�32�.,)1�/)(?�9',*'�',(8�A',+��4.93A''/�4</-�0'�.'+4)--'1�-3�</'�.,)1�/)(?�9',*'�23+�-8')+375�)995'//��)5@<+A�3+�3-8'+�8',9-8&+'9,-'1�5''1/��)5(9<1)56.+'*'5-)*'�(,+'C�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�)99��)5@<+'1��3+�8,/�3-8'+8',9-8&+'9,-'1�5''1/��)5(9<1)56�.+'*'5-)*'�(,+'C�3+�23+�+',/35/+'/<9-)56�2+34��3+�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�,�*)(-)4�32��134'/-)(*)39'5('��/';<,9�,//,<9-��3+�/-,9?)56����11)-)35,9�)523+4,-)3535�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+�-8'���)/�,*,)9,09'�,-8--./�%%777�139�63*%,6'5()'/%781%63*'+54'5-&(35-+,(-/��3-'���;'(<-)*'��+1'+� �#� �6'5'+,99A�,..9)'/�-3�(35-+,(-/�/<0@'(-�-3�-8'��,*)/&�,(35��(-�-8,-�7'+'�,7,+1'1�35�3+�0'-7''5�B,5<,+A� ��,51�B,5<,+A��"��������,51�-8,-�8,*'�53-�0''5�+'5'7'1�3+�';-'51'1�35�3+�,2-'+�B,5<,+A������������;'(<-)*'��+1'+� �#� �13'/�53-�,..9A�-3�(35-+,(-/�/<0@'(-�359A�-3�-8'��,*)/&�,(35��'9,-'1��(-/�+'6,+19'//�32�78'5�-8'A�7'+'�,7,+1'1���2�,�(35-+,(-�)/�/<0@'(-�-3��;'(<-)*'��+1'+� �#� ��-8'�(35-+,(-3+�4</-�.,A�,99�(3*'+'1�73+?'+/�,-�9',/-�� ��#��.'+�83<+�=3+�-8'�,..9)(,09'�7,6'�+,-'�9)/-'1�35�-8)/�7,6'�1'-'+4)5,-)35��)2�)-�)/�8)68'+>�23+�,99�83<+/�/.'5-�.'+23+4)56�35�-8'�(35-+,(-�2+34��,A�

�����#��-8+3<68��'('40'+�� �����#����8'�,..9)(,09'��;'(<-)*'��+1'+�4)5)4<4�7,6'�+,-'�7)99�0'�,1@</-'1�,55<,99A��11)-)35,9�)523+4,-)35�35�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+��;'(<-)*'��+1'+� �#� �)/�,*,)9,09'�,-�777�139�63*%781%63*(35-+,(-/��59)/-'1�(9,//)2)(,-)35/�5''1'1�23+�73+?�53-�)5(9<1'1�7)-8)5-8'�/(3.'�32�-8'�(9,//)2)(,-)35/�9)/-'1�4,A�0'�,11'1�,2-'+,7,+1�359A�,/�.+3*)1'1�)5�-8'�9,03+�/-,51,+1/�(35-+,(-�(9,</'/=�"� ������=,>�= >�=)))>>�&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&�8'�031A�32�',(8�7,6'�1'-'+4)5,-)35�9)/-/�-8'�(9,//)2)(,-)35/,51�7,6'�+,-'/�-8,-�8,*'�0''5�23<51�-3�0'�.+'*,)9)56�23+�-8'-A.'=/>�32�(35/-+<(-)35�,51�6'36+,.8)(�,+',�(3*'+'1�0A�-8'�7,6'1'-'+4)5,-)35���8'�(9,//)2)(,-)35/�,+'�9)/-'1�)5�,9.8,0'-)(,93+1'+�<51'+�+,-'�)1'5-)2)'+/�)51)(,-)56�78'-8'+�-8'�.,+-)(<9,++,-'�)/�,�<5)35�+,-'�=(<++'5-�<5)35�5'63-),-'1�+,-'>��,�/<+*'A+,-'��,�7')68-'1�<5)35�,*'+,6'�+,-'��,�/-,-'�,13.-'1�+,-'��3+�,/<..9'4'5-,9�(9,//)2)(,-)35�+,-'��5)35��,-'��1'5-)2)'+/

EFGFHEI�JKLG�MN OMNPQRS

TUUVWKFFWXYPQRSFZXQ[\][U[̂Y_̀XU_R̀FaOHbHEbcbJFc HFd

����
��������
����
���
��������
���
����������
�����������
����
����������
��
���������
�"�����������������������$��"����%�����'()*��0��
!
�"��������
�������
�������
�"�
��0����
��',-'(-.'./��
�!�"�������
�����
�����
����
��"��
���
��
��������
��������
���������
��
������
������
�"�
��������
��

��123��

����
��
�������
���������
�����"
�4�5�6�����
�������7�
�8�
�����0���������
������
�����
������������
��������������

�(''9����

����
������
�����
������������
������
���

��� :�&$% #�����;2�''('�'(-'(-.'./��������

����
���������
���
���������
��;2��
��
���
����;����0��
!
�������
�"�
��0����
��'(-'(-.'./�
��
����
�
�������
�"�
��
������
���������
����������
������������
���
������������������
�����
�������
�����������
������
������
���������
����
���������������7�
�8�
�����0���������
������
��
�������
���
���������4������
���

�.)��=7�(�.6�����

����
���������������"��
��������
����������
�������
����
�����
���
�����������
���������
��
������������
������
���
��
����
��������
���
����������
�������������������
��
���
����=��������.'..����
��������
���������
����������0��
!
�������
�"�
��0����
�>-.,-.'./��
��
����������"��
����
������������
���
���
����������������
��
����������"��
���2������
��1����

��2����3������ �41236�����

��������
���
���.)��=7�(�>4�64(6��
�����
��7�
�8�
�����0���������
������
��������
��������
���

�4��������6���� �

�������
���
���.)���=�7�(�?4�6�4�6��� !�"��#���& .'.?�'','(-'?-.'./���������
����
������
�����
���& �����
����&��
��.'.?����
����������
���"��
��
���������
�����
������������
�����������0��
!

@ABAC@D�EFGB�HI JHIKLMN

OPPQRFAARSTKLMNAUSLVWXVPVYTZ[SPZM[A\JC]C@]̂]EÂ GA_

�#####################################################################################################$!%&�'&�&()*+!�*,+�!--&!. �-(,/& �0�1������������������������� �����2�����������3������������0���� �4�5� � ���5����������� �������������������0�������������� ������ �������������������0������������$1'���������������������������������������������������������� 0������������������ �����6�

�����0� �������,��� �4�5������� ������7 ���������

���������� �4�5������ � ��������$1'�8��������$���� �4�5���(�7 ������������� � �4���� �4�����������9 �����4�����5�

������3������������8���������$�����4�5�������������$������
�1���'�4�����������������:� ��'�����
�������.��������������������/�����������!4�����+�$�������������$�����������'/������(����

������5������������

������������7�����������������
�������������
��������$1'�8���������/�����������$����'����
���������(�7��������������

�4���� �������8/$'#,�����9 �����4����5� ������3������������8���������/����� ������$����'����

�1���'�4�����������������:� ��'�����
�������.��������������������/�����������!4�����+�$�������������$�����������'/�������0�*�������������
���������������������

���������5���������� ����5�6������������� ��5�����������0������ ��������������7 ������4������ �1� ��!

�����������6 ����;�/<(�-������=��� ��;�/<(�-����>0�(�7 �����������4������ �4��� �������9 �����4�����5� ������3������������$������ �1� ��!

�������.��������������������/������ �����!4�� ���+�$�������������$�����������'/������������7 ������� � ��5���� �������� �����5?������������� ���5������ ������6�������5

�������������0�����������7�����������
��������4�����������������0�*������

��������������������4������������������� �����5� �5�������� ������5��������!

���������4�(�4����8��� �6��� ���5�����$����!�������8��� 0���$�������3������������!

���������4��(�4����8��� �������.��������������������/������ �����!4�� ���+�$�������������$�����������'/�������AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA����������&+'�,<�%&+&(!.�'&/* *,+B��������

CDEDFCG�HIJE�KL MKLNOPQ

RSSTUIDDUVWNOPQDXVOYZ[YSY\W]̂VS]P̂D_MF̀FC̀àHDa bDb

15-PS0018

Sheet 1 of 1

SPECIAL PROVISION TO THE

STANDARD SPECIFICATIONS, EDITION 2015

COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS

SECTION 102

BIDDING REQUIREMENTS AND CONDITIONS

Page 100-13, subsection 102.5. Delete subsection 102.5a.(2)(f) and replace with the following:

(f) Kansas-funded state projects “tied to” Federal-Aid funded state projects and Kansas-funded state projects “tied with” Federal-Aid funded state projects.

10-10-17 C&M Oct-17 Letting

RD

D

RD W-13

RD

U

RO

AD

W

RD

O

RD E 11

RD

I

RD E 2

RD W 6

RD

Z

RD

F

RD

Y

RD W-14

RD W-11

RD W-6

RD E 12

RD

D D

RD

K

RO

AD

N

RD W 3

RD

RRD

C

RD

A

RD E 1

RD W 1

RD

G

RD W 3

RD E 8

RD

B

RD

D

RD W-13

RD

P

RD

V

RD E 11

RD W 2

RD

I

RD

XRD

F

RD E 5

RD E 9

RD

B

RD

D

D

RD

Q

RD W-10

RD E 13

RD W-8

RD

L

RD W 2

RO

AD

N

RD E 7

RD

G

RD

C

RD

T

RD

A

RD

O

RD W 1

RD E 3

RD W 5

RO

AD

E

RD W-14

RD

A

A

RD

P

RD

J

RD W-15

RD W 11

RO

AD

W

RD E 4

RO

AD

E

RD

B

B

RD

Q

RD W-12

RD

L

RD E 10

RD W-9

RD

H

RO

AD

S

RD E 13

RD

Z

RD E 8

53229201785

43328211694

334272210 153

235262314

28211694

231411

136252413121

6313019

13625

763130191876

29201785

211694

103342722

15103

35262314112

13625241312

1918763130

292017853229

282116

27221510334

26231411235

2524131213625

301918763130

29201785322920

272215

12136

25241312

85322920178

21169

1033427221510

1123526

13625

9433282116

272215103

231411235262314

2413121362524

19187

313019

201785322920

21169

332821

221510334

231411

352623

2413121362524

169433

27221510334

262314

11235

25241312136

2821169433

27221510334

2623141123526

252413121

6 191876313019

201785

2116943328

2215103342722

2314112352623

2413121

30 76313019

31 31

Fir st

St an da rd

Pa ral lel S ou th

Third Guide Meridian West

Ke ith

Se be liu s

La ke

Cactus Cre ek

D utch Creek

Bo yC reek

Squaw Branch

Pr airi e Do gCr.

Buffalo Creek

Dry Creek

GameCreek

Fancy

Creek

Jones Creek

Wild catCreek

WalnutCreek

LostCreek

DeerCreek Horse Creek

MarshCreek

LongBran ch

North Fork Prairie D og Creek

Big Timber Creek

San dC reek

S pring Cr ee k

Sc ull C ree k

Coon Creek

Sa p pa Cr.

Rock Branch

Spring Branch

Robinson Creek

Elk Cr ee k

East Elk C ree k

Otte rC ree k

KY

LE

De llv ale

Or on oq ue

Re ag er

Cla yto n

Ne w

Alm elo

Le no ra Ed mo nd

Ca lve rt

De ns mo re

Alm en a

No rto n Wi ldl ife

Ar ea

Pr air ie Do g Sta te Pa rk

RS 79

RS 8

RS 847

RS 848

RS 718

RS 1515

RS 1824

RS 849

RS

RS 1517

RS 1439

RS

RS

RS 838

RS

RS 1953

RS 844

RS 1971

RS

RS 281

RS

RS

RS

RS 839

RS

RS 504

RS

60 9

Fu rna s

Gr ah am Co un ty

Co un ty

PhillipsCountyCo un ty Ha rla n

Co

Sh eri da n

DecaturCounty

Ne br as ka

Ne br as ka

°00

-99°40'

°40

°50

-99°50'

-100°00'

-100°10'

-99°40'

-99°50'

-100°00'

-100°10'

°50

°00

°40

R26W R26W

R21W

R25W

T0 2S

R24W

T0

3ST0

1S

T0 5S

R21WT0

3S

T0 4S

R23W

R24W

T0

4ST0

2S

T0 5S

T0 1S

R23W

R22W R22W

R25W

R25W R25W

R20W

R24W

T0 1S

T0

3ST0

1S

R23W

T0

4ST0

2S

R20WT0

4S

T0 5S

R22W

R23W

T0 5S

T0 3S

T0 6S

T0 2S

R22W

R21W R21W

R24W

T0 6S

Mi les

JU

NE

19s

KD

OT

m ak es no w arr an tie s, gu ara nte es , o r rep res en tat ion s f or the ac cu rac y o f th is inf orm ati on an d a ss um es no lia bil ity fo r e rro rs or om iss ion s.

GE

NE

RA

L H

IG

HW

AY

M

AP

NO

RT

ON

C

OU

NT

Y

KA

NS

AS

PR

EP

AR

ED

BY

TH

E

KA

NS

AS

D

EP

AR

TM

EN

T O F T

RA

NS

PO

RT

AT

IO

N

BU

RE

AU

O F T

RA

NS

PO

RT

AT

IO

N

PL

AN

NI

NG

IN

C

OO

PE

RA

TIO

N

WI

TH

TH

E

U.

S.

DE

PA

RT

ME

NT

O

F T

RA

NS

PO

RT

AT

IO

N

FE

DE

RA

L H

IG

HW

AY

A

DM

IN

IS

TR

AT

IO

N

HI

GH

WA

Y M

AR

KE

RS

HI

GH

WA

Y C

LA

SS

IFI

CA

TIO

NS

RO

AD

C

LA

SS

IFI

CA

TIO

NS

BO

UN

DA

RI

ES

CI

TIE

S

OR

TO

W

NS

DR

AI

NA

GE

RO

AD

S

YS

TE

M

DE

SI

GN

AT

IO

N

MA

P S

YM

BO

LS

Ru ral

Se co nd ary

S ys tem

RS

En d o f D es ign ate d S ys tem Co un ty

Ro ad

Sy ste m 1S

T R D

Co un ty Se at Po pu lat ed P lac e

Lo ca le

Ka ns as Tu rnp ike

(K

TA

Int ers tat e

Co ntr oll ed

Ac ce ss

US

R ou te

- D ivi de d

US

R ou te

- U nd ivid ed Sta te Ro ute

- D ivid ed

Sta te

Ro ute

- U nd ivi de d

RS

R ou te

- P av ed

RS

R ou te

- U np av ed Mi no r R oa d -

Pa ve d Mi no r R oa d -

G rav el Mi no r R oa d -

So il

Ro un da bo ut Int erc ha ng e Sta te Sy ste m

Br idg e Ra ilro ad

Co un ty Bo un da ry Sta te Bo un da ry

Se cti on Li ne Pa rk or

Wi ldl ife Ar ea Inc orp ora ted C ity Li mi t

Ur ba n A rea

Mi lita ry Fo rt B ou nd ary

Ind ian

R es erv ati on or

Ha lf-B ree d L an d

Int ers tat e N um be red

H igh wa y

Ka ns as Tu rnp ike

Au tho rity

U.

S.

Nu mb ere d H igh wa y

Sta te Nu mb ere d H igh wa y

La ke or R es erv oir Riv er or

Ma jor

D rai na ge

Sta te

Ca pit ol

36-69 KA 8025-01

General Notes

12/9/2025

Note

1. The contractor is responsible for establishing and maintaining centerline of the traveled way for the duration of the project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items in the contract.

2. The permanent pavement markings will be completed by KDOT.

Project No.

TYPICAL SECTION A

C

Slope Varies

Chip Seal

30’ or varies

Match Existing Surface not to scale

ROADWAY WIDTHS

Approx.

Location mile Width Square Yards

Normal Roadway 8.711 30 153,314

Widening @ County Line .045 40 1,056

Transition in and out of Widening @ County line .09 35 1,848

2’ widening west of RD W12 .180 32 3,379

Trans in and out widening @ Reager .062 37 1,346

EB and WB Widening @ Reager .096 44 2,478

Taper into 4 bridge widenings .038 33 736

Widenings at t4 bridges .109 40 2,558

Taper out 4 bridge widenings .038 33 736

Total 9.369 167,451

Beginning at DC/NT County Line Then East 9.369 miles to .110 miles West of the West JCT. US

RATE OF APPLICATION

Cover Material CML-2 @ .0082 yd3/yd2 Emulsified Asphalt (CRS-1HP) @ .42 gal/yd2

Date: 12/9/2025 3:01 PM

KANSAS DEPARTMENT OF

TRANSPORTATION

Norton Co. PROJ. NO. Chip Seal

SUMMARY OF TRAFFIC CONTROL DEVICES

(FOR INFORMATION ONLY)

All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control.

WORK ZONE SIGNS *

SIGN

NO.

SIZE – SQ. FT.

0-9.25 9.26-16.25 16.26 & OVER

R2-1 R4-1 W3-4 W3-5

W8-11 W14-3 W20-1 W20-4 W20-5 W20-7 W21-5 W8-15

W8-15P

KM4-20

KG20-2

LIGHTED DEVICES *

WORK ZONE WARNING LIGHT

(TYPE “A” LOW INTENSITY)

WORK ZONE WARNING LIGHT

(RED TYPE ”B” HIGH INTENSITY)

ARROW DISPLAY

PORTABLE CHANGEABLE MESSAGE SIGN

BARRICADES * CHANNELIZING DEVICES *

TYPE III (4’

TO 12’)

PEDESTRIAN FIXED PORTABLE PEDESTRIAN

SUMMARY OF TRAFFIC CONTROL DEVICES

(EACH)

RECAPITULATION OF QUANTITIES

ITEM QUANTITY UNIT

WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) EADA

WORK ZONE SIGNS (9.26 TO 16.25 SQ. FT.) EADA

WORK ZONE SIGNS (16.26 SQ. FT. & OVER) EADA

WORK ZONE BARRICADES (TYPE 3 – 4’ TO 12’) EADA

WORK ZONE BARRICADES (PEDESTRIAN) EADA

CHANNELIZER (FIXED) EADA

CHANNELIZER (PORTABLE) EADA

CHANNELIZER (PEDESTRIAN) EADA

WORK ZONE WARNING LIGHT (TYPE “A” LOW INTENSITY) EADA

WORK ZONE WARNING LIGHT (RED TYPE “B” HIGH INTENSITY) EADA

ARROW DISPLAY EADA

PORTABLE CHANGEABLE MESSAGE SIGN EADA

PAVEMENT MARKING (TEMPORARY)

4" SOLID (TYPE I) STA./LINE

4" SOLID (TYPE II) STA./LINE

4" BROKEN (8')(TYPE I) STA./LINE

4" BROKEN (8')(TYPE II) STA./LINE

4" BROKEN (3')(TYPE I) STA./LINE

4" BROKEN (3')(TYPE II) STA./LINE

4" DOTTED EXTENSION (TYPE I) STA./LINE

4" DOTTED EXTENSION (TYPE II) STA./LINE

SOLID (LINE MASKING TAPE) STA./LINE

BROKEN (LINE MASKING TAPE) STA./LINE

SYMBOL (TYPE I) EACH

SYMBOL (TYPE II) EACH

FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8’)) STA./LINE

FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3’)) STA./LINE

PAVEMENT MARKING REMOVAL LIN. FT.

WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH

WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH

RIGID RAISED PAVEMENT MARKER (TYPE I) EACH

RIGID RAISED PAVEMENT MARKER (TYPE II) EACH

TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM

TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM

TRAFFIC CONTROL 1 LUMP SUM

FLAGGER (SET PRICE) 1 HOUR

NOTES:

1 11/10/16 Removed Replacement Modules Summary Table, Added

“(IBS)” to Replacement Modules description

JGB

NO. DATE REVISIONS BY APP’D

TRAFFIC CONTROL

SUMMARY OF DEVICES

RECAPITULATION OF QUANTITIES

TE795

FHWA APPROVAL 06/01/15 APP’D Kristina Erickson

DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED

DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK.

WORK ZONE SIGN (SPECIAL)

SIGN NO. 16.25 SQ. FT. & LESS 16.26 SQ. FT. & OVER

Co. Proj. No. Title: Page 4 of 4

KG20-5

KR2-6 2

KR2-11 2

494.7

Norton 36-69 KA 8025-01 Traffic Control

KR5-17 2